ML14149A074
| ML14149A074 | |
| Person / Time | |
|---|---|
| Site: | Cooper, Fort Calhoun |
| Issue date: | 05/30/2014 |
| From: | Nebraska Public Power District (NPPD), Omaha Public Power District |
| To: | Office of Nuclear Reactor Regulation |
| Sebrosky J | |
| Shared Package | |
| ML14149A068 | List: |
| References | |
| Download: ML14149A074 (1) | |
Text
Questions from NRC Staff with Responses Questions from NRC Staff with Responses Q1 Part 2:
HEC-RAS modeling was performed by USACE. Why model this reach again? How do you expect the results to change and why?
do you expect the results to change and why?
R1 Part 2:
A HEC-RAS model of the Missouri River was developed from below Gavins Point to p
below CNS to route the PMF to the NPPs to route the failure of potentially critical dams using multiple hypothetical d
d f h d
l d
d f
dams to determine if these dams are noncritical dams and are exempt from detailed analyses to carry forward the cumulative effect of the noncritical dams by routing USACE dam failure hydrographs and the dam failure hydrographs for the USACE dam failure hydrographs and the dam failure hydrographs for the noncritical dams to the NPP sites in accordance with the ISG We are currently running these calculations and do not have results.
6/4/2014 14