MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML17163A0192017-06-0909 June 2017 Post Shutdown Decommissioning Activities Report Public Meeting ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14149A0852014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Hi-Level Overview Schedule for Flooding Hazard Reevaluation Report ML14149A0882014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart ML14149A0902014-05-22022 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule June 2012 Through February 2015 Gantt Chart ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12349A1512012-12-12012 December 2012 Licensee Slides from 12/12/2012 Public Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806703502008-03-0404 March 2008 Meeting Summary for Public Meeting with Omaha Public Power District ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24102A1882024-03-31031 March 2024 Omaha Public Power District Presentation Given at the March 27, 2024 Public Meeting on Submittal of Phase I Final Status Surveys for the Decommissioning of Fort Calhoun Station, Unit 1 ML24102A1622024-03-18018 March 2024 NRC Presentation on Reviews of Final Status Survey Reports Given at the March 27, 2024, Public Meeting with OPPD on Fort Calhoun Station Unit 1 Submittal of Phase I Final Status Surveys – (License No. DPR-40, Docket No. 50-285) ML22222A1112022-07-28028 July 2022 2022 Kmkt Fort Calhoun Flood Finding and 2011 Missouri River Flooding Reduce ML20080M1542020-02-21021 February 2020 PFHA-2020-3B-2-George-Fort-Calhoun-2011-compressed ML20080M1582020-02-21021 February 2020 PFHA-2020-3B-3-Vossmar_Stafford-2019_CNS_FCS_Flooding ADAMS Version ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release ML17160A3842017-05-31031 May 2017 Public Meeting, May 31, 2017 Region IV Slides Fort Calhoun PSDAR ML16291A0192016-10-17017 October 2016 OPPD Pre-Submittal Meeting Regarding Fort Calhoun Station Decommissioning October 18, 2016 ML16027A0792016-02-0202 February 2016 Meeting Slides for 2/2/16 Teleconference with Omaha Public Power District - License Amendment Request (Lar), Proposed Changes to Implementation of NFPA 805 (2001 Edition) at Fort Calhoun Station ML15114A3962015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Use of Ansi/Ans 58.14 ML15114A3862015-04-23023 April 2015 Licensee Slides - 4/23/15 Public Meeting, License Amendment Request for Class I Structures ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14338A6252014-12-0202 December 2014 Oppd'S Fort Calhoun Station Driving to Excellence, Public Meeting with the U.S. Nuclear Regulatory Commission Containment Internal Structures 12/2/201 ML14149A0742014-05-30030 May 2014 5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Response to Question 1 Part 2 ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14129A1492014-05-0909 May 2014 Station/Cooper Nuclear Station - Meeting Slide for Flood Hazard Reevaluation Report Schedule Extension Review ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13239A1032013-08-27027 August 2013 2013-08-27 Region IV Visit Final Presentation ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13112A0522013-04-22022 April 2013 Meeting Handouts April 22, 2013 Meeting with Omaha Public Power District to Discuss Potential Fort Calhoun Licensing Actions ML13114A9362013-04-22022 April 2013 Redacted Meeting Handouts from Closed April 22, 2013 Meeting with Omaha Public Power District to Discuss Means for Protecting Fort Calhoun Station, Unit 1, Against Flooding ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML13008A3672013-01-0808 January 2013 Briefing on Fort Calhoun Station, January 8, 2013 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12258A0502012-09-10010 September 2012 G20120458/EDATS: OEDO-2012-0390 - Wallace L. Taylor Ltr. Supplement Materials 1, 2, and 3 for 2.206 - Fort Calhoun Nuclear Power Station ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12102A0412012-04-11011 April 2012 Public Meeting Slides (0350) ML12102A0432012-04-0404 April 2012 04/4/2012 Omaha Public Power District Public Meeting (0350) ML12053A2092012-02-22022 February 2012 M120222B - Slides, Briefing on Fort Calhoun