Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: CNL-16-008, Update on Progress of Facility Modifications for MSIV Leak Rate, CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report, CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports, CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report, ML15282A189, ML16085A301, ML16105A297, ML16105A441, ML16168A026, ML16176A316, ML16189A343, ML17062A390, ML17062A403, ML17181A450
|
MONTHYEARML15282A1892015-08-31031 August 2015 ANP-3372NP, Revision 1, Browns Ferry Unit 3 Cycle 19 EPU (120% OLTP) LAR Reference Fuel Cycle Design Project stage: Other ML15282A2252015-08-31031 August 2015 ANP-3409NP, Revision 2, Fuel-Related Emergent Regulatory Issues Project stage: Request ML15282A1822015-08-31031 August 2015 ANP-3403NP, Revision 2, Fuel Uprate Safety Analysis Report for Browns Ferry Units 1, 2, and 3, Attachment 9 Project stage: Request ML15282A1932015-08-31031 August 2015 ANP-3385NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2, and 3 Extended Power Uprate (EPU) ATRIUM-10 Fuel Assemblies, Licensing Report Project stage: Request ML15282A2362015-08-31031 August 2015 NEDO-33824, Revision 0, Engineering Report, Browns Ferry Replacement Steam Dryer Stress Analysis Project stage: Request ML15282A1902015-08-31031 August 2015 ANP-3404NP, Revision 2, Browns Ferry Unit 3 Cycle 19 Representative Reload Analysis at Extended Power Uprate Project stage: Request ML15282A2232015-08-31031 August 2015 ANP-2860NP Revision 2, Supplement 2, Browns Ferry Unit 1 - Summary of Responses to Request for Additional Information, Extension for Use of Atrium 10XM Fuel for Extended Power Uprate Project stage: Supplement ML15282A1882015-08-31031 August 2015 ANP-3342NP, Revision 1, Browns Ferry EPU (120% OLTP) Equilibrium Fuel Cycle Design Project stage: Request ML15282A1872015-08-31031 August 2015 ANP-3384NP, Revision 3, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for ATRIUM-10 Fuel (Epu) Project stage: Request ML15282A1852015-08-31031 August 2015 ANP-3378NP, Browns Ferry Units 1, 2 and 3, LOCA-ECCS Analysis MAPLHGR Limits for Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1922015-08-31031 August 2015 ANP-3386NP, Revision 1, Mechanical Design Report for Browns Ferry Units 1, 2 and 3 Extended Power Uprate (EPU) Atrium 10XM Fuel Assemblies, Licensing Report Project stage: Request ML15282A1842015-08-31031 August 2015 ANP-3377NP, Browns Ferry Units 1, 2 and 3 LOCA Break Spectrum Analysis Atrium 10XM Fuel (Epu) Project stage: Request ML15282A1522015-09-21021 September 2015 Submits Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate Project stage: Request ML15282A2402015-09-21021 September 2015 Startup Test Plan Project stage: Request ML15282A2222015-09-21021 September 2015 Cycle 19 MCPR Safety Limit Analysis with SAFLIM3D Methodology Project stage: Request ML15282A2412015-09-21021 September 2015 List and Status of Plant Modifications Project stage: Request ML15282A1812015-09-21021 September 2015 Non-Proprietary - Safety Analysis Report for Browns Ferry, Units 1, 2 and 3, Extended Power Uprate, Attachment 7 Project stage: Request ML15282A2352015-09-21021 September 2015 RHR Heat Exchange K-values Utilities in EPU Containment Analyses Project stage: Request 05000259/LER-2015-002, Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time2015-09-21021 September 2015 Regarding High Pressure Coolant Injection System Inoperable Due to Slow Containment Isolation Valve Closing Time Project stage: Request CNL-15-249, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information2015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 1, Spent Fuel Pool Criticality Safety Analysis Information Project stage: Supplement CNL-15-250, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 72015-12-15015 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 2, MICROBURN-B2 Information, Including Enclosures 2, 4, 6, and 7 Project stage: Supplement CNL-15-261, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information2015-12-18018 December 2015 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 3, Interconnection System Impact Study Information Project stage: Supplement ML16032A0442016-02-0101 February 2016 Fws to NRC, Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location for Browns Ferry EPU Project stage: Request ML16041A3072016-02-18018 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16040A2322016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16041A0222016-02-25025 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16049A4632016-02-29029 February 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-045, Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information2016-03-0909 March 2016 Proposed Technical Specifications (Ts)Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 6, Response to Request for Additional Information Project stage: Supplement ML16062A0722016-03-15015 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-048, Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU)2016-03-24024 March 2016 Responses to Requests for Additional Information, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) Project stage: Response to RAI ML16084A3202016-03-25025 March 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI CNL-16-055, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information2016-03-28028 March 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 8, Response to Request for Additional Information Project stage: Supplement ML16089A1372016-03-29029 March 2016 NRR E-mail Capture - Correction to Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16064A2862016-04-0404 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16091A0712016-04-0707 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A3012016-04-11011 April 2016 Regulatory Audit Plans for April 19 - 21, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-069, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information2016-04-14014 April 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 11, Responses to Requests for Additional Information Project stage: Supplement ML16102A3392016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16085A0792016-04-14014 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16104A2452016-04-20020 April 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16105A2972016-04-21021 April 2016 Regulatory Audit Plan for May 3-4, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other ML16105A4412016-04-27027 April 2016 Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request Project stage: Other CNL-16-077, For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information2016-04-27027 April 2016 For Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Update (EPU) - Supplement 14, Response to Request for Additional Information Project stage: Supplement ML16119A4402016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate Project stage: RAI ML16119A1332016-05-0606 May 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) Project stage: RAI CNL-16-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information2016-05-11011 May 2016 Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 15, Responses to Requests for Additional Information Project stage: Supplement ML16120A0722016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124B1062016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML16123A3352016-05-16016 May 2016 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2016-03-29
[Table View] |
Text
LICENSEE:
FACILITY:
SUBJECT:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 6, 2017 Tennessee Valley Authority Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUMMARY
OF FEBRUARY 15, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY ON UPDATES TO THE TRANSMISSION SYSTEM REGARDING EXTENDED POWER UPRATE FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 (CAC NOS. MF6741, MF6742, AND MF6743)
On February 15, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for TVA to present to the NRC staff changes to the previously proposed modifications associated with the transmission system and impacts of those changes on the safety and environmental assessments regarding the extended power uprate (EPU) license amendment request (LAR) for Browns Ferry Nuclear Plant (Browns Ferry)
Units 1, 2, and 3. The meeting notice and agenda, dated January 13, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML17034A472. A list of attendees is provided as Enclosure 1.
The licensee submitted the EPU LAR on September 21, 2015 (ADAMS Accession No. ML15282A152), with numerous supplements. Upon approval of the EPU LAR, the licensee plans to implement the EPU in the spring of 2018 for Unit 3, the fall of 2018 for Unit 1, and the spring of 2019 for Unit 2. The proposed EPU amendment would increase the authorized maximum steady-state reactor core power level for each unit from 3,458 megawatts thermal (MWt) to 3,952 MWt.
The licensee's presentation document, which was provided prior to the meeting and attached to the meeting notice, is available under ADAMS Accession No. ML17034A332. The licensee's presentation began with providing background information regarding the transmission system.
TVA stated that an Interconnection System Impact Study (SIS) was performed for Browns Ferry, Units 1, 2, and 3, at EPU conditions. The SIS determined that main generator stability issues exist for a three-phase fault on one of several transmission lines coincident with certain transmission lines already out of service (N-1-1 event). TVA stated that the main generators would become unstable during the N-1-1 event because the existing main generator's excitation systems could not raise the field voltage fast enough and high enough to prevent the instability.
To mitigate the transient stability issues during an event, TVA had planned to install a new shunt-fed, static excitation system on each of the three Browns Ferry units. However, the licensee identified a legacy error in the generator field parameter values that were provided after stator rewind in 2003, and that were used in the development of the Interconnection SIS. The licensee found that, at EPU power levels, more extensive compensatory measures would be needed for the main generators to remain stable and that the previous stability mitigation plan, addressed in the licensee's Supplement 18, dated May 27, 2016 (ADAMS Accession No. ML16197A563), was no longer viable. The licensee further discussed the differences between the previous mitigation plan and the updated plan. TVA stated that the updated stability mitigation plan for the N-1-1 event would include (1) modifying the existing excitation system from bus-fed type to self-excited type (instead of the previously proposed static excitation system) on each Browns Ferry unit, and (2) installing a static volt-ampere reactive compensator at the existing Limestone Substation near Browns Ferry. The NRC staff asked whether TVA plans to perform any testing in the future when the modifications are done. TVA responded that there is a requirement by the Federal Energy Regulatory Commission (FERC) to do testing and that the FERG-required testing would be performed in several years.
The licensee, in its letter dated January 20, 2017 (ADAMS Accession No. ML17023A200),
submitted Supplement 36 to the EPU LAR. Enclosures to Supplement 36 provided revisions to the Interconnection SIS, Transmission Stability Study, TVA responses to the NRC staff's request for additional information, probabilistic risk assessment, Power Uprate Safety Analysis Report Section 2.5.1.2.2, and list and status of modifications. The licensee stated that the modifications related to the main generator's excitation systems will be implemented at Browns Ferry during the fall of 2020 at Unit 1, during the spring of 2021 at Unit 2, and during the spring of 2020 at Unit 3. The NRC staff noted that the updated system modifications will be implemented sooner than previously planned modifications. The licensee added that, from the time the EPU is implemented until modifications are complete, TVA will develop and follow operating guidelines and procedures for derating the plant, if needed.
