ML18242A488
ML18242A488 | |
Person / Time | |
---|---|
Site: | Browns Ferry ![]() |
Issue date: | 09/24/2018 |
From: | Farideh Saba Plant Licensing Branch II |
To: | Tennessee Valley Authority |
Saba F DORL/LPL2-2 301-415-1447 | |
References | |
EPID L-2018-LRM-0053 | |
Download: ML18242A488 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 September 24, 2018 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF AUGUST 28, 2018, PRE-APPLICATION CONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY TO DISCUSS PROPOSED CHANGES TO MODIFICATIONS ASSOCIATED WITH APPROVED NFPA 805 FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0053)
On August 28, 2018, a Category 1 public conference call was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was for TVA to present its planned license amendment request (LAR) regarding changes to its fire protection program at Browns Ferry Nuclear Plant, Units 1, 2, and 3. The meeting notice and agenda, dated August 17, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18229A019. A list of attendees is enclosed.
The licensee's presentation slides (ADAMS Accession No. ML18239A252) were provided prior to the call and attached to the meeting notice. During the meeting, the licensee outlined the following proposed changes to the Table S-2, "Plant modifications Committed," in the NRC-approved license conditions associated with National Fire Protection Association (NFPA)
Standard NFPA 805:
- Extend due dates for Modifications 102 and 106 by 4 months and 6 months, respectively.
- Eliminate Modification 85 - CO2 Pneumatic Alarm and Time Delay from LAR Table S-2 and revise Table B-1, "Transition of Fundamental Fire Protection Program & Design Elements," in the amendments, as appropriate.
- Revise the Renewed Facility Operating Licenses associated with the above changes.
The NRC staff asked clarifying questions and provided observations on key issues. The staff noticed that TVA plans to request to extend the due date for completion of Modifications 102 and 106 to six months following the end of the Unit 2 outage. The staff asked TVA to clarify that the proposed completion dates for these modifications will not change, if the end of the Unit 2 outage is delayed. TVA confirmed that August 14, 2019, and October 14, 2019, are the proposed completion dates for Modifications 102 and 106, respectively. Specific to Modification 85, the NRC staff also emphasized that detailed information should be provided in the proposed LAR to explain difficulties associated with developing a design compatible with the current design and justification for deleting this modification.
No regulatory decisions were made and no actions were taken during the conference call. One member of the public participated in the conference call but did not have any questions. No Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES AUGUST 28, 2018, PRE-APPLICATION CONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DISCUSS PROPOSED CHANGES TO MODIFICATIONS ASSOCIATED WITH APPROVED NFPA 805 Name Organization Farideh Saba U.S. Nuclear Regulatory Commission (NRC)
Jav Robinson NRC Charles Moulton NRC Ed Schrull Tennessee Valley Authority (TVA)
Gordon Williams TVA Don Lewis TVA Fred Ross TVA J. D. Wolcott TVA Shannon Loworn TVA Viken Khatchadourian Member of Public Enclosure
SUBJECT:
SUMMARY
OF AUGUST 28, 2018, PRE-APPLICATION CONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY TO DISCUSS PROPOSED CHANGES TO MODIFICATIONS ASSOCIATED WITH APPROVED NFPA 805 FOR BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0053) DATED SEPTEMBER 24, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsNrrLABClayton Resource RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMBrownsFerry Resource RidsNrrDra Resource RidsNrrDorlLpl2-2 Resource RidsNrrDorl Resource JRobinson, NRR CMoulton, NRR TWertz, NRR LBurkhart, OEDO JBowen, OEDO RidsNrrDraApla Resource ADAMS A ccess1on No.: ML18242A488 *b>Y e-ma1*1 OFFICE D0RL/LPL2-2/PM D0RL/LPL2-2/LA DRA/APLA/BC* D0RL/LPL2-2/BC(A) D0RL/LPL2-2/PM NAME FSaba LRonewicz GCasto BVenkataraman FSaba DATE 09/10/2018 09/10/2018 09/10/2018 09/24/2018 09/24/2018 OFFICIAL RECORD COPY