5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report
ML14149A085
Person / Time
Site: Cooper, Fort Calhoun  Omaha Public Power District icon.png
Issue date: 05/22/2014
From:
Nebraska Public Power District (NPPD), Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
Sebrosky J
Shared Package
ML14149A068 List:
References
Download: ML14149A085 (3)


Text

ID Progress TaskName Start Finish 1

300/600FCSCNSMISSOURIRIVERPMFANALYSES Fri6/22/12 Tue9/30/14 2

100%

310FCSUpdate/CalibrateExistingSteadyStateHECRASModel Fri6/22/12 Fri1/24/14 48 100%

610CNSUpdate/CalibrateExistingSteadyStateHECRASModel Fri6/22/12 Fri1/24/14 93 100%

320FCSDevelopPMP Mon8/27/12 Thu5/23/13 122 100%

620CNSDevelopPMP Tue10/9/12 Thu10/24/13 142 100%

330FCSDevelopPMFusingHECHMS Tue5/14/13 Mon5/19/14 196 100%

630CNSDevelopPMFusingHECHMS Wed5/1/13 Wed5/21/14 248 100%

340FCSPMFRoutingusingUnsteadyHECRAS Fri8/9/13 Thu5/15/14 284 100%

640CNSPMFRoutingusingHECRAS Fri7/6/12 Thu5/22/14 321 660CNSDevelopSiteHydraulic2DModelandEvaluateSiteSpecific ErosionSedimentationDebrisEffectsforthePMFHazard Tue9/3/13 Fri5/23/14 330 360FCSDevelopSite2DHydraulicModelandEvaluateSiteSpecific ErosionSedimentationDebrisEffectsforthePMFHazard Wed1/22/14 Tue6/10/14 339 670CNSEvaluateWindwaveRunupandHydrostaticand HydrodynamicForcesonSafetyRelatedSSCsforPMFHazard Mon3/3/14 Tue5/27/14 348 370FCSEvaluateWindSetup,WindwaveRunupandHydrostaticand HydrodynamicForcesonSafetyRelatedSSCsforthePMFHazard Wed5/21/14 Wed8/6/14 357 390FCSCALC#1OverallReport Wed8/6/14 Tue9/30/14 364 690CNSCALC#1OVERALLREPORT Tue5/27/14 Fri7/25/14 371 372 J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2013 2014 2015 Page1

ID Progress TaskName Start Finish 373 400/700FCSCNSMISSOURIRIVERDAMFAILUREANALYSIS Mon7/15/13 Wed10/8/14 374 720CNSEvaluateDamFailureConsequencesforNonSystem Missouri/PlatteRiversBasinDams Mon7/15/13 Thu6/12/14 393 100%

420FCSEvaluateDamFailureConsequencesforNonSystemMissouri RiverBasinDams Tue10/1/13 Mon6/30/14 411 760CNSEvaluateSiteSpecificErosionSedimentationDebrisEffects fortheDamFailureFloodHazard Thu5/29/14 Thu7/24/14 419 460FCSEvaluateSiteSpecificErosionSedimentationDebrisEffects fortheDamFailureFloodHazard Thu6/12/14 Thu8/7/14 427 770CNSEvaluateWindwaveRunupandHydrostaticand HydrodynamicForcesonSafetyRelatedSSCsforDamFailureFlood Hazard Thu5/29/14 Thu7/31/14 436 470FCSEvaluateWindSetup,WindwaveRunupandHydrostaticand HydrodynamicForcesonSafetyRelatedSSCsforDamFailureFlood Hazard Thu6/12/14 Thu8/14/14 445 490FCSCALC#2OverallReport Thu8/14/14 Wed10/8/14 452 790CNSCALC#2OverallReport Fri8/1/14 Wed10/8/14 459 460 461 462 463 J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2013 2014 2015 Page2

ID Progress TaskName Start Finish 464 500/800FCSCNSMISSOURIRIVERCHANNELGEOMORPHICASSESSMENT Mon2/17/14 Tue6/10/14 465 510FCSMissouriRiverChannelGeomorphicAssessment Mon2/17/14 Tue6/10/14 474 810CNSMissouriRiverChannelGeomorphicAssessment Fri2/28/14 Thu6/5/14 483 FCSLocalIntensePrecipitation(LIP)Analysis Tue7/17/12 Fri6/14/13 489 CNSLocalIntensePrecipitation(LIP)Analysis Tue7/17/12 Mon3/17/14 495 FCSICEANDDEBRISEFFECTSANALYSIS Mon7/21/14 Fri10/31/14 501 CNSICEANDDEBRISEFFECTSANALYSIS Mon7/7/14 Fri10/31/14 507 508 509 OPPDFHRR Thu5/1/14 Wed2/4/15 510 PreparationofFHRR Thu5/1/14 Fri12/19/14 516 OPPDSubmittalofFHRR Mon12/22/14Tue1/27/15 521 NRCSubmittal Wed2/4/15 Wed2/4/15 522 NPPDFHRR Thu5/1/14 Wed2/4/15 523 PreparationofFHRR Thu5/1/14 Fri12/19/14 529 NPPDSubmittalofFHRR Mon12/22/14Tue1/27/15 534 NRCSubmittal Wed2/4/15 Wed2/4/15 2/4 2/4 J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M 2013 2014 2015 Page3