Person / Time | |
---|---|
Site: | Cooper, Fort Calhoun ![]() |
Issue date: | 05/30/2014 |
From: | Nebraska Public Power District (NPPD), Omaha Public Power District |
To: | Office of Nuclear Reactor Regulation |
Sebrosky J | |
Shared Package | |
ML14149A068 | List: |
References | |
Download: ML14149A074 (1) | |
Similar Documents at Cooper, Fort Calhoun | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23317A2032023-12-13013 December 2023
[Table view]Pre-Submittal Meeting: Tech Spec Amendment Request for HPCI Flow Switch Setpoint Change ML23150A1382023-06-0101 June 2023 Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML18255A0102018-09-12012 September 2018 NRC Slides for Target Rock Public Meeting ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML17163A0192017-06-0909 June 2017 Post Shutdown Decommissioning Activities Report Public Meeting ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12349A1512012-12-12012 December 2012 Licensee Slides from 12/12/2012 Public Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District IR 05000298/20110092011-06-10010 June 2011 EA-11-204, Cooper Nuclear Station, Final Significance Determination of White Finding and Notice of Violation, NRC Inspection Report 05000298/2011009 ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station 2023-06-01 Category:Slides and Viewgraphs MONTHYEARML23150A1382023-06-0101 June 2023
[Table view]Pre Submittal Meeting: Containment Inservice Inspection (Cisi) Relief Request, June 1, 2023 ML23150A1372023-06-0101 June 2023 Pre-Submittal Meeting: Diesel Generator Fuel Oil Storage Tank Cleaning/Inspection, June 1, 2023 ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML21125A0372021-05-0606 May 2021 May 6, 2021 Public Meeting (Observation) Slides for RAP Back Program Presentation to Industry(003) ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19196A3452019-07-18018 July 2019 July 18, 2019 Public Teleconference Slides Appendix J Exemption Request Presubmittal Teleconference ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML18255A0142018-09-12012 September 2018 BWROG Presentation Slides for Public Meeting Sept 12 2018 ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13178A1592013-06-26026 June 2013 Summary of Meeting for Public Meeting with Nebraska Public Power District Regarding Cooper Nuclear Station ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12258A0502012-09-10010 September 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Supplement Materials 1, 2, and 3 for 2.206 - Fort Calhoun Nuclear Power Station ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station ML1121401792011-07-11011 July 2011 Licensee Slides from Conference Call with Nebraska Public Power District ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1113805552011-05-16016 May 2011 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station ML1112606772011-05-0606 May 2011 Summary of Meeting with Nebraska Public District, Cooper Discussed the Significance, Cause and Corrective Action Associated with an Apparent Violation with Low-to-Moderate Safety Significance ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1029202962010-10-19019 October 2010 Meeting Handouts for October 19, 2010 with Nebraska Public Power District Regarding Cooper Nuclear Station ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1016001102010-06-0909 June 2010 Summary of Annual Performance Assessment Meeting for Cooper Nuclear Station 2023-06-01 |
Text
Questions from NRC Staff with Responses Q1 Part 2:
HEC-RAS modeling was performed by USACE. Why model this reach again? How do you expect the results to change and why?
R1 Part 2:
A HEC-RAS model of the Missouri River was developed p from below Gavins Point to below CNS
- to route the failure of potentially critical dams using multiple hypothetical d
dams to d determine iff these h d dams are noncritical lddams and d are exempt ffrom detailed analyses
- to carry forward the cumulative effect of the noncritical dams by routing USACE dam failure hydrographs and the dam failure hydrographs for the noncritical dams to the NPP sites in accordance with the ISG We are currently running these calculations and do not have results.
6/4/2014 14