|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE Zune 15 1989 COMPLETED BY D.M Bonett TELEPHONE 407 694-4432 MONTH Ma 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)5/1/89 5/2/89'5/3/89 5/0/89 5/5'/89 5/S/89 5/7/89 5/8/S9 5/9/89 5/10/89 5/li/89 5/12/89 5/13/89 5/10/89 5/15/89 5/1$/89 5/17/89 5/18/89 5/19/89 5/20/89 5/21/89/2/89 5/23/89 5/24/89 5/25/89 5/2S/8'9 5/27/S9 5/28/89'5/29/89 5/30/89 5/31/89-3"3-3-3-3-3-3-3-3-3-3-3-3-3-3-3-3"3-2 2-3-2-2 2-2-2-2-2-2 890b200350 890bi>PDR ADQCK 05000250 R PNU y~
OPERATXNG STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 6/15/89 COMPLETED BY D+Mi BONETT TELEPHONE 407/694/4432 1.UNIT NAME: TURKEY-POINT UNXT 3 2.REPORTING PERIOD+MAY 1989 3 i LICENSED THERMAL POHER (MWT):~2ee 4, NAMEPI ATE RATING (GROSS MME).: 760 5, DESIGN ELECTRICAL RATING (NET MME>: 693 6+MAXXMUM DEPENDABLE CAPACITY (GROSS MWE>: 699 7.M*XXMUM DEPENDABLE CAPACITY (NET MHE)+.666 8 XF CHANGES'OCCUR XN CAPACITY RATINGS (ITEMS NUMBER'THROUGH 7)SXNCE LAST'REPORT r GIVE REASONS+9.POWER LEVEL TO HHICH RESTRICTED~
XF*NY.<NET MHE)iei RE*SONS FOR RESTRICTIONS'F ANY+-MONTHLY-YTD-CUMULATXVE HOURS IN REPORT'PERXODt 12'UMBER OF HOURS REACTOR HAS CRITICAL 13m REACTOR RESERVE SHUTDOHN HOURS 14 i HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOHN HOURS 16m GROSS THERMAL FNERGY GENERATED (MHH)17+GROSS ELECTRXCAL ENERGY GENERATED<MHH)18.NET ELECTRICAL ENERGY GENERATED (MHH)UNIT SERVICE FACTOR 2e i UNXT AVAILABILITY FACTOR 21.CAPACITY FACTOR<USXNG MDC NET,)22'APACITY FACTOR (USXNG, DER NET)23, UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 ewe ewe ewe eie 0 e-2684 eie ewe eie e,e eie 3623 123io2 ewe 1154.4 eie 2394053 780140 719196 31+9 31+9 29 i 8 28 i 6 42o4 144536+6 94614+8 844 i 4 93311.7 121+8 193587802 620426665864974e 64i6 64i6 62+2 58i6 13 t'3 25, IF SHUT DOWN*T END OF REPORT PERIOD~ESTIMATED DATE OF STARTUP;06/2e/89 II 0 REPORT MONTH Na, 1989 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.5" UNlT NAME Turke Point f3 June 15, 1989 COMPLETED BY D.H.Bonett~47 6 Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report¹System Code4 Component Code5 Cause&Corrective Actionto Prevent Recurrence 04 890329 S 72.0 ZZ ZZZZZZ Unit 3 remained shutdown to a11ow for RCCO Requa1ification Exams for Licensed Operators.
05 890504 S 672.0 SF INSTRU Unit 3 shutdown was further extended for the containment pressure switch repair.F Forced S Scheduled Reason A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-LoadReduction 9-Other (Explain)4 Exhibit G-instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)
File (NUREG4161) 5 Exhibit 1-Same Source Ik 0
SUMMARY
OF OPERATING EXPERIENCE, DOCKET NO.50-250 UNIT Turke Point 3 DATE Zune 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit 3 remained shutdown to allow for RCCO Requalification Exams for Licensed Operators.