ML1115702962011-05-26026 May 2011 Licensee Slides from 5/26/11 Pre-Submittal Meeting to Discuss NFPA 805 Fire Protections ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1109505962011-04-0505 April 2011 Licensee Slides from 4/5/11 Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1101402412011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Impact of EPU on Rps/Esfas Setpoints ML1101402332011-01-13013 January 2011 Licensee Slides from 1/13/11 Meeting, Spent Fuel Pool Criticality Analysis ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML0931401622009-11-0505 November 2009 Presentation Slides from November 5, 2009, Category 1 Meeting with Omaha Public Power District on Plans to Submit an Extended Power Uprate Application ML0903704552009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0903706482009-01-28028 January 2009 Licensee Slides, January 28, 2009, Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0815003632008-05-29029 May 2008 Summary of Meeting with Omaha Public Power, Fort Calhoun Station on 2007 Performance and Regulatory ML0806004562008-03-0606 March 2008 02/19-02/21/2008 Nrc/Doe Workshop Presentation: Experiences with Large Component Replacements - Spilker ML0736200572007-12-27027 December 2007 Summary of Meeting with Omaha Public Power District to Discuss Performance at Fort Calhoun Station & Status of Station Performance Improvement Plan ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0717906542007-06-28028 June 2007 Handout for Meeting with Representatives of Omaha Public Power District for Fort Calhoun 2024-03-31
[Table view] |
Text
i S Agenda 0 Background B. Van Sant -OPPD 0 Analysis S. Singh-S&L L. Marsh-Berger Abam E. Landis-Par
- Licensing Review B. Van Sant- OPPD
- Schedule B. Van Sant- OPPD m Questions 2
OPPD 6/28/077 6/28/0 OPPD 2
Background
6/28/07 OPPD 3
Crane Upgrade Background mOriginal design of auxiliary building crane was 100-ton non-single failure proof (P&H) crane
- 75 tons was original projected maximum cask weight
- In 1976, project initiated for upgrading. crane to single-failure-proof status at 75 tons 4
OPPD 6/28/07 OPPD 4
Crane Upgrade Background (cont.)
- Crane upgrade was qualified to Reg. Guide 1.104 per Ederer NRC-approved topical report EDR-1
- Upgrade included a two-blockable Ederer X-SAM replacement trolley
- NRC Safety Evaluation of 5/22/84 accepted crane's single failure proof status 5
OPPD 6/28/07 OPPD 5
Plant Layout It'
, ,F? sp a L it
-- FV -4 Y \s4zF.3.
1.-'- -
1-I:'ia -LLiA =04; V 044"344 cst d' SrEgit IRf I' tw 3 p*D SIORAGL--TKG VMr WrLA1'WRN-rC AT El rIf re rLNF.
Er.d" dm~d M
I a I
/ "mmIl r I r
jIa_. f rk L IA ~ f IL
__t _ _%YZ
_ftýIMIPIF
.1 4kA ME{rTA~t-E Q0WS.
Fýt rtAW$e TOl- P-UEASPOOL rbwztrN A-C- -4 me týFZIIAi4LW mEhL unw Vbn sa.t4hFl.h Aft"A rJt-iL5 6EIE DO&
UFIER. VAKT OF CAS-,
DECON ITA.MINATI
/ N oN ARLA 0 PL TPtN I-I m E MT r,
- P4, : .- _.AV,,+.-..,,1
+.~-,+++.- +,. -. ,,,_ +,+* <
r I GZ!Vo 6/28/07 OPPD 6
Plant Layout tooP OPPD 6/28/07 OPPD 7
Dry Fuel Loading
" In 2004, OPPD elects to use a modified transfer cask design to reduce weight
" In 2006, 10 CFR 72.48 evaluation of lightweight cask design change fails
" OPPD loads only 4 canisters under an exemption 6/28/07 OPPD 8
OPPD Options
- TransNuclear licenses OS197L through amendment
- Uprate of HE-2 crane to 105 tons
- Decision date approximately October 1, 2007 9
OPPD 6/28/07 OPPD 9
I Auxiliary Building Analysis 10 OPPD 6/2 8/0 7 6/28/07 OPPD 10
Structural Analysis/Evaluation
.Methodology E Building structural configuration E Plant drawing plan & sections Seismic analysis N Loads, load combinations, and acceptance criteria 11 OPPD 6/28/07 6/28/07 OPPD 11
N Building Structural Configuration AUXILIARY BUILDING" PLANT ELEVATION 1025'-0" OPPD 12 6/28/07 OPPD 12
I MI. IaWY Building Structural Configuration EL, 1i*
6/28/07
Seismic Analysis Criteria Described in USAR
- Section 2.2.4 of Appendix F: Refueling crane analyzed with supporting runway girder subjected to acceleration from seismic ana ysis of the containment and auxiliary buil ing 0 Appendix F allows Alternate Seismic Criteria and Methodologies (ASCM) for reanalysis and design of equipment and structures.
