ML14149A085

From kanterella
Jump to navigation Jump to search
5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report
ML14149A085
Person / Time
Site: Cooper, Fort Calhoun  Omaha Public Power District icon.png
Issue date: 05/22/2014
From:
Nebraska Public Power District (NPPD), Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
Sebrosky J
Shared Package
ML14149A068 List:
References
Download: ML14149A085 (3)


Text

ID Progress Task Name Start Finish 2013 2014 2015 J J A S O N D J FMAM J J A S O N D J FMAM J J A S O N D J FMAM 1 300/600 FCSCNS MISSOURI RIVER PMF ANALYSES Fri 6/22/12 Tue 9/30/14 2 100% 310 FCS Update/Calibrate Existing Steady State HECRAS Model Fri 6/22/12 Fri 1/24/14 48 100% 610 CNS Update/Calibrate Existing Steady State HECRAS Model Fri 6/22/12 Fri 1/24/14 93 100% 320 FCS Develop PMP Mon 8/27/12 Thu 5/23/13 122 100% 620 CNS Develop PMP Tue 10/9/12 Thu 10/24/13 142 100% 330 FCS Develop PMF using HECHMS Tue 5/14/13 Mon 5/19/14 196 100% 630 CNS Develop PMF using HECHMS Wed 5/1/13 Wed 5/21/14 248 100% 340 FCS PMF Routing using Unsteady HECRAS Fri 8/9/13 Thu 5/15/14 284 100% 640 CNS PMF Routing using HECRAS Fri 7/6/12 Thu 5/22/14 321 660 CNS Develop Site Hydraulic 2D Model and Evaluate Site Specific Tue 9/3/13 Fri 5/23/14 ErosionSedimentationDebris Effects for the PMF Hazard 330 360 FCS Develop Site 2D Hydraulic Model and Evaluate Site Specific Wed 1/22/14 Tue 6/10/14 ErosionSedimentationDebris Effects for the PMF Hazard 339 670 CNS Evaluate Windwave Runup and Hydrostatic and Mon 3/3/14 Tue 5/27/14 Hydrodynamic Forces on Safety Related SSCs for PMF Hazard 348 370 FCS Evaluate Wind Setup, Windwave Runup and Hydrostatic and Wed 5/21/14 Wed 8/6/14 Hydrodynamic Forces on SafetyRelated SSCs for the PMF Hazard 357 390 FCS CALC #1 Overall Report Wed 8/6/14 Tue 9/30/14 364 690 CNS CALC #1 OVERALL REPORT Tue 5/27/14 Fri 7/25/14 371 372 Page 1

ID Progress Task Name Start Finish 2013 2014 2015 J J A S O N D J FMAM J J A S O N D J FMAM J J A S O N D J FMAM 373 400/700 FCSCNS MISSOURI RIVER DAM FAILURE ANALYSIS Mon 7/15/13 Wed 10/8/14 374 720 CNS Evaluate Dam Failure Consequences for NonSystem Mon 7/15/13 Thu 6/12/14 Missouri/Platte Rivers Basin Dams 393 100% 420 FCS Evaluate Dam Failure Consequences for NonSystem Missouri Tue 10/1/13 Mon 6/30/14 River Basin Dams 411 760 CNS Evaluate Site Specific ErosionSedimentationDebris Effects Thu 5/29/14 Thu 7/24/14 for the Dam Failure Flood Hazard 419 460 FCS Evaluate Site Specific ErosionSedimentationDebris Effects Thu 6/12/14 Thu 8/7/14 for the Dam Failure Flood Hazard 427 770 CNS Evaluate Windwave Runup and Hydrostatic and Thu 5/29/14 Thu 7/31/14 Hydrodynamic Forces on Safety Related SSCs for Dam Failure Flood Hazard 436 470 FCS Evaluate Wind Setup, Windwave Runup and Hydrostatic and Thu 6/12/14 Thu 8/14/14 Hydrodynamic Forces on SafetyRelated SSCs for Dam Failure Flood Hazard 445 490 FCS CALC #2 Overall Report Thu 8/14/14 Wed 10/8/14 452 790 CNS CALC #2 Overall Report Fri 8/1/14 Wed 10/8/14 459 460 461 462 463 Page 2

ID Progress Task Name Start Finish 2013 2014 2015 J J A S O N D J FMAM J J A S O N D J FMAM J J A S O N D J FMAM 464 500/800 FCSCNS MISSOURI RIVER CHANNEL GEOMORPHIC ASSESSMENT Mon 2/17/14 Tue 6/10/14 465 510 FCS Missouri River Channel Geomorphic Assessment Mon 2/17/14 Tue 6/10/14 474 810 CNS Missouri River Channel Geomorphic Assessment Fri 2/28/14 Thu 6/5/14 483 FCS Local Intense Precipitation (LIP) Analysis Tue 7/17/12 Fri 6/14/13 489 CNS Local Intense Precipitation (LIP) Analysis Tue 7/17/12 Mon 3/17/14 495 FCS ICE AND DEBRIS EFFECTS ANALYSIS Mon 7/21/14 Fri 10/31/14 501 CNS ICE AND DEBRIS EFFECTS ANALYSIS Mon 7/7/14 Fri 10/31/14 507 508 509 OPPD FHRR Thu 5/1/14 Wed 2/4/15 510 Preparation of FHRR Thu 5/1/14 Fri 12/19/14 516 OPPD Submittal of FHRR Mon 12/22/14 Tue 1/27/15 521 NRC Submittal Wed 2/4/15 Wed 2/4/15 2/4 522 NPPD FHRR Thu 5/1/14 Wed 2/4/15 523 Preparation of FHRR Thu 5/1/14 Fri 12/19/14 529 NPPD Submittal of FHRR Mon 12/22/14 Tue 1/27/15 534 NRC Submittal Wed 2/4/15 Wed 2/4/15 2/4 Page 3