Monthly Operating Repts for May 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2
ML17345A750
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 05/31/1989
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345A749 List:
References
NUDOCS 8906200350
Download: ML17345A750 (24)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE Zune 15 1989 COMPLETED BY D. M Bonett TELEPHONE 407 694-4432 MONTH Ma 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 5/ 1/89 -3 5/ 2/89 "3

'5/ 3/89 -3 5/ 0/89 5/ 5'/89 -3 5/ S/89 -3 5/ 7/89 5/ 8/S9 -3 5/ 9/89 -3 5/10/89 -3 5/li/89 -3 5/12/89 -3 5/13/89 -3 5/10/89 -3 5/15/89 -3 5/1$ /89 -3 5/17/89 -3 5/18/89 -3 5/19/89 -3 5/20/89 "3 5/21/89 -2

/ 2/89 2

-3 5/23/89 5/24/89 -2 5/25/89 -2 5/2S/8'9 2 5/27/S9 -2 5/28/89 -2

'5/29/89 -2 5/30/89 -2 5/31/89 -2 890b200350 890bi>

PDR ADQCK 05000250 R PNU

y~

OPERATING DATA REPORT DOCKET NO 50 250 DATE 6/15/89 COMPLETED BY D+ Mi BONETT TELEPHONE 407/694/4432 OPERATXNG STATUS

1. UNIT NAME: TURKEY -POINT UNXT 3
2. REPORTING PERIOD+ MAY 1989 3 i LICENSED THERMAL POHER ( MWT ): ~2ee 4, NAMEPI ATE RATING (GROSS MME).: 760 5, DESIGN ELECTRICAL RATING (NET MME>: 693 6+ MAXXMUM DEPENDABLE CAPACITY (GROSS MWE>: 699
7. M*XXMUM DEPENDABLE CAPACITY (NET MHE)+ . 666 8 XF CHANGES 'OCCUR XN CAPACITY RATINGS (ITEMS NUMBER' THROUGH 7)

SXNCE LAST 'REPORT r GIVE REASONS+

9. POWER LEVEL TO HHICH RESTRICTED~ XF *NY .<NET MHE) iei RE*SONS FOR RESTRICTIONS'F ANY+

-MONTHLY -YTD- CUMULATXVE HOURS IN REPORT 'PERXODt 744 3623 144536+6 12'UMBER OF HOURS REACTOR HAS CRITICAL ewe 123io2 94614+8 13m REACTOR RESERVE SHUTDOHN HOURS ewe ewe 844 i 4 14 i HOURS GENERATOR ON-LINE ewe 1154.4 93311.7

15. UNIT RESERVE SHUTDOHN HOURS eie eie 121+8 16m GROSS THERMAL FNERGY GENERATED (MHH) 0 2394053 193587802 17+ GROSS ELECTRXCAL ENERGY GENERATED <MHH) e 780140 62042666
18. NET ELECTRICAL ENERGY GENERATED (MHH) -2684 719196 5864974e UNIT SERVICE FACTOR eie 31+9 64i6 2e i UNXT AVAILABILITYFACTOR ewe 31+9 64i6
21. CAPACITY FACTOR <USXNG MDC NET,) eie 29 i 8 62+2 22'APACITY FACTOR (USXNG, DER NET) e,e 28 i 6 58i6 23, UNIT FORCED OUTAGE RATE eie 42o4 13 t'3
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25, IF SHUT DOWN *T END OF REPORT PERIOD~ ESTIMATED DATE OF STARTUP; 06/2e/89

II 0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 5 "

UNlT NAME Turke Point f3 June 15, 1989 COMPLETED BY D. H. Bonett REPORT MONTH Na, 1989 ~47 6 Method of Shutting Licensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Code5 Prevent Recurrence 04 890329 S 72.0 ZZ ZZZZZZ Unit 3 remained shutdown to a11ow for RCCO Requa1ification Exams for Licensed Operators.

05 890504 S 672.0 SF INSTRU Unit 3 shutdown was further extended for the containment pressure switch repair.