0 Appendix F refers to EA-FC-94-003 for Alternate Seismic Criteria Methodology 15 OPPD 6/28/07 6/28/07 OPPD 15
Seism ic Analysis Criteria Described in USAR (cont.)
0 In EA-FC-94-003, Refined Seismic Response Spectra were generated for Auxiliary and Reactor building 0 NRC SER on ASCM (April 16, 1993) 16 OPPD 6/28/07 OPPD 16
Seismic Ana Iysis EA-FC-94-003 Inputs to Crane Uprate SResponse spectra developed in this document are used in crane uprate analysis
- Building model (reinforced concrete), damping 4% OBE, 7% SSE 17 OPPD 6/2 8/0 7 6/28/07 OPPD 17
ASCM Seismic Model 0 Three-dimensional dynamic model using as-built plant properties E Model includes offsets between the mass and stiffness centers 0 Floor response spectra as envelope of extreme corners and center of mass 18 OPPD 6/28/07 6/28/07 OPPD 18
SUprated Crane Seismic Analysis Coupled Crane and Crane-Support Structure Model
" A three-dimensional (GT STRUDL) crane and crane support structure model
" Three-dimensional crane model by Ederer/Berger-Abam
" Crane runway and trolley rails restraints per ASME NOG-1-2004 0 Reinforced concrete crane runway girders
" Top of runway girder continuously laterally supported- by walls 6/28/07 OPPD 19
Uprated Crane Sei smic Analysis Coupled Crane and Crane-Support Structure Model
- Boundary Conditions of the Model E The runway girders at the pool north and south ends are fixed in all six degrees of freedom
- The runway girder nodes at column supports are fixed in three translational direc:tions
- All nodes of runway girders are fixed for translation in east-west direction (lateral direction) 6/28/07 OPPD 20
Uprated Crane Seismic Analysis Various locations of trolley, bridge girder and lifted load (per ASME NOG-1-2004)
- Trolley at.end, at quarter span and at mid-span of bridge girder
- For each of above trolley locations, three bridge girders positions were selected to envelope the bridge girder locations throughout the runway girder M Lifted load conditions per NOG-1-2004 21 OPPD 6/28/07 6/28/07 OPPD 21
Seismic Analysis One Typical Crane - Crane Support Model Ew-Runway Girder A a 0- 0 U v qp------qp-------lP*"
I-Bridge Girder
! Troll I! I
-4 Runway Girder p p p - --
a 22 OPPD 6/28/07 OPPD 22
Uprated Crane Seism ic Analysis Method of Analysis Coupled crane-crane support structure analyzed using Response Spectrum Method of Analysis for OBE and SSE 0 Modal Response Combination: ten percent method (R.G. 1.92, Rev. 1) 0 Consideration of high frequency modes (rigid modes) (SRP 3.7.2, Rev.2) 0 Three Direction Combination: SRSS of maximum responses of each of three direction of excitations (R.G. 1.92, Rev. 1) 23 OPPD 6/28/07 OPPD 23
Uprated Crane Seismic Analysis Method of Analysis E Structural Damping values used: 7% for SSE and 4% for OBE 0 For reinforced concrete runway girders meets ASCM and R.G. 1.61 E For crane members meets ASME NOG-1-2004 E Seismic Input Spectra: Calculated from 7%
damped spectrum (SSE) and 4% damped spectrum (OBE) provided in ASCM at elevations 1044 ft and 1083 ft (crane girder elevation 1063.5 ft) 24 OPPD 6/28/07 OPPD 24
Seismic Analysis Input spectra at Supports of Runway
~SSEW .
