ML111020136

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance
ML111020136
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/12/2011
From: Clark J
NRC/RGN-IV/DRP
To: Bannister D
Omaha Public Power District
References
Download: ML111020136 (17)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 April 12, 2011 David J. Bannister Vice President Nuclear Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4-Adm P.O. Box 550 Fort Calhoun, NE 68023

Subject:

MEETING

SUMMARY

FOR PUBLIC MEETING WITH OMAHA PUBLIC POWER DISTRICT ON THE FORT CALHOUN STATION 2010 PERFORMANCE

Dear Mr. Bannister:

On April 6, 2011, representatives of the Omaha Public Power District met with NRC personnel at the Hilton Garden Inn, in Omaha, Nebraska, to discuss the NRCs 2010 end of cycle performance assessment. The meeting was held at the request of the NRC to present information regarding plant performance for the 2010 calendar year. The list of attendees and a copy of the presentation slides are included as Enclosures 1 and 2.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Jeff Clark, P. E.

Chief Project Branch E Division of Reactor Projects Docket: 50-285 License: DRP-40

Enclosures:

1. Attendance List
2. Presentation Slides

Distribution via Listserv:

Electronic distribution by RIV:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Art Howell, DRA Kriss Kennedy, D:DRP Troy Pruett, DD:DRP Anton Vegel, D:DRS Mark Haire, C:DRS/OB Sue Bogle (OEWEB Resource)

Stephanie Bush-Goddard, OEDO RIV ETA OEMAIL, D/OE Amy Powell, OCA Jenny Weil, Congressional Affairs Officer Randy Hall, Project Manager, NRR Jeff Clark, Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Jim Melfi, Project Engineer, PB/E Chris Smith, Project Engineer, PB/E John Kirkland, Senior Resident Inspector Jacob Wingebach, Resident Inspector Marisa Hernandez, RITS Coordinator Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Lynnea Wilkins, NRR Project Manager Karla Fuller, Region IV RC Nick Taylor, Region IV ACES Berni Madison, Site Administrative Assistant Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTORS\EOC and Midcycle/EOC Meeting Summaries\2011\FCS EOC MS 04-06-11 ADAMS: No Yes SUNSI Review Complete Reviewer Initials: JFM Publicly Available Non-Sensitive Non-publicly Available Sensitive PE:DRP/PBE C:DRP/PBE JFMelfi JAClark

/RA/ /RA/

04/12/2011 04/12/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax