Text
UNIT SHUTDOWNS AND POWER REDUCTIONS
- CORRECTED COPY*
REPORT MONTH A ri 1 1989 DOCKET NO.
50-P UNlTNAME St. Lucie 2
~M 9
COMPLETED By 0.
H. Bonett 01 02 03 04 Date 890131 890428 890429 890430 Type~
Duration (Hours) 663. 9 0.0 8.2 0.0 Method of Shutting Down Reactor*
Ucensee Event Report ¹ System Component Code~
Codes RC FUELXX HA TURB IN HA TURBIN HA TURBIN Cause a Corrective Actionto Prevent Recurrence Unit 82 remained shutdown for refueling and scheduled maintenance.
While returning to full power from refueling outage, the unit was held at 25% for physics test and reduced power to perform turbine overspeed trip test.
Performed overspeed trip test as part of power ascension program.
Unit was held at 50K power for physics test.
F Forced S Scheduled 890b2i0009 5000250 890b15 pDR ADOCK o pgU R
2 Reason A-Equipment FaIur'e (Exphin)
~ B - Mintenance orTest C - RefueIng D - Regulatory Restriction E - Operator Trahing a Ucense Examination F - Administrative G - Operational Error(Explain)
H - Other(Exphin)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explin) 4 ExhibitG-instructions forPfepata5onof Data EntryScheets Licensee Event Report(LER) Re (NUREGO161)