Responds to NRC 801015 Ltr Re Violations Noted in IE Insp Repts 50-254/80-19 & 50-265/80-21.Corrective Actions:Reactor Core Isolation Cooling Controller Returned to Normal Operating Configuration & Investigation Conducted
ML19345D302
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/06/1980
From: Abel J
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19345D300 List:
References
NUDOCS 8012120425
Download: ML19345D302 (2)


Text

- .

{}

s Canmonwealth Edison

  • one First Natee ai Pfa:a. Chicago. Ilhnoes Accress Reply to: Post OBce Box 767

, Chicago. !!hnois 60690 November 6, 1980 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Quad Cities Station Unit 1 Response to IE Inspection Report Nos. 50-254/80-19 and 50-265/80-21 NRC Docket No. 50-254 r Reference (a): R. F. Heishman letter to C. Reed dated October 15, 1980

Dear Mr. Keppler:

Reference (a) transmitted the results of an inspection conducted by Messrs. N. J. Chrissotimos and S. G. Dupont on July 21 through August 29, 1980 of activities at Quad Cities Station.

Appendix A to Reference (a) identified two apparent items of noncompliance requiring additional response.

l Attachment A to this letter provides the Commonwealth

Edison Co. response to noncompliance items 1 ano 2 identified in i RL ferp ace (a) . As indicated in this response, we believe that full compliance has been achieved at this time.

! Please address any questions concer'ing this matter to this l office.

l Very truly yours, J. S. Abel Director of Nuclear Licensing Attachment cc: RIII Inspector, Quad Cities 7966A l

to12120 WS NOV 10 W

hRC Dock 2t No. 50-254 COMMONWEALTH EDISON COMPANY ATTACHMENT A NOTICE OF V OLATION The items of non-coepilance identified in Appendix A to the NRC letter dated October 15, 1980, are responded to in the following paragraphs.

1. Unit 1 Technical Specifications, Section 6.2.A.I. requires that opera-tion of the reactor and other systems and components involving nuclear safety of the facility be performed in accordance with detailed written procedures and applicable checkoff lists.

Contrary to the above, on August 17, 1980, while performing surveli-lance Q15 130-2 "RCit Pump Operability Test" :he operator failed to return the RCIC to its normal operating conf sguration as stated in Step 8.

2. Unit i Technical Specifications, Sect.on 6.2.A.I. requires that opera-tion cf the reactor and other systems and components involving nuclear safety of the facility be performed in accordance with detailed written procedures and applicable checkoff lists.

Contrary to the above, during the period of August 17, to August 18, 1980, the RCIC flow controller was not in its normal operating con-figuration as stated in Step C 5 of Procedure QOS 005-2 " Normal Control Room Inspection and Shif t Turnover Panel Checks."

Corrective Actions Taken and Results Achieved:

Upon identification of this event, the RCIC controller was returned to its normal operating configuration. An on-site investigation was conducted by the Station to review the situation with the Individuals involved. A dis-cussion was held with all of the NS0s to re-emphasize the need to adhere to Station procedures. The Shif t Technical Advisors are accompanying the NS0s during their shif t turnover panel checks until improvement is demonstrated.

Corrective Actions To Be Taken To Avoid Further Non-Como11ance:

l l .

A revision to Station procedure QOS 005-51, " Operations Department Weekly Summary of Daily Surveillance Reading Sheet" is in progress which will require the Unit Operator to check the status of the RCIC controller once per shift to verify that it is in the AUTO mode. This revision should be laplemented by December 1,1980.

Date When Full Compliance Vill Be Achieved:

Full compliance has been achieved at this time.