Revised Monthly Operating Status Rept for April 1994 for Re Ginna Nuclear Power Plant
ML17263A692
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1994
From: Ploof R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17263A691 List:
References
NUDOCS 9406200135
Download: ML17263A692 (11)


Text

OPERATING DATA REPORT DOCKET NO.50-244 DATE: June 8.1994 COMPLETED BY: Ronald D.Ploof TELEPHON (315)524-4446 Ext.67 OPERATING STATUS 1.Unit N R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period April, 1994 3.Licensed Thermal Power (MWt): '520 4.Nameplate Rating (Gross MWo): 490 5.Design Bectric Rating (Net MWo): 470 6.Maximum Dependable Capacity (Gr 490 7.Maximum Dependable Capacity (No 470 8.If Changes Occur in Capacity Rating (Items Number 3 Through 7)Since Lest Report, Givo Reason: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If Any: This Month Yr.-to.Date Cumulative"'1.Hours in Reported Period 12.Number of hours Reactor Was Critical 13.Roactor Reserve Shutdown Hours 14.Hours Generator On-lino 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23 Unit Forced Outage Rate (%)719.0 301.2 0.0 247.4 0.0 283107.0 94581.0 89103.0 34.4 34.4 26.4 26.4 15.2 2879.0 1800.5 0.0 1746.4 0.0 2486791.0 844651.0 801537.0 60.7 60.7 59.2 59.2 2.5 214127.0 170326.9 1688.0" 167498.4 85'37442804.0 78528010.0 74536910.0 78.2 78.2 75.2 75.2 5.6 24.Shutdowns Scheduled Over Next 6 Months (Typo, Date and Duration of Each): 25.If Shutdown At End of Report Period, Estimate Date of Startup: 26.Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION~CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975'+CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 940b200155 9'40b08 PDR ADQCK 05000244 PDR

/,~k$4 f DOCKET NO.SO-244 UIIIT IUUTOOWN ENO POWE~UEOUOTIOIII COhtPLETED ltY 1ELEPHONE (315)524-4446 ext.673 Ho.Date 0 0 E 0 0 X: Q~C 0 4 4~o8 ocu 0 004 4 I/7 C 0 Cl Licensee Event Report ll E~4 4 4 0 EA C 4 Ml C 0 0 l7 0 V Cause gL Corrective Action to Prevent Recurrence 94-0 94-0 4/26/94 F 15.6 3/4/94 S 1088;3 Annual Refueling Steam leak on HP Turbine instrument fitting, longer fitting installed.

94-0 4/27/94 F 11.5 94-008 JB LCV Main feedwater regulating valve failed to move.Replaced positioner style.F: Forced St Scheduled gatv.44$4949 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)lH)ther (Explain)Method: l-hlanua l 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Fvcnt Rcpo'rt (LER)File (NURFG-Oi('i)Fxhibit I-Same Source ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM t t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9406200143 DOC.DATE: 94/06/08 NOTARIZED:

NO DOCKET5 FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION PLOOF,R.D.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1994 for RGE.W/940608 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR J ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244/RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN1 EXTERNAL EGGG BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A NRFgDORS/OEAB

~REG'ILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D S NOTE TO ALL"RIDS" RECIPIENTS:

A D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 r ZtZrZn t ZinZZZ I ZX e(ZXZZ ZZ,:::: ROCHESTER GASANDELECTRICCORPORATION a 89EASTAVENUEi ROCHESTERi N.Y.14649<001 JOSEPH A.WIDAY Rant Managor Sinna Nucbar Plant TELEPHONE AttEACODE Tl6 546-2700 GINNA STATION June 8, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1994 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1994.Very truly yours, Q,U os h A.Wida Plant Manager JAW: tjn Attachments c: Mr.Thomas T.Martin NRC (1)/rg'tt40b200i43

'Tt40b08 PDR ADOCK 05000244 R PDR OPERATING DATA REPORT DOCKET NO.50-244 DATE: June 8, 1994 COMPLETED BY: Ronald D.Plo f TELEPHON (315)524-4446 Ext.67 OPERATING ST US 1.Unit N R.E.GINNA NUCLEAR POWER PLANT Notes: 2.Reporting Period May.1994 3.Ucensed Thermal Power (MWt): 1520 4.Nameplate Rating (Gross MWe): 490 5.Design Electric Rating (Net MWe): 470 6.Maximum Dependable Capacity (Gro 490 7.Maximum Dependablo Capacity (Net 470 8.If Changes Occur in Capacity Rating (Items Number 3 Through 7)Since Last Report, Givo Reason: 9.Power Lovel to Which Restricted, If Any (Net MWe): 10.Reason For Restrictions, If Any: This Month Yr:to-Date Cumulative" 11.Hours in Reported Period 12.Number of hours Reactor Was Cdtical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On.line 15.Unit Reservo Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Enorgy Generated (MWH)19.Unit Service Factor (%)20.Unit Availability Factor (%)21.Unit Capacity Factor (using MDC Net)(%)22.Unit Capacity Factor (using DER Net)(%)23 Unit Forcod Outage Rate (%)744.0 708.8 0.0 704.0 0.0 1019528 346654 329590 94.6 94.6 94.3 94.3 5.4 3623.0 2509.3 0.0 2450.4 0.0 3506319 1191305 1131127 67.6 67.6 66.4 66.4 3.3 214871.0 171035.8 1688.0'68202.4 85~238462332 78874664 74866500 78.3 78.3 75.3 75.3 5.6 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): 25.If Shutdown At End of Report Period, Estimato Dato of Startup: 26.Units in Tost Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'UMULATIVE TOTAL COMMENCING JANUARY 1, 1975'CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: June 8 1994 COMPLETED BY: Ronald Ploof TELEPHONE:

315 524-4446 Ext.673 MONTH Ma 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)480 17.480 2.480 18.480 ,3 4.411-8.5 19.20.480 480 5.38.5 21.480 6.322.5 22.480 7.481 23.480 8.480 24.480 9~480 25.480 10.480 26.480 480 27.480 12.480 28.480 13.480 29.479 14.480 30.480 15.480 31.479 16.480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.Compute to the nearest whole megawatt.

~t'I DOCKET NO.~O-244 IJNI1 NAMI R E PINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DA1 I'.(:OMP LI'.1'I-:D I3Y 1'ELEPIIONI'.

3l5 524-4446 x 673 No.Date 4 I c 0 4 4 4 P 0 CV c 0 VI 0 4 ol~0 c v 0 4>tx!can c 0 0 licensee Event Report JJ Ew 4 4 Itl 0 cn~c 4 IA 0 c 0 0 0 Cou se gl Corre cti ve Action to Prevent Recurrence 94-0 5/3/94 F 40 Flexable CCW cooling line to RCP developed leak as a result of inproper installation.

Fc Forced Sc Scheduled)tv.44$4$4$Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 hlethod: I-hfanual 2-Manual Scram.3-Automatic Scram.4-Ocher (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Evcnc Rcporc (LER)File (NIJRFG-OI6I)Exhibit I-Same Source NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E.Ginna Nuclear Power Plant DATE: June 8 1994 COMPLETED BY: Ronald Ploof TELEPHONE:

315 524-4446 Ext.673 MONTH Ma 1994 During the month of May the average power level was 97.on May 3 to frazzil ice buildup on intake screens and heaters.Returned to full power on January 21 and remained there at the end of report period.The unit was taken off line to repair a leak in the CCW cooling line to the"A" RCP.The unit was returned to full power on May 6.

A'J P'