Revised Monthly Operating Status Rept for April 1994 for Re Ginna Nuclear Power Plant
ML17263A692
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/30/1994
From: Ploof R
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17263A691 List:
References
NUDOCS 9406200135
Download: ML17263A692 (11)


Text

OPERATING DATA REPORT DOCKET NO. 50-244 DATE: June 8. 1994 COMPLETED BY:

Ronald D. Ploof TELEPHON (315) 524-4446 Ext.67 OPERATING STATUS

1. Unit N R.E. GINNA NUCLEAR POWER PLANT
2. Reporting Period
3. Licensed Thermal Power (MWt): '520 April, 1994
4. Nameplate Rating (Gross MWo): 490
5. Design Bectric Rating (Net MWo): 470
6. Maximum Dependable Capacity (Gr 490
7. Maximum Dependable Capacity (No 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Lest Report, Givo Reason:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If Any:

This Month Yr.-to. Date Cumulative"

'1.

Hours in Reported Period 719.0 2879.0 214127.0

12. Number of hours Reactor Was Critical 301.2 1800.5 170326.9
13. Roactor Reserve Shutdown Hours 0.0 0.0 1688.0 "
14. Hours Generator On-lino 247.4 1746.4 167498.4
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 283107.0 2486791.0 85'37442804.0
17. Gross Electrical Energy Generated (MWH) 94581.0 844651.0 78528010.0
18. Net Electrical Energy Generated (MWH) 89103.0 801537.0 74536910.0
19. Unit Service Factor (%) 34.4 60.7 78.2
20. Unit Availability Factor (%) 34.4 60.7 78.2
21. Unit Capacity Factor (using MDC Net) (%) 26.4 59.2 75.2
22. Unit Capacity Factor (using DER Net) (%) 26.4 59.2 75.2 23 Unit Forced Outage Rate (%) 15.2 2.5 5.6
24. Shutdowns Scheduled Over Next 6 Months (Typo, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

~ CUMULATIVETOTAL COMMENCING JANUARY 1, 1975

'+ CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969 940b200155 9'40b08 PDR ADQCK 05000244 PDR

/

, ~

k

$4 f

DOCKET NO. SO-244 UIIIT IUUTOOWN ENO POWE ~ UEOUOTIOIII COhtPLETED ltY 1ELEPHONE (315) 524-4446 ext. 673

~ocuo8 Licensee C

4 Ml Cause gL Corrective 0 C 0 E~ C Ho. Date 0 0 0

4 004 Event 4 4 4

0 l7 0 0 Action to E

0 X: 4 Report ll 0 Prevent Recurrence Q ~ 4 I/7 C EA V

0 Cl 94-0 3/4/94 S 1088;3 Annual Refueling 94-0 4/26/94 F 15.6 Steam leak on HP Turbine instrument fitting, longer fitting installed.

94-0 4/27/94 F 11.5 94-008 JB LCV Main feedwater regulating valve failed to move. Replaced positioner style.

F: Forced Reason: Method: Exhibit G - Instructions St Scheduled A-Equipment Failure (Explain) l-hlanua l for Preparation of Data 8-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Fvcnt Rcpo'rt (LER) File (NURFG-D-Regulatory Restriction 4-Other (Explain) Oi('i)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) gatv. 44$ 4949 lH)ther (Explain) Fxhibit I - Same Source

t ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM t

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406200143 DOC.DATE: 94/06/08 NOTARIZED: NO DOCKET 5 FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION PLOOF,R.D. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1994 for RGE.W/940608 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

J ENCL J SIZE: D NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 D

INTERNAL: AEOD/DSP/TPAB 1 1 NRFgDORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 ~REG'ILE 01 1 1 D RGN1 1 1 EXTERNAL EGGG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 S

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

r ZtZrZn t ZinZZZ I ZX e(ZXZZ ZZ,::::

ROCHESTER GASANDELECTRICCORPORATION a 89EASTAVENUEi ROCHESTERi N.Y. 14649<001 JOSEPH A. WIDAY TELEPHONE Rant Managor AttEACODE Tl6 546-2700 Sinna Nucbar Plant GINNA STATION June 8, 1994 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May, 1994.

