04/09/2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance ImprovementsML15105A470 |
Person / Time |
---|
Site: |
Fort Calhoun |
---|
Issue date: |
04/15/2015 |
---|
From: |
NRC Region 4 |
---|
To: |
|
---|
Hay M |
References |
---|
Download: ML15105A470 (41) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML17163A0192017-06-0909 June 2017 Post Shutdown Decommissioning Activities Report Public Meeting ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12349A1512012-12-12012 December 2012 Licensee Slides from 12/12/2012 Public Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806703502008-03-0404 March 2008 Meeting Summary for Public Meeting with Omaha Public Power District ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] Category:Meeting Summary
MONTHYEARML24107B1272024-04-22022 April 2024 Ft. Calhoun Meeting Summary of March 27, 2024 Meeting with Omaha Public Power District on Submittal of Phase 1 Final Status Surveys ML19071A0302019-03-13013 March 2019 Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML17167A2622017-06-27027 June 2017 Summary of 5/31/2017 Meeting at Double Tree Hotel, Omaha, Ne, to Discuss and Accept Comments Regarding the Fort Calhoun Station Post-Shutdown Decommissioning Activities Report ML16298A2912016-10-27027 October 2016 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss Decommissioning Licensing Actions for Fort Calhoun Station, Unit No. 1 ML16259A1132016-09-20020 September 2016 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 ML16036A3502016-02-23023 February 2016 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 ML15114A3782015-05-0707 May 2015 4/23/15 Summary of Pre-application Meeting with Omaha Public Power District, Proposed License Amendment Requests to (1) Reclassify Systems Based on ANSI 58.14 and (2) Adopt American Concrete Institute Code ACI-318 (1971) for Fort Calhoun St ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14344A0872014-12-19019 December 2014 12/2/2014 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures at Fort Calhoun Station, Unit 1 ML14230A0802014-08-21021 August 2014 Memorandum to File, Verbal Granting of Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML14192A9822014-08-0606 August 2014 Summary of Meeting with Omaha Public Power District to Discuss License Amendment to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13338A2992013-12-0202 December 2013 Summary of Public Meeting in Omaha, Ne ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13134A1862013-06-0303 June 2013 4/22/2013 - Summary of Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Sei ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13114A8812013-04-25025 April 2013 4/22/2013 - Summary of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML12366A0322013-01-25025 January 2013 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12269A2242012-09-25025 September 2012 Meeting Summary of with Omaha Public Power District ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12104A2642012-04-13013 April 2012 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station ML1204004582012-02-0909 February 2012 Summary of Meeting with Omaha Public Power District to Discuss Specifics of the Transition of Fort Calhoun Station to Regulatory Oversight Under the NRC Inspection Manual Chapter 0350 Process ML1122116172011-08-0505 August 2011 7/27/2011- Summary of Public Meeting with Omaha Public Power District to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station ML1116801512011-07-11011 July 2011 5/26/11 Summary of Prelicensing Meeting with Omaha Public Power District to Discuss License Amendment Request to Adopt Risk-Informed National Fire Protection Association Standard NFPA 805 or Fort Calhoun Station, Unit 1 ML1116600272011-06-14014 June 2011 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1111014372011-05-17017 May 2011 Summary of Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1110204072011-05-17017 May 2011 Summary of 03/02/11 Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1102600062011-02-0707 February 2011 Summary of 1/13/2011 Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1021101372010-08-0606 August 2010 Summary of 7/16/2010 Conference Call with Licensee to Discuss the 10/14/2008 Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems ML1019403012010-07-29029 July 2010 6/30/2010 Summary of Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML1006200722010-03-23023 March 2010 Summary of Category 1, Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0931401772009-11-18018 November 2009 Summary of November 5, 2009, Category 1 Meeting with Omaha Public Power District to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 ML0916801382009-06-30030 June 2009 Summary of Conference Call Regarding Issues Related to the Cracking of Mitsubishi Heavy Industries Ltd.-Fabricated Replacement Steam Generators for San Onofre Nuclear Station, Unit 3 ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903706432009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 2024-04-22
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12258A0502012-09-10010 September 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Supplement Materials 1, 2, and 3 for 2.206 - Fort Calhoun Nuclear Power Station ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806004562008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Experiences with Large Component Replacements - Spilker ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 15, 2015 LICENSEE: Omaha Public Power District (OPPD)
FACILITY: Fort Calhoun Station
SUBJECT:
MEETING
SUMMARY
OF APRIL 9, 2015, WITH OMAHA PUBLIC POWER DISTRICT On April 9, 2015, a Category 1 meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Omaha Public Power District (OPPD) at the Thompson Center located at 6705 Dodge Street, Omaha, Nebraska.
The NRC presented the status of oversight activities at Fort Calhoun Station and the basis for the recent NRC decision to transition the station to the normal reactor oversight process.
Omaha Public Power District presented details of their actions for continued sustained performance improvements.
The slide presentations are available electronically from the NRCs Agency wide Documents Access and Management System (ADAMS) and are enclosed in this notice.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at:
http://www.nrc.gov/reading-rm/adams.html.
CONTACT: Michael Hay, RIV/DRP (817) 200-1147 Docket No. 50-285 :
NRC Presentation Slides :
OPPD Presentation Slides
ML15105A470 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: MCH Yes No Non-Publicly Available Sensitive OFFICE RIV/C:DRP/D NAME MCHay:PBH SIGNATURE /RA/
DATE 04/15/15
Memo to Omaha Public Power District from Michael Hay, dated April 15, 2015
SUBJECT:
MEETING
SUMMARY
OF APRIL 9, 2015, WITH OMAHA PUBLIC POWER DISTRICT Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP (Robert.Hagar@nrc.gov)
Project Engineer, DRP (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
RIV Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWebResource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Fort Calhoun Station Public Meeting Nuclear Regulatory Commission April 9, 2015 Omaha, Nebraska Enclosure 1 1
Introductions
- Introduction of NRC personnel 2
Purpose of Meeting
- NRC will present status of regulatory activities associated with the Fort Calhoun Station
- OPPD will present details of Fort Calhoun Station performance improvement initiatives
- Public comments and questions
Opening Remarks Marc Dapas - Regional Administrator 4
Opening Remarks
- Criteria for transitioning Fort Calhoun Station to the normal NRC oversight process
- an effective long-range improvement program
- sufficiently implementing the corrective action program
- demonstrated safe plant operation
- controls in place to address the plant-specific issues that resulted in increased oversight 5
- NRC issued Post-Restart Confirmatory Action Letter December 17, 2013
- Key areas for sustained performance improvement
- Corrective Action Process
- Design Basis Reconstitution 6
NRC Assessment Activities
- Resident Inspectors
- Regional inspections
- Team inspection conducted July 2014
- Assessed Corrective Action Process effectiveness
- Assessed Post-Restart Confirmatory Action Letter items 7
NRC Assessment Results Team Inspection July 2014 Results
- Licensee effectively implemented improvement initiatives in the following key areas:
- Organizational Effectiveness, Safety Culture, Safety Conscience Work Environment
- Performance Improvement and Learning Programs
- Site Operational Focus
- Procedures
- Nuclear Oversight 8
NRC Assessment Results Team Inspection July 2014 Results
- Inconsistent implementation of corrective action program
- Evaluations of degraded and non-conforming conditions
- Resolution of previously issued NRC findings 9
NRC Assessment Results
- Follow-up team inspection conducted January 2015
- Assessed effectiveness of Corrective Action Program improvements
- Assessed Post-Restart Confirmatory Action Letter items 10
NRC Assessment Results Team Inspection January 2015 Results
- NRC noted significant corrective action program improvement since July 2014
- Continued effective implementation of improvement initiatives
- Approximately 150 of 166 post-restart Confirmatory Action Letter items closed 11
NRC Assessment Results Transition Criteria 1 - an effective long-range improvement program
- Post-restart CAL performance improvement initiatives are being effectively implemented (150 of 166 items closed)
- Licensee has established additional long-term actions to sustain performance improvement in the areas of Operational Excellence, Equipment Reliability, and Performance Improvement 12
NRC Assessment Results Transition Criteria 2 - sufficiently implementing the corrective action program
- NRC team inspection performed in January 2015 confirmed OPPD is effectively implementing their corrective action program 13
NRC Assessment Results Transition Criteria 3 - demonstrated safe plant operation
- Control room operators have consistently demonstrated safe operation of the plant and conservative decision making
- Shutdowns and power reductions following identification of degraded mitigation equipment
- Power reduction in response to potential Missouri River flooding conditions
- Automatic shutdown following transformer failure 14
NRC Assessment Results Transition Criteria 4 - controls in place to address the plant-specific issues that resulted in increased oversight
- NRC determined OPPD thoroughly evaluated and adequately corrected all significant safety and security issues prior to restart in December of 2013
- Involved approximately 460 specific inspection activities
- Significant post-restart NRC inspection activities verified effectiveness of licensee actions
- No significant safety or security issues were identified 15
NRC Overall Assessment
- NRC concluded all transition criteria satisfied by OPPD
- Termination of increased NRC oversight
- Transition of station to routine Reactor Oversight Process (ROP) effective April 1, 2015
- Station placed in the Licensee Response Column (Column I) based on no significant safety or security issues currently in effect 16
NRC Oversight Effort
- NRC staff effort at Fort Calhoun Station since entry in IMC 0350 (Dec. 2011)
- Approximately 61,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> total
- 45,000 inspection hours
- 16,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> associated with licensing and assessment activities 17
In Summary
- Licensee has returned to a normal level of NRC oversight
- NRC is implementing normal baseline inspection activities
- NRC will continue to conduct confirmatory action letter follow-up inspections for remainder of open items
- Containment internal structure
- Design basis reconstitution 18
In Summary
- Continued licensee focus on effective implementation of long-term improvement plan 19
OPPD Presentation 20
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov 21
22 Operational Equipment Performance Excellence Reliability Improvement OPPDs Fort Calhoun Station Driving to Sustained Excellence Public meeting with the U.S. Nuclear Regulatory Commission April 9, 2015 1
Enclosure 2
OPPD Vision A fully engaged organization that achieves competitive rates, while maintaining financial stability and high satisfaction.
