ML20140H821

From kanterella
Revision as of 11:31, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Notice of Withdrawal of Application for Amend Request to OLs DPR-44 & DPR-56.Proposed Changes Would Have Modified Facility TSs Re Frequency of Calibr for Local Power Range Monitor Signals
ML20140H821
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/07/1997
From: James Shea
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20140H825 List:
References
TAC-M91303, TAC-M91304, NUDOCS 9705130289
Download: ML20140H821 (3)


Text

. ._ . . - . . . .- __ - .

May 7,1997 o

Mr. George A. Hunger. Jr.

Director-Licensing. MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. M91303 AND M91304)

Dear Mr. Hunger:

By letter dated January 13, 1995, as su]plemented by letter dated June 2.

1995. you applied for an amendment to t1e Peach Bottom Atomic Power Station.

Units 2 and 3. Operating License Nos. DPR-44 and DPR-56. The proposed changes would have modified the facility Technical Specifications pertaining to the frequency of calibration for the local power range monitor signals.

Subsequently, by letter dated March 19, 1997. you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of A) plication for 4

Amendment to Facility Operating License with the Office of the rederal Register for publication.

Sincerely.

/s/

4 Joseph W. Shea. Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation )

4 Docket Nos. 50-277/278

Enclosure:

Notice of Withdrawal cc w/ encl: See next page DISTRIBUTION:

Docket File SVarga M0'Brien ACRS PUBLIC JShea JStolz GGolub PDI-2 Readingq OGC MModes RI 0FFICE PDN2#ti PDI-2/M PDI-2/DA 4 PDI-2 ,/

NAME CSNNw NBrien JStolz /k MHaF8 DATE ( N /97 O/4/97 f / 4/97" 6 /(0/97 0FFICIAL RECORD COPY DOCUMENT NAME: 6:\ HART \PB91303.WDW 13c029

a" 88g 3;888 6 NRC FitE CENTER C8PY P PDR

,,-.m *.

p UNITED STATES s* j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3o066-0001

% ,,,g # May 7, 1997 Mr. George A. Hunger. Jr.

Director-Licensing. MC 62A-1 PECO Energy Company .

Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 - WITHDRAWAL OF AN AMENDMENT RE0 VEST (TAC NOS. M91303 AND M91304)

Dear Mr. Hunger:

By letter dated January 13, 1995, as su)plemented by letter dated June 2.

1995. you applied for an amendment to t1e Peach Bottom Atomic Power Station.

Units 2 and 3. Operating License Nos. DPR-44 and DPR-56. The proposed changes would have modified tne facility Technical Specifications pertaining to the frequency of calibration for the local power range monitor signals.

Subsequently, by letter dated March 19. 1997. you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of A) plication for Amendment to Facility Operating License with the Office of the rederal Register for publication.

Sin "el .

JqsehhW.Shea.ProjectManager Pr'oject Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/50-278

Enclosure:

Notice of Withdrawal cc w/ enc 1: See next page

l 3 ._ ,

Mr. George A. Hunger, Jr. Peach Bottom Atomic Power Station,
PECO Energy Company Units 2 and 3 cc
l

'J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety j Sr. V.P. & General Counsel -

PA Dept. of PECO Energy Company Environmental Resources j l '2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 l PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors ,

Peach Bottom Atomic Power Station Peach Bottom Township i 1848 Lay Road R. D. #1

Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-55 Engineering Division Peach Bottom Atomic Power Station Chief Engineer ,

, 1848 Lay Road 6 St. Paul Centre i

- Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean  ;

U.S. Nuclear Regulatory Commission Power Plant and Environmental  !

Peach Bottom Atomic Power Station Review Division l P.O. Box 399 Department of Natural Resources l

Delta, PA 17314 B-3, Tawes State Office Building i Annapolis, MD _21401 l Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud

' 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club ,

433 Orlando Avenue 4 Mr. Roland Fletcher - State College, PA 16803 Department of Environment 4 . 201 West Preston Street Manager-Business & Co-owner Affairs j Baltimore, MD 21201 Public Service Electric and Gas
- Company i A. F. Kirby, III P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236

, Delmarva Power & Light Company i

P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company I PECO Energy Company Nuclear Group Headquarters

. Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA 17314 O

l i