4 F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training &License Examination 5- LoadReduction F - Administrative 9 - Other (Explain) 5 G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

Ik 0

SUMMARY

OF OPERATING EXPERIENCE, DOCKET NO. 50-250 UNIT Turke Point 3 DATE Zune 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit 3 remained shutdown to allow for RCCO Requalification Exams for Licensed Operators.

The shutdown was further extended for the containment pressure switch repair.,

II 0 AVERAGE DA1LY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE June 15 1989 COMPLETED BY D M. Bonett TELEPHONE 407 694-4432 Ma 1989 DAY'ONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 5/ 1/89 -16 5/ 2/89 -19 5/ 3/89 -18 5/ 0/89 -16 5/ 5/89 -17 5/ 6/89 -17 5/ 7/$ 9 -18 5/ 8/89 -1:7 5/'/89 5/10/8'9 -19 5/li/89 15 5/12/89 -8 5/13/89 -8 5/14/89'/15/89

-8

-8 5/16/89 -9 5/17/89 -9 5/18/89 -18 5/19/89 -18 5/20/8'9 -18 5/21/89 -19 5/22'/89 -21 5/23/89 -21 5/24/89 '70 5/25/89 -20 5/26/89 Pp 5/27/8'9 e 5/28/89 -16 5/29/89 -13 5/30/89'/31/89

-7 5

0 OPER*TIHG DATA REF'ORT DOCKET NO 50 251 DATE 6/15/g9 COMPLETED BY Di Mo BOHETT TELEF'HONE 407/694/4432 OPERATING STATUS 1

2.

3.

4.

UNIT NAME: TURKEY .POXHT RF'PORTING PERIOD:

UNIT MAY 1989 LICENSED THERM*L POHER ( MHT )

NAMEF'LATE RATING (GROSS MME) +

5+ DFSIGN ELECTRIC*L RATING (HET MME):

'200 6+ M*XIMUM DEPENDABLE CAPACITY (GROSS MME) +

760 693 699

7. M*XIMUM DEPENDABLE CAPACITY ('HET MME): . 666 8 IF CHANGES OCCUR IN CAF'ACITY'RATXNGS (ITEMS NUMBFR 3 THROUGH 7)

SXHCE .LAST REPORT r GIVE REASOHS:

9i POHER LEVEL TO WHICH RESTRXCTEDr IF *HY (HET MME)

10. REASONS FOR RESTRXCTIONS IF AHY

'ONTHLY - YTD- CUMULATIVE

. 11+ HOURS IN REPORT F'ERIOD o 744 3623 138268iO 12+ NUMBER OF HOURS REACTOR WAS CRITICAL 70i9'iO .7e 90307+5 13'EACTOR RESERVE SHUTDOHH HOURS OiO 166+6 14+ HOURS GENER*TOR ON-LINE eiO OiO 87194+1

15. UNIT RESERVE SHUTDOWN HOURS 0'i 0 Oie 32+1 lb. GROSS TIIERMAL ENERGY GENERATED (MHH) 0 0 184082420 17'ROSS ELECTRICAL ENERGY GENERATED (MHH) 0 0 58748802 18, NET EL'ECTRICAL ENERGY GENERATED '(MHH) -12000 -19666 55563593 19i UNIT SERVICE FACTOR 0.0 0.0 63+1 20, UNIT A VAILABILXTYFACTOR 0+0 OiO 63.1 2%i CAF'.ACXTY FACTOR (USING MDC NET) 8.0 0.0 61+6
22. 'CAPACITY FACTOR (USXHG DER HET)'3 OiO eoO 58iO i UNIT 'FORCED OUTAGE RATE e,e e,.e 11.4 24'I.IUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25, 1F,SHUT DOHN AT END OF REF'ORT PERIOD r ESTIMATED DATE OF 'STARTUP: 06/12/89

0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke P t June 15 1989 COMPLETED BY D. N. Bonett REPORT MONTH Ma, 1989 TELEPHONE Method of Date Type Duration (Kours) Reason~

Shutting Down Reactor Licensee Event Report i'ystem Code4 Code'ause Component

& Corrective Action to PreventRecurrence 880920 S 744. 0 RC FUELXX Unit f4 remained shutdown for refueling and scheduled maintenance.