Girders (El. 1063.5 ft) <- i.n_8,2 SSE,,
2 *SSE~s4 .SSF.1 ý FRequenrytH2.)
EJ. 1063.5 ft. (averafe value)
El. 3083 fL
...... l. 1044 ft.
OPPD 6/28/07 OPPD 25
Seismic Analysis Input spectra at Supports of Runway <SSEW83.
Girders (El. 1063.5 ft)
)0D SS 3.3 ISSC - 44LI? -srý_9i Frequency i~iz.
Note:
El. 1063.5 ft. (8vefCF W]UC)
El. 1083 f-.
....... 1044 ft.
OPPD 6/28/07 OPPD 26
Seismic Analysis Input spectra at Supports of Runv iay SSE Girders (El. 1063 .5* ft) * *SSE, -
SSENIl .SSE,,_4 i~'SE 3~
R1,1 nQ (H7-)
Note:
- B]. 3063.5 fl. (averafc '-]ue)
El. 1083 fi.
....... El. 3044 ft.
27 OPPD 27 6/28/07 OPPD
Loads and Load Combinations for Support Structure Evaluation
- Using same load and load combinations and acceptance criteria as original design basis
- Working Stress Design Method:
S S=D+L S=D+L+W S
S S=D+L+E
- Ultimate Stress Design Method:
" U = 1.0 D + 1.0 E'
" U = 1.0 D + 1.0 L + 1.0 E' E U = 1.0 D + 1.0 N + 1.0 Q 28 OPPD 6/2 8/0 7 6/28/07 OPPD 28
Crane Static Analysis 6/28/07 OPPD 29
Crane Mechanical Qualification m Rated Load - Static Analysis -- 105-ton
" CMAA Class 'A-I' Indoor Service 105-ton MCL Rating.
" CMAA 70 (1975) m EDR-1 Generic Licensing Topical Report, Rev. 3 30 OPPD 6/28/07 OPPD 30
Mechanical Calculations
" Presented as hand calculations
" Programmable features are not used
" Calculations may be taken at face value as all arithmetic operations are shown 31 OPPD 6/28/07 6/28/07 OPPD 31
Scope of Analys is
- Trolley drive equipment 0 Bridge drive equipment 32 OPPD 6/2 8/0 7 6/28/07 OPPD 32
Acceptance Criteria
" Redundant components - not to exceed 20% of ultimate strength
" Non-redundant components - not to exceed 10% of ultimate strength
" Wire rope - per EDR-1
- Structural rated load -- CMAA 70 (1975)
E 17.6 ksi direct stress w/ impact 0 13.2 ksi shear w/ impact E 14.4 ksi direct stress w/o impact 0 10.8 ksi shear w/o impact 6/28/07 OPPD 33
Report Content
- Components that rate for 105-ton MCL 0 Identified as such in report Components that do not rate for 105-ton MCL
- Upgrade approach will be identified and qualified for 105 tons 34 OPPD 6/2 8/0 7 6/28/07 OPPD 34
Crane Dynamic Analysis 35 OPPD 6/28/07 OPPD 35
Crane Structural Qualification
- Rated Load - Static Analysis - 105-ton
- Seismic - Dynamic Analysis - 105-ton
" NUREG 0554 - Crane shall remain in place and support critical load (105-ton)
" A.S.M.E. NOG-1 (2004) - Evaluate using conventional structural analysis techniques 36 OPPD 6/28/07 OPPD 36
Structural Modeling
- Mathematical model coupled with runway
- Lumped mass, line elements
- Response spectrum approach 0 Floor spectra at runway elevation 37 OPPD 6/28/07 OPPD 37
Seismic Input
- FCS Alternate Seismic Criteria Method
" Floor Response Spectra - OBE and SSE
" RG 1..61 Damping
" Type 1 crane
" Industry-standard methodology for crane
" Damping
" Acceptance criteria (allowable stresses) 38 OPPD 6/28/077 6/28/0 OPPD 38
Configurations Considered
" Three crane positions on runway
" Three trolley positions on bridge
