Category:Conference/Symposium/Workshop Paper
MONTHYEARML0806004562008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Experiences with Large Component Replacements - Spilker 2008-03-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12258A0502012-09-10010 September 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Supplement Materials 1, 2, and 3 for 2.206 - Fort Calhoun Nuclear Power Station ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806004562008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Experiences with Large Component Replacements - Spilker ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] |
Text
Experiences with Large Component Replacements Jeffrey Spilker Supervisor - Nuclear Projects Omaha Public Power District Fort Calhoun Station
License Renewal
- Granted in 2004, solidified corporate support for life to 2033 and beyond.
- Economics
- Reliable Operation
- Efficiency
- Extended Power Uprate (EPU) of 17%
Omaha Public Power District Fort Calhoun Station
2005 Outage
- Chronic tube/tube sheet leakage
- Chloride pitting 7% of one bundle
- Under sized for current power, now EPU
- Overall health of RSG
- Titanium tubes
- Moisture Separator Refurbishment
- Efficiency
- Reduce moisture Omaha Public Power District Fort Calhoun Station
2006 Outage
- Nuclear Steam Supply System Refurbishment Project (NSSSRP)
- Steam Generators
- Pressurizer
- Reactor Vessel Head
- Rapid Refueling Package (aka - Integrated Head Assembly)
Omaha Public Power District Fort Calhoun Station
Steam Generators
- Among longest service alloy 600 mill annealed
- IGSCC, dents at carbon steel supports, inspection cost
- Integral forged piping nozzles and forged shells
- Alloy 690 thermally treated tubing
- Feedring and loose parts trap
- Inspection port access
- Supports - wear & corrosion
- Tube expansion techniques - reduced stresses
- Blowdown
- Sized for EPU Omaha Public Power District Fort Calhoun Station
Pressurizer
- One leak at temperature nozzle. 72 heater nozzles.
- Predict failure in plant life
- Concern of leak at start-up
- Containment opening available
- Integral forged piping nozzles and forged shells
- Stainless steel heater sleeves
- 36 heaters
- Alloy 52/152 weld material
- Increased size - EPU operational benefit
- TE for thermal transient monitoring
- Insulation access for inspection Omaha Public Power District Fort Calhoun Station
Reactor Vessel Head
- High inspection costs
- Predict failure during plant life
- Containment opening available
- Mono-block forging
- Eliminate extra nozzles
- Alloy 690/52/152 materials
- Minimize J-groove stresses Omaha Public Power District Fort Calhoun Station
Rapid Refueling Package
- CEDM upper housing leaks - PWSCC on spare housings
- Outage time constraints, space available and predicted dose
- CEDM upper housing design for stress and weld reduction
- Improved cooling with focus on housings and EEQ
- Minimize outage time Reactor Coolant Pumps/Motors - Not part of NSSSRP
- Rotating through pumps and motors for rebuild Omaha Public Power District Fort Calhoun Station
2006 Outage
- Low Pressure Turbine Rotors
- Indications of SCC in disk
- Benefit of efficiency
- Size for EPU
- Copper - Impact on RSG
- Size for EPU
- Degradation of Insulation Omaha Public Power District Fort Calhoun Station
Planned Projects
- High Pressure Turbine
- Generator Rewind
- Time and temperature on insulation
- Feedwater Heaters - possible
- Spare house and auxiliary Omaha Public Power District Fort Calhoun Station