2019 Flood at Cooper Nuclear Station and Fort Calhoun Station February 21, 2020 Patricia Vossmar - Cooper SRI (Former)
Mike Stafford - Cooper RI
Agenda 2
- Cooper (CNS) Flood
- Fort Calhoun (FCS) Flood
- Area Flooding Damage
- Unanticipated Aftereffects
- Key Lessons Learned
Flood Prediction - CNS 3
Licensee Preparation
- Flood Plan
- Schedule Scrub
- Survey Levees
- Sandbagging
- River Monitoring 4
Licensee Preparation
- Staged Primary and Secondary Flood Barriers
- Staged FLEX equipment
- Obtained FHRR Crane 5
CNS Event
- 3/15 am - Notification of Unusual Event (NOUE)
Declared at 899.1; NRC stayed in Normal Mode.
- 3/15 pm - river level rose to 901.5 at CNS and remained stable for a few days.
6
Early Site Flooding 7
CNS Event - Plant Access Road 8
- 3/16 am - Shuttling of employees across access road required due to road flooding caused by overtopping of North plant levee. (901.5)
- 3/16 am - CNS considers shutting down.
CNS Event - Plant Access Road 9
CNS Event
- 3/16 pm - several large levee breaches upstream; river begins to lower ~2in/hr.
- 3/16 pm - With levee relief, CNