Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus
ML19120A288
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/06/2019
From: Farideh Saba
Plant Licensing Branch II
To:
Tennessee Valley Authority
Saba F, NRR/ DORL/LPL2-2, 301-415-1447
References
EPID L-2018-LLA-0048
Download: ML19120A288 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 6, 2019 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3

SUBJECT:

SUMMARY

OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)

By letter dated February 23, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML180798140), Tennessee Valley Authority (TVA) submitted licensea amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (Browns Ferry).

The proposed amendment would allow operation in the expanded Maximum Extended Load Line Limit Analysis Plus (MELLLA+) operating domain. The purpose of the meeting was for TVA to present to the U.S. Nuclear Regulatory Commission (NRC) staff its submitted LAR to implement MELLLA+. The meeting notice and agenda dated March 7, 2019, are available in ADAMS under Accession No. ML19067A026. A list of attendees is enclosed .

On March 19, 2019, a Category 1 closed meeting was held between the NRC staff, representatives of TVA, and TVA's contractor (General Electric Hitachi) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The discussion was focused on the differences between the NRC Office of Research confirmatory calculation limiting results and the limiting results provided by TVA in its LAR. This meeting was closed to the public due to discussion of proprietary information.

During the meeting, TVA representatives discussed the Anticipated Transient Without Scram with Instability (ATWS-1) analyses performed to support the Browns Ferry MELLLA+ LAR. By letter dated April 24, 2019 (ADAMS Accession No. ML19115A099), TVA submitted Supplement 9 to the LAR, which provided additional information regarding ATWS-1 analyses.

No regulatory decisions were made at the meeting.

Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.

Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

List of Attendees cc: Listserv

LIST OF ATTENDEES MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 REGARDING MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS LICENSE AMENDMENT REQUEST Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC)

Joshua Borromeo NRC Undine Shoop NRC Chris Hoxie NRC Peter Yarsky NRC Andrew Bielen NRC Nathanael Hudson NRC Ian Porter NRC Aaron Wysocki NRC Consultant Pete Donahue TVA Dan Green Tennessee Valley Authority (TVA)

Barry Myers TVA Michael Dick TVA Larry King . General Electric Hitachi (GEH)

Mike Cook GEH Enclosure

SUBJECT:

SUMMARY

OF MARCH 19, 2019, CLOSED MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A LICENSE AMENDMENT REQUEST TO IMPLEMENT MAXIMUM EXTENDED LOAD LINE LIMIT ANALYSIS PLUS FOR BROWNS FERRY NUCLEAR PLANT (EPID L-2018-LLA-0048)

DATED MAY 6 , 2019 DISTRIBUTION:

PUBLIC PM File Copy RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDss Resource RidsNrrDorlLpl2-2 Resource RidsNrrDorl Resource RidsNrrDssSnpb Resource RidsNrrDssStsb Resource RidsNrrDra Resource RidsNrrDe Resource RidsNrrDssSrxb Resource MMcCoppin , OEDO JJohnston, NRR JBorromeo, NRR AHon, NRR DWoodyatt, NRR JQuichocho, OEDO PYarsky, RES CHoxie, RES NHudson, RES

!Porter, RES ABielen, RES MPanicker, NRR ADAMS A ccess1on N o.: ML19120A288 *b1y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA DSS/SRXB/BC(A)* DORL/LPL2-2/BC DORL/LPL2-2/PM NAME FSaba LRonewicz JWhitman UShoop FSaba DATE 05/16/2019 05/15/2019 05/08/2019 06/05/2019 06/06/2019 OFFICIAL RECORD COPY