F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain) 09'I 587

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie 1 DATE June 15 1989 COMPLETED BY D M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit 1 operated at essentially full power and had no shutdowns or

,significant power reductions.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.

II AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 2 DATE June 15 1989 COMPLETED BY D M. Bonett TELEPHONE 407 694-4432 MONTH Ma 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 5/ 1/89 547 5/ 2/89 $ 60 5/ 3/89 677 5/ 4/89 729

'5/ 5/89 733 5/ 6/S9 737 5/ 7/89 727 5/ 8/89 75$

5/ 9/89 818 5/18/89 829 5/11/S9 858 5/12/S9 858 5/13/89 857 5/14/89 858 5/15/S9 856 5/16/89 85$

5/17/89 857 5/1S/89 857 5/19/89 854 5/20/89 S56 5/21/89 856 5/22/8'9 858 5/23/89 861 5/24/89 8'h3 5/25/89 863 5/26/89 858 5/27/89 856 5/28/89 857 5/29/89 856 5/30/89 84$

5/31/89 849

OPERATING DATA REF'ORT DOCI(ET HO 50 389 DATE 6/15/89 COMPLETED BY D-. Mi BOHETT TELEPHONE 407/694/4432 OPERATING STATUS li 2 o REPORTING PERIOD 'AY UNIT NAME+, ST+ LUCIE UNXT 2 3+ LICEHSED THERMAL POWER (MWT) +

1989 2700 NAMEF'LATE RATING ( GROSS MWE ) f 850 5i DESIGN ELECTRXC*L R*TING (NET MWE) o 830 6, M*XIMUM DEF'ENDABLE CAPACITY (GROSS MWE): 882 7+ MAXIMUM DEPEND*BLE CAP*CITY (HET MWE): 839

'8 IF -CHANGES OCCUR XN CAP*CITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT r GXVE REASOHS POWER LEVEL TO WHICH RESTRXCTEDr IF AHY (HET MWE) 10'E*SOHS FOR RESTRXCTIOHSr IF 'ANY+

MONTHLY -YTD- CUMULATXVE 11.+ HOURS XH REF'ORT PERIODS 744 3623 50976rO

12. NUMBER OF HOURS REACTOR< WAS 'CRITICAL 744+0 1586i3 43128+3 13'EACTOR RESERVE SHUTDOWN HOURS OiO OiO e,e
14. HOURS GENERATOR ON-LINE 744+0 1533oO 42354+6 15m UNXT RESERVE SHUTDOWH HOURS eiO OiO 0 i0 16+ GROSS THERMAL ENERGY GENERATED (MWH) 1908054 3957439 110441'109 17, 'GROSS. ELECTRICAL ENERGY GENERATED (MWH) 638690 131'7530 36814370 18'ET ELECTRXCAL ENERGY GENERATED (MWH) 684894 1233750 34808643 19'NXT SERVICE 'FACTOR 100 i 0 42'+ 3 83+1 20 i UNIT A VAILABILXTYFACTOR 100oO 42o3 83' 2ir CAPAC1TY FACTOR (USING MDC NET) 96 i-9 40+6 83+2 22 CAPACITY FACTOR (USING DER NET) 98iO 4iie 83i2
23. UNIT FORCED OUTAGE RATE 0.0 e e 5i6 24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 i XF SHUT DOWN AT EHD OF REF'ORT PERIOD r ESTIMATED DATE OF STARTUP i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-389 June 15. 1989 ll DATE COMPLETED BY .D. M. Bonett REPORT MONTH 9 Method of Shutting Ucensee Cause & Corrective Duration Down Event System Component Actionto Date Type (Hours) Reason~ Reactor Report iti Code4 Codes Prevent Recurrence 04 890430 S 0.0 HA TURBIN Unit f2 was held at reduced power for physics testing.

05 890502 F 0.0 HF FILTER 'he-unit was held at reduced power for traveling screen repair. The unit then returned to full power operation.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Er'ror (Explain) Exhibit1-Same Source H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St Lucie 2 DATE. June 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Ma 1989 Unit g2 was held at reduced power for physics testing and for the repair of the 2A2 traveling screen. The unit then returned to full power operation.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period'.