ML19120A369

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296
ML19120A369
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/30/2019
From: Son Ninh
NRC/RGN-II/DRP/RPB5
To: Omar Lopez-Santiago
NRC/RGN-II/DRP/RPB5
Geanette D
References
Download: ML19120A369 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 30, 2019 MEMORANDUM TO: Omar R. Lopez-Santiago, Chief Rector Projects Branch 5 Division of Reactor Projects FROM: Son Q. Ninh, Senior Project Engineer /RA/

Reactor Projects Branch 5 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- BROWNS FERRY NUCLEAR PLANT, DOCKET NO. 50-259, 50-260, AND 50-296 On April 23, 2019, the Nuclear Regulatory Commission staff met with members of the public concerning the annual assessment of Browns Ferry Nuclear Plant, Units 1, 2, & 3. The meeting was held at the Athens City Hall Council Chambers in Athens, Alabama. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of the Browns Ferry Nuclear Plant with the public for the period of January 1, 2018

- December 31, 2018. Enclosed are a list of attendees and the presentation slides.

Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68

Enclosures:

1. List of NRC Attendees
2. Sign In Sheet
3. Presentation Slides CONTACT: Son Ninh, RII/DRP 404-997-4532

ML19120A369 OFFICE RII:DRP NAME SNinh DATE 4/30/2019 NRC Attendees Omar Lopez-Santiago, Chief, Reactor Projects Branch 5, Division of Reactor Projects (DRP),

Region II (RII)

Son Ninh, Senior Project Engineer, DRP, RII Thomas Stephen, Browns Ferry Senior Resident Inspector, DRP, RII Matthew Kirk, Browns Ferry Resident Inspector, DRP, RII Nicholas Hobbs, Browns Ferry Resident Inspector, DRP, RII Joey Ledford, RII Public Affairs Officer Charlotte White, Browns Ferry Administrative Assistant, DRP, RII Enclosure 1 2

3 4

5 6