OPPD Mission Provide affordable, reliable and environmentally sensitive energy services to our customers.
2 2 2
Operational Equipment Performance Excellence Reliability Improvement Demonstrated Safe Plant Operation and Overall Improving Performance Safety and Human Performance Overview Industrial Safety Department-Level Performance Performance 2013 2014 2015 50 41 Untreated 40 11 7 1 Injuries 30 First Aid *Goals 15 2 0 Injuries 20 17 OSHA- 8* 8*
4 1 0 10 Recordable 4
Lost-Time /
4 0 0 0 Restricted 2013 2014 2015 2016 3 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement 52 Weeks of Safety / Human Performance 1 2 3 4 5 6 1/3/2015 1/10/2015 1/17/2015 1/24/2015 1/31/2015 2/7/2015 7 8 9 10 11 12 13 14 2/14/2015 2/21/2015 2/28/2015 3/7/2015 3/14/2015 3/21/2015 3/28/2015 4/4/2015 15 16 17 18 19 20 21 22 4/11/2015 4/18/2015 4/25/2015 5/2/2015 5/9/2015 5/16/2015 5/23/2015 5/30/2015 23 24 25 26 27 28 29 30 6/6/2015 6/13/2015 6/20/2015 6/27/2015 7/4/2015 7/11/2015 7/18/2015 7/25/2015 31 32 33 34 35 36 37 38 8/1/2015 8/8/2015 8/15/2015 8/22/2015 8/29/2015 9/5/2015 9/12/2015 9/19/2015 39 40 41 42 43 44 45 46 9/26/2015 10/3/2015 10/10/2015 10/17/2015 10/24/2015 10/31/2015 11/7/2015 11/14/2015 47 48 49 50 51 52 11/21/2015 11/28/2015 12/5/2015 12/12/2015 12/19/2015 12/26/2015 No Injury or Minor Injury / Dept OSHA Recordable / TISAR /
Near Miss / Report Only HU Event Clock Reset Config Control Event Site Clock Reset 4 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Corrective Action Program Improvement
- Identification The Station Engagement Ratio improved and has been White or Green for the past 12 months The Self-Identification Indicator has gone from 66% (Yellow) in Feb.
2014 to 79% (White) in Jan. 2015
- Analysis The average time to complete a Root Cause Analysis (RCA) has gone from 66 days (Red) in Feb. 2014 to 21 days (Green) in Jan. 2015 This indicator has been Green for more than six months, indicating the station has applied the necessary resources and oversight to the analyses of the most significant CAP issues Investigation rejection rate (RCA/ACA) 3-month average has gone from 40% (Red) in Oct. 2014 to 7% (Green) March 2015
- Closure The number of station open corrective actions has gone from 2,022 in Feb. 2014 to 921 in Jan. 2015 Monthly Closure Quality Rejection Rate Performance Indicator (PI) has gone from 7% (Red) in Oct. 2014 to 4% (Green) in Jan. 2015 (New PI in Oct. 2014) 5 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Demonstrated Safe Plant Operation and Overall Improving Performance Immediate Operability Determinations
- Continuing actions to improve performance Templates developed and being used to enhance the quality of information from the Condition Report (CR) originator and CR screener Accountability measures established for CR originators and CR screeners Operating crews are performing case studies on the quality and amount of information coming in from the field Departments trend Engineering Assurance Group and Operability Determination Quality Review Board feedback on IODs to provide feedback and drive performance improvement OPPD Awards program has been used to reinforce good performance and performance gaps are evaluated to determine if systemic action or supervisory intervention is needed
- Four percent (4%) improvement (Green) in four-week IOD rolling average quality score since Nov. 2014 6 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Demonstrated Safe Plant Operation and Overall Improving Performance Conservative Decision Making / Risk Management
- Safety focused conservative decision making June 21, 2014, Missouri River projected level increase Closely coordinated with U.S. Army Corps of Engineers Implemented flood readiness measures Decreased reactor power in anticipation of safe and timely shutdown River level crested below projections Dec. 17, 2014, reactor trip recovery Plant equipment responded as designed Operator response promptly stabilized the unit Fleet procedures used in support of unit restart Diesel generator starting air system upgrade Demonstrated operational focus to improve equipment reliability Example of continued investment in the plant Maintenance Backlog Reduction 7 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Backlog Reduction Work Management / Maintenance Goal: Increase operational focus of backlog management using a five-pronged approach
- Corrective Critical (CCs) has remained zero for the last five months through scheduled work and effective Fix-it-Now support