- Mid, quarter, end approach per NOG-1
- Rated load high, low, and no load
- Pendulum effect of lifted load-0 Included per NUREG-0554 6/28/07 OPPD 39
Crane Model 84 8281 80 32 30 209 76 22 Jy"-
108 6/28/07 OPPD 40
Damping N 4% OBE and 7% SSE Same for runway and crane Conservative relative to RG 1.61 (2007)
- 5% OBE and 7% SSE for"bolted steel with bearing connections" 0 4%/7% - same values required by NOG-1 41 OPPD 6/28/07 6/28/07 OPPD 41
Acceptance Criteria
- Rated load cases - CMAA 70 (1975)
M 17.6 ksi direct stress w/ impact 0 13.2 ksi shear w/ impact M 14.4 ksi direct stress w/o impact M 10.8 ksi shear w/o impact
- Seismic load cases - NOG-1 (2004)
M Both OBE and SSE are extreme environmental loadings 0 90% yield, direct stress N 50% yield, shear stress 42 OPPD 6/28/07 OPPD 42
Rope
" CMAA 70 - static
" Ederer Generic Licensing Topical Report EDR dynamic 6/28/07 OPPD 43
Bou ndary Conditions
- Transverse to runway including clips may consider loads distributed to both runways
- Parallel to runway only driven wheels resist lateral loads, but Iimited by friction (0.30) 44 OPPD 6/2 8/0 7 6/28/07 OPPD 44
Response Spectrum Approach
- Eigenvalues and Eigenvectors used as basis
- Individual modal response combined by ten-percent method (NRC approach for closely spaced modes)
- Directional response by SRSS
- Missing mass included as rigid modes 6/28/07 OPPD 45
Local Effect Finite Element Analysis
- Finite Element Method (FEM) analysis used for short diaphragms - not explicitly checked in CMAA 70 (1975)
- Benefit of combined box girder, short diaphragm and trolley rails included 46 OPPD 6/28/07 OPPD 46
Licensing Review 47 OPPD 6/2 8/0 7 6/28/07 OPPD 47
50.59 Evaluation
- Probability of occurrence, or consequence of an accident
- Test or experiment 48 OPPD 6/28/077 6/28/0 OPPD 48
LAR Determination
- NOG-1 methodology employed in the analysis is endorsed by NRC
- Code and standards are taken from current design and licensing basis documents
- No apparent requirement for LAR submittal 6/28/07 OPPD 49
Schedule 6/28/07 OPPD 50
Schedule ID1 2007 2008 2009 1 4th Quarted 1st Quarter 2nd Quartej 3rd Quarte 4th Quarte, 1st Quarter 2nd Quartet 3rd Quarter 4th Quarter 1st Quarter 2nd Quarte 3rd 4thQuarter 41st Quarter TN issued draft LAR 2 Submit LAR to NRC 3 NRC issue amendment acceptance letter 4
t !
iii*
- ii* iii*! NRC Review of LAR 5 2008 Refueling Outage 7-0 6
7 Cranelstructure evaluations I
8 h NRC to discuss LAR 9
Il OPPD Decision on crane uprate
-w - SI Prepare LAR Prepare EC Package Ordr Equipment Equipment Delivery NRC review of LAR Install New Equipment Load fuel canisters
/
Receive new fueli 2009 Refueling Outage 6/28/07 OPPD 51
S chedule Issues Moff-0 Long lead time for crane uprate components
- Additional time required for requalification and testing
- Long review complet ion time on LAR for lightweight cask-Fall 2008 52 OPPD 6/28/077 6/28/0 OPPD 52
Summary
,0 Parallel path 0 No LAR items identified to date 6/28/07 OPPD 53
Questions/Actions 54 OPPD 6/28/077 6/28/0 OPPD 54