Very truly yours, Q,U os h A. Wida Plant Manager JAW: tjn Attachments c: Mr. Thomas T. Martin NRC (1)

/rg

'tt40b200i43 'Tt40b08 PDR ADOCK 05000244 R PDR

OPERATING DATA REPORT DOCKET NO. 50-244 DATE: June 8, 1994 COMPLETED BY:

Ronald D. Plo f TELEPHON (315) 524-4446 Ext.67 OPERATING ST US

1. Unit N R.E. GINNA NUCLEAR POWER PLANT Notes:
2. Reporting Period May. 1994
3. Ucensed Thermal Power (MWt): 1520
4. Nameplate Rating (Gross MWe): 490
5. Design Electric Rating (Net MWe): 470
6. Maximum Dependable Capacity (Gro 490
7. Maximum Dependablo Capacity (Net 470
8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Givo Reason:
9. Power Lovel to Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If Any:

This Month Yr:to-Date Cumulative"

11. Hours in Reported Period 744.0 3623.0 214871.0
12. Number of hours Reactor Was Cdtical 708.8 2509.3 171035.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 1688.0
14. Hours Generator On. line 704.0 2450.4 '68202.4
15. Unit Reservo Shutdown Hours 0.0 0.0 85~
16. Gross Thermal Energy Generated (MWH) 1019528 3506319 238462332
17. Gross Electrical Energy Generated (MWH) 346654 1191305 78874664
18. Net Electrical Enorgy Generated (MWH) 329590 1131127 74866500
19. Unit Service Factor (%) 94.6 67.6 78.3
20. Unit Availability Factor (%) 94.6 67.6 78.3
21. Unit Capacity Factor (using MDC Net) (%) 94.3 66.4 75.3
22. Unit Capacity Factor (using DER Net) (%) 94.3 66.4 75.3 23 Unit Forcod Outage Rate (%) 5.4 3.3 5.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shutdown At End of Report Period, Estimato Dato of Startup:
26. Units in Tost Status (Prior to Commercial Operation): Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

'UMULATIVETOTAL COMMENCING JANUARY 1, 1975

' CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 8 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH Ma 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 480 17. 480

2. 480 18. 480

,3 411 19. 480

4. -8.5 20. 480
5. 38.5 21. 480
6. 322.5 22. 480
7. 481 23. 480
8. 480 24. 480 9 ~ 480 25. 480
10. 480 26. 480 480 27. 480
12. 480 28. 480
13. 480 29. 479
14. 480 30. 480
15. 480 31. 479
16. 480 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.

~ '

't

'I

DOCKET NO. ~O-244 IJNI1 NAMI R E PINNA NUCLEAR POWER PLANT DA1 I'.

UNIT SHUTDOWN AND POWER REDUCTIONS (:OMP LI'.1'I-:D I3Y 1'ELEPIIONI'. 3l5 524-4446 x 673 c CV 0 ol ~ c4 IA 0 4 c c v licensee Ew c Cou se gl Corre cti ve 4 4 0 0 4 4 0 0 Action to No. Date 4 0 VI 4

> tx!

Event Itl 0 0 P 0 0 Prevent Recurrence I

4 can c Report JJ cn ~

0 0

94-0 5/3/94 F 40 Flexable CCW cooling line to RCP developed leak as a result of inproper installation.

3 Fc Forced Reason: hlethod: Fxhibit G - Instructions Sc Scheduled A-Equipment Failure (Explain) I -hfanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Evcnc Rcporc (LER) File (NIJRFG-D-Regulatory Restriction 4-Ocher (Explain) OI6I)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

)tv. 44$ 4$ 4$ H-Other (Explain) Exhibit I - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: June 8 1994 COMPLETED BY:

Ronald Ploof TELEPHONE: 315 524-4446 Ext. 673 MONTH Ma 1994 During the month of May the average power level was 97. on May 3 to frazzil ice buildup on intake screens and heaters. Returned to full power on January 21 and remained there at the end of report period. The unit was taken off line to repair a leak in the CCW cooling line to the "A" RCP. The unit was returned to full power on May 6.