The shutdown was further extended for the containment pressure switch repair.,
II 0 AVERAGE DA1LY UNIT POWER LEVEL DOCKET NO.50-251 UNIT Turke Point 4 DATE June 15 1989 COMPLETED BY D M.Bonett TELEPHONE 407 694-4432 DAY'ONTH Ma 1989 AVERAGE DAILY POWER LEVEL (MWe-Net)5/1/89 5/2/89 5/3/89 5/0/89 5/5/89 5/6/89 5/7/$9 5/8/89 5/'/89 5/10/8'9 5/li/89 5/12/89 5/13/89 5/14/89'/15/89 5/16/89 5/17/89 5/18/89 5/19/89 5/20/8'9 5/21/89 5/22'/89 5/23/89 5/24/89 5/25/89 5/26/89 5/27/8'9 5/28/89 5/29/89 5/30/89'/31/89 19-18-16-17-17-18-1:7-19-15-8-8-8-8-9-9-18-18-18-19-21-21'70-20 Pp e-16-13-7 5 0
OPERATING STATUS OPER*TIHG DATA REF'ORT DOCKET NO 50-251 DATE 6/15/g9 COMPLETED BY Di Mo BOHETT TELEF'HONE 407/694/4432 1 UNIT NAME: TURKEY.POXHT UNIT 2.RF'PORTING PERIOD: MAY 1989 3.LICENSED THERM*L POHER (MHT)'200 4.NAMEF'LATE RATING (GROSS MME)+760 5+DFSIGN ELECTRIC*L RATING (HET MME): 693 6+M*XIMUM DEPENDABLE CAPACITY (GROSS MME)+699 7.M*XIMUM DEPENDABLE CAPACITY ('HET MME):.666 8 IF CHANGES OCCUR IN CAF'ACITY'RATXNGS (ITEMS NUMBFR 3 THROUGH 7)SXHCE.LAST REPORT r GIVE REASOHS: 9i POHER LEVEL TO WHICH RESTRXCTEDr IF*HY (HET MME)10.REASONS FOR RESTRXCTIONS IF AHY'ONTHLY-YTD-CUMULATIVE
.11+HOURS IN REPORT F'ERIOD o 12+NUMBER OF HOURS REACTOR WAS CRITICAL 13'EACTOR RESERVE SHUTDOHH HOURS 14+HOURS GENER*TOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS lb.GROSS TIIERMAL ENERGY GENERATED (MHH)17'ROSS ELECTRICAL ENERGY GENERATED (MHH)18, NET EL'ECTRICAL ENERGY GENERATED'(MHH)19i UNIT SERVICE FACTOR 20, UNIT A VAILABILXTY FACTOR 2%i CAF'.ACXTY FACTOR (USING MDC NET)22.'CAPACITY FACTOR (USXHG DER HET)'3 i UNIT'FORCED OUTAGE RATE 24'I.IUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 744 70i9'iO eiO 0'i 0 0 0-12000 0.0 0+0 8.0 OiO e,e 3623.7e OiO OiO Oie 0 0-19666 0.0 OiO 0.0 eoO e,.e 138268iO 90307+5 166+6 87194+1 32+1 184082420 58748802 55563593 63+1 63.1 61+6 58iO 11.4 25, 1F,SHUT DOHN AT END OF REF'ORT PERIOD r ESTIMATED DATE OF'STARTUP: 06/12/89 0
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Ma, 1989 DOCKET NO.50-251 UNIT NAME Turke P t June 15 1989 COMPLETED BY D.N.Bonett TELEPHONE Date Type Duration (Kours)Reason~Method of Shutting Down Reactor Licensee Event Report i'ystem Code4 Component Code'ause&Corrective Action to PreventRecurrence 880920 S 744.0 RC FUELXX Unit f4 remained shutdown for refueling and scheduled maintenance.
F Forced S Scheduled Reason A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)
Exhibit G-Instructions for Preparation of Data EntryScheetsLicensee Event Report (LER)File (NUREG%161)
Exhibit1-Same Source 09'I 587
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-335 UNIT St.Lucie 1 DATE June 15 1989 COMPLETED BY D M.Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit 1 operated at essentially full power and had no shutdowns or ,significant power reductions.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.
II AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-389 UNIT St.Lucie 2 DATE June 15 1989 COMPLETED BY D M.Bonett TELEPHONE 407 694-4432 MONTH Ma DAY AVERAGE DAILY 1989 POWER LEVEL (MWe-Net)5/1/89 5/2/89 5/3/89 5/4/89'5/5/89 5/6/S9 5/7/89 5/8/89 5/9/89 5/18/89 5/11/S9 5/12/S9 5/13/89 5/14/89 5/15/S9 5/16/89 5/17/89 5/1S/89 5/19/89 5/20/89 5/21/89 5/22/8'9 5/23/89 5/24/89 5/25/89 5/26/89 5/27/89 5/28/89 5/29/89 5/30/89 5/31/89 547$60 677 729 733 737 727 75$818 829 858 858 857 858 856 85$857 857 854 S56 856 858 861 8'h3 863 858 856 857 856 84$849
OPERATING STATUS OPERATING DATA REF'ORT DOCI(ET HO 50-389 DATE 6/15/89 COMPLETED BY D-.Mi BOHETT TELEPHONE 407/694/4432 li UNIT NAME+, ST+LUCIE UNXT 2 2 o REPORTING PERIOD'AY 1989 3+LICEHSED THERMAL POWER (MWT)+2700 NAMEF'LATE RATING (GROSS MWE)f 850 5i DESIGN ELECTRXC*L R*TING (NET MWE)o 830 6, M*XIMUM DEF'ENDABLE CAPACITY (GROSS MWE): 882 7+MAXIMUM DEPEND*BLE CAP*CITY (HET MWE): 839'8 IF-CHANGES OCCUR XN CAP*CITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT r GXVE REASOHS'.POWER LEVEL TO WHICH RESTRXCTEDr IF AHY (HET MWE)10'E*SOHS FOR RESTRXCTIOHSr IF'ANY+MONTHLY-YTD-CUMULATXVE 11.+HOURS XH REF'ORT PERIODS 12.NUMBER OF HOURS REACTOR<WAS'CRITICAL 13'EACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15m UNXT RESERVE SHUTDOWH HOURS 16+GROSS THERMAL ENERGY GENERATED (MWH)17,'GROSS.ELECTRICAL ENERGY GENERATED (MWH)18'ET ELECTRXCAL ENERGY GENERATED (MWH)19'NXT SERVICE'FACTOR 20 i UNIT A VAILABILXTY FACTOR 2ir CAPAC1TY FACTOR (USING MDC NET)22CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24+SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744+0 OiO 744+0 eiO 1908054 638690 684894 100 i 0 100oO 96 i-9 98iO 0.0 3623 1586i3 OiO 1533oO OiO 3957439 131'7530 1233750 42'+3 42o3 40+6 4iie e e 50976rO 43128+3 e,e 42354+6 0 i 0 110441'109 36814370 34808643 83+1 83'83+2 83i2 5i6 25 i XF SHUT DOWN AT EHD OF REF'ORT PERIOD r ESTIMATED DATE OF STARTUP i
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.50-389 ll DATE June 15.1989 COMPLETED BY.D.M.Bonett 9 Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report iti System Code4 Component Codes Cause&Corrective Actionto Prevent Recurrence 04 890430 S 0.0 HA TURBIN Unit f2 was held at reduced power for physics testing.05 890502 F 0.0 HF FILTER'he-unit was held at reduced power for traveling screen repair.The unit then returned to full power operation.
F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Er'ror (Explain)H-Other (Explain)Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)
File (NUREG4161)
Exhibit1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-389 UNIT St Lucie 2 DATE.June 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit g2 was held at reduced power for physics testing and for the repair of the 2A2 traveling screen.The unit then returned to full power operation.
In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period'.
41