The NRC staff asked clarifying questions throughout the presentation. Specifically, the NRC staff asked the licensee to provide the values (before the error and after correcting the error) of the generator field parameter affected by the identified legacy error. The licensee provided the requested information by an e-mail where the licensee explained that the open circuit transient time constant value was the generator field parameter affected by the identified legacy error. A value of 7.283 seconds was reported after the 2003 Stator rewind versus a 2016 corrected value of 9.273 seconds. Both of these numbers are at the 1,330-million volt-ampere rating.
Additionally, during the presentation, the NRC staff asked TVA to provide a block diagram of the existing generator exciter system and the proposed modified generator exciter system. The licensee, in another e-mail, provided the requested diagrams as shown in Enclosure 2 of this meeting summary.
The licensee continued its presentation (starting from slide 14) by discussing environmental aspects of the transmission system update. TVA explained that instead of installing capacitor banks at the Wilson Substation in Wilson County, Tennessee, TVA would install a static volt-ampere reactive compensator at the existing Limestone Substation in Limestone County, Alabama, near Browns Ferry. TVA submitted LAR Supplement 37 on February 3, 2017 (ADAMS Accession No. ML17034A562), which included updated TVA responses to the staff's request for additional information associated with environmental reviews, Revision 2 of the supplemental environmental report, and updated draft environmental assessment and finding of no significant impact. TVA did not identify any significant environmental impact from the updated transmission system.
There was one member of the public in attendance by telephone. Public Meeting Feedback forms were not received. At the end of the meeting, following questions and answers between the NRC staff and TVA representatives, the member of the public stated his concerns about the possibility of flooding of the Tennessee River and malfunction of the nearby dams, and the impact on operations of the Browns Ferry units. The NRC staff responded that the issues regarding the flooding and functionality of dams were not relevant to the subject of this meeting.
However, the NRC staff informed the member of the public that the NRC staff in the Office of Nuclear Reactor Regulation, Division of Japan Lessons Learned (JLD), has been evaluating flooding hazards for all the nuclear power plants and that the majority of the JLD reports are publicly available in ADAMS.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296
Enclosures:
1. List of Attendees
- 2. Charts - Existing Voltage Regulation and New Voltage Regulation cc w/enclosures: Distribution via Listserv
~~~t1 b
~~ ~(_
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
LIST OF ATTENDEES FEBRUARY 15. 2017. MEETING WITH TENNESSEE VALLEY AUTHORITY ON UPDATES TO THE TRANSMISSION SYSTEM REGARDING EXTENDED POWER UPRATE FOR BROWNS FERRY NUCLEAR PLANT. UNITS 1. 2. AND 3 Name Oraanization Farideh Saba U.S. Nuclear Reaulatorv Commission (NRC)
Benjamin Beasley NRC Russell Haskell NRC Vijay Goel NRC Adakou Foli NRC Todd Hilsmeier NRC Jeffrey Rikhoff NRC Kevin Folk NRC William Rautzen NRC Ami Patel NRC Briana Granae*
NRC Gerard Dovie Tennessee Vallev Authority <TVA)
Pete Donahue TVA Dan Green TVA Ashley Michael TVA Joe Bashore TVA William Baker TVA Gordon Williams TVA Marvin Lewis*
Public
Transformer 480/135 Vac uuuu nnnn AC Gen Field
(
Breaker I
( A.I.JC DC t
Exciter Collector Rings Existing Voltage Regulation Voltage I Current Input Rectifier Assembly t
Generator Collector Rings Generator 3<1> Output Turbine 112
AC Gen Ftelct ere DC Excit1 CoUectorR i. New Voltage Regulation
\\b1tag~ I Current Input Roct1f1or Assembty Goncrato l Output TUrbine
SUBJECT:
SUMMARY
OF FEBRUARY 15, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY ON UPDATES TO THE TRANSMISSION SYSTEM REGARDING EXTENDED POWER UPRATE FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 (CAC NOS. MF6741, MF6742, AND MF6743) DATED APRIL 6, 2017 DISTRIBUTION:
Public LPL2-2 Reading File RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLpl2-2 Resource RHaskell, NRR THilsmeier, NRR RidsNrrDra Resource RidsNrrDe Resource ADAMS A ccess1on N ML17061A672 o.:
OFFICE NRR/DORL/LPL2-2/PM NAME FSaba DATE 04/06/2017 OFFICE NRR/DE/EEEB/BC*
NAME JZimmerman (RMathew for)
DATE 03/29/2017 BGrange, NRR APatel, NRR WRautzen, NRR JBowen, OEDO TClark, OEDO TWertz, NRR VGoel, NRR KFolk, NRR JRikhoff, NRR AFoli, NRR RidsNrrDorl Resource
- b 1y e-mar NRR/DORL/LPL2-2/LA NRR/DLR/RERP/BC(A)*
BClayton (LRonewicz for)
JRikhoff 04/06/2017 04/03/2017 NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM BBeasley FSaba 04/06/2017 04/06/2017 OFFICIAL RECORD COPY