- 268 Deficient Critical (DCs) scheduled and completed in past five months
- Improved Plant Health Committee(PHC) work order (WO) tracking has yielded greater stability and adherence for completing PHC coded WOs
- 98 PHC WOs have been completed in the past five months
Operational Equipment Performance Excellence Reliability Improvement Integrated System Health Safety Assessment - Comparison System Nov. 2014 Feb. 2015 Date to White Auxiliary Feedwater N/A Emergency Diesel Generator N/A Electrical Equipment - High Voltage 2Q15 High-Pressure Safety Injection N/A Electrical Equipment - Low Voltage N/A Raw Water 4Q15 Feedwater N/A Turbine Plant Cooling Water N/A Instrument Air N/A Reactor Coolant System N/A Containment Cooling Water 2Q15 Reactor Protective System N/A System Health Green = Excellent Yellow = Marginal White = Acceptable Red = Unacceptable 9 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Backlog Reduction - Engineering
- Reduce backlogs to industry norm levels
- Correct deficiencies affecting plant design and licensing bases
- Focus Areas CAP Backlogs Operability Evaluations Engineering Change Packages End of Service Life Evaluations High Energy Line Break Reconstitution Fuse Configuration Control Preventive Maintenance Change Requests / Classifications / Bases Obsolescence and Critical Spares Circuit Card Replacement and Trending 10 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Outage Scope to Enhance Safety Margins and Equipment Reliability
- Pressurizer heater upgrade / replacement
- Fukushima modifications for electrical power and emergency fill
- Equipment qualification modification for Auxiliary Building corridors
- End of service life replacements 4160 volt AC breakers (22) - 241 relays 480 volt AC breakers (8) - 2 valves 30 additional items
- Valve work 64 air operated valves - 33 motor operated valves 16 check valves - 52 relief valves
- 22 incore instrument replacements
- Reactor vessel head stand and containment internal structure interference removal 11 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Containment Internal Structure and Design & Licensing Basis Projects Update
- Refueling Outage 27 Scope Reactor Vessel Head Stand (RVHS)
Any deficiencies corrected to restore full design margin as described in the Fort Calhoun licensing basis Demolish the four existing concrete pedestals Install a steel structure redistributing the RVHS loads to existing adjacent walls and concrete columns Containment Internal Structure (CIS)
Resolution of piping and cabling interferences associated with CIS column installation
- Scope deferral from refueling outage 27 to refueling outage 28 Containment Internal Structure Operability Evaluation will remain in effect First-of-a-kind evolution Returning Beam 22A, Beam 22B and B-46B to Full Design Margin Reactor Coolant Pump Power Cable reroutes Interference removal associated with column installation 12 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Containment Internal Structure and Design & Licensing Basis Projects Update
- Design and Licensing Basis Control and Use Completed pilot project (reconstitution of USAR Section 9.8 on Raw Water System)
Project team and Independent Oversight Committee (IOC) identified changes to improve the reconstitution effort Process and procedure changes have been implemented Reconstitution process, including changes and progress, were reviewed by the Component Design Bases Inspection (CDBI) team Production phase in progress Reconstitution has started on 16 USAR Sections 132 USAR Sections are being reconstituted 13 Driving to Sustained Excellence
Operational Equipment Performance Excellence Reliability Improvement Nuclear Oversight Independent Assessment 14
Operational Equipment Performance Excellence Reliability Improvement Established an Effective Long-Range Improvement Program
- Aligned the organization on Safety-focused Vision, Mission, Values Integrated Improvement Plan 2015 Nuclear Professional Priorities
- OPPD corporate governance and oversight
- Additional Exelon oversight of recovery progress and effectiveness
- FCS fully transitioning to the Exelon process for performance improvement 15 Driving to Sustained Excellence
OPPD Vision A fully engaged organization that achieves competitive rates, while maintaining financial stability and high satisfaction.
OPPD Mission Provide affordable, reliable and environmentally sensitive energy services to our customers.
16 16