IR 05000260/2013201

From kanterella
Revision as of 12:12, 13 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
07/24/2013 Summary of Public Conference Meeting With Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater Than Green Finding Associated With One Apparent Violation Documented in NRC Inspection Report 05000260
ML13212A084
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/30/2013
From: Shaeffer S M
Reactor Projects Region 2 Branch 6
To: Shea J W
Tennessee Valley Authority
References
EA-13-118, IR-13-012
Download: ML13212A084 (37)


Text

July 30, 2013

EA-13-0118 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT: PUBLIC MEETING SUMMARY - REGULATORY CONFERENCE FOR BROWNS FERRY NUCLEAR PLANT, DOCKET NO. 50-260

Dear Mr. Shea:

This refers to the meeting conducted on July 24, 2013, in Atlanta, GA. The purpose of this meeting, was to allow representatives of Tennessee Valley Authority (TVA), the licensee for Browns Ferry Nuclear Plant, to meet with U. S. Nuclear Regulatory Commission (NRC) personnel to discuss the safety significance of one preliminary Greater Than Green finding associated with one Apparent Violation that was documented in NRC Inspection Report 05000260/2013012 (ML13162A780). This finding involved the failure to properly implement procedure 2-OI-99, Reactor Protection System. Specifically, during restoration of 2B Reactor Protection System (RPS) 480 volt power, the RPS motor generator set tie to battery board 2 breaker on the 2A RPS bus motor generator set was incorrectly opened, causing a Unit 2 reactor scram and main steam isolation valves (MSIV) closure. The licensee discussed the immediate corrective actions they implemented and the actions that will be taken based on the licensee's root cause analysis.

A list of attendees and a copy of the presentation handouts are enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 997-4521.

Sincerely,/RA/ Scott Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-260 License Nos.: DPR-52

Enclosures:

1. List of Attendees 2. Presentation Handouts cc w/encls: (See page 3) Should you have any questions concerning this meeting, please contact me at (404) 997-4521.

Sincerely,/RA/ Scott Shaeffer, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-260 License Nos.: DPR-52

Enclosures:

1. List of Attendees 2. Presentation Handouts cc w/encls: (See page 3)

X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_ __________ _ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE JXH /RA/ SMS /RA/ NAME JHeisserer SShaeffer DATE 07/30/2013 07/30/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB6\BROWNS FERRY\MEETINGS\2013 July 24 Reg Conf Meeting Summary.docx cc w/encl: K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution S. M. Bono Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution James E. Emens Manager, Site Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution E. W. Cobey Manager, Corporate Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. A. Hess Program Manager Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 State Health Officer Alabama Dept. of Public Health P.O. Box 303017 Montgomery, AL 36130-3017 Letter to from Scott Shaeffer dated July 30, 2013

SUBJECT: PUBLIC MEETING SUMMARY - REGULATORY CONFERENCE FOR BROWNS FERRY NUCLEAR PLANT, DOCKET NO. 50-260 Distribution w/encl: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrownsFerry Resource Enclosure 1 NRC ATTENDEES F. Brown, Deputy Regional Administrator, RII W. Jones, Deputy Director, DRP, RII C. Evans, Regional Counsel, RII E. Guthrie, Chief, Special Project Browns Ferry, DRP, RII C. Kontz, Senior Project Engineer, Special Project Browns Ferry, DRP, RII S. Sparks, Senior Enforcement Specialist, RII R. Bernhard, Senior Reactor Analyst, DRP, RII J. Heisserer, Senior Project Engineer, Reactor Projects Branch 6, DRP, RII S. Weerakkody, Branch Chief, Division of Risk Assessment, NRR A. Howe, Deputy Director, Division of Inspection and Regional Support (DIRS), NRR (by phone)

R. Franovich, Branch Chief, DIRS, NRR (by phone) S. Vaughn, Reactor Operations Engineer, DIRS, NRR (by phone) L. Casey, Enforcement Specialist, Office of Enforcement (by phone)

D. Dumbacher, Senior Resident Inspector, Browns Ferry (by phone)

L. Pressley, Resident Inspector, Browns Ferry (by phone)

T. Stephen, Resident Inspector, Browns Ferry (by phone)

Enclosure 1 Enclosure 1 BROWNS FERRY REGULATORY CONFERENCE PUBLIC MEETING Atlanta, GA July 24, 2013 Attendees (by phone) Name (Print) ____ Stewart Horn _____________ ____ Gretel Johnston _________________ ____ Garry Morgan __________________ ____ Bradley George ____________ ____ Brian Lawson _______ _________

___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________ ___________________________________

___________________________________ ___________________________________ Title and Organization _BREDL/BEST/MATRR________________ _BREDL/BEST/MATRR________________ _BREDL/BEST/MATRR________________ WPLN _____________________________ Huntsville Times ____________________ ___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ __________________________________ BROWNS FERRY REGULATORY CONFERENCE PUBLIC MEETIN Atlanta, GA Enclosure 1 July 24, 2013

Attendees Name (Print) ____ Preston Swafford _____________ ____ Jim Morris __ _________________ ____ Keith Polson ____________________ ____ Daniel (Lang) Hughes ____________ ____ Michael Oliver _______ _________ ____ Eugene Cobey _________________ ____ Peter Wilson ____________________ ____Kendall Minor __________________ ____Angela Oliver __________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________ ___________________________________

Title and Organization TVA CNO and Executive VP _ ____ Senior Vice President, Nuclear Operations _ Site Vice President, Browns Ferry _____ Operations Manager, Browns Ferry _ Nuclear Licensing Engineer, Browns Ferry Manager, Corporate Nuclear Licensing ___ Site Licensing Oversight Manager ______ _TVA______________________________ _Public ___________________________ ___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

___________________________________

___________________________________ ___________________________________

Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2 Enclosure 2