Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding
ML111660027
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/14/2011
From: Clark J
NRC/RGN-IV/DRP/RPB-E
To: Bannister D
Omaha Public Power District
References
Download: ML111660027 (21)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 June 14, 2011 David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

SUMMARY

OF MEETING WITH OMAHA PUBLIC POWER DISTRICT REGARDING A PRELIMINARY SUBSTANTIAL FINDING

Dear Mr. Bannister:

This refers to the public regulatory conference conducted in Arlington, Texas on June 2, 2011, between the NRC and your staff. The participants discussed the circumstances associated with a preliminary finding with substantial safety significance regarding the failure of a reactor protection system contactor at the Fort Calhoun Station.

This meeting was classified as a Category 1 public meeting, as communicated in the meeting notice (ADAMS ML111380732). This provided an opportunity for members of the public to discuss regulatory issues with the NRC after the business portion of the meeting, but before the meeting adjourned. No comments were brought forward by the public.

The attendance list for the meeting is enclosed with this summary (Enclosure 1). A copy of the Omaha Public Power District presentation slides is also enclosed (Enclosure 2).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosures, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Omaha Public Power District Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

/RA/

Jeffrey A Clark, Chief Project Branch E Division of Reactor Projects Dockets: 50-285 Licenses: DPR-40

Enclosures:

1. Attendance List
2. OPPD Presentation Slides Distribution via listserv

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Vacant)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Berni.Madison@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

Project Manager (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource R:\REACTORS\FC MS Reg Conf 6-2-2011 ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials: JFM1 Publicly Available Non-Sensitive Non-publicly Available Sensitive KEYWORD: Fort Calhoun Station Regulatory Conference June 2011 PE:DRP/PBE C:DRP/PBE JMelfi JClark

/RA/ RVA for JClark 06/7/2011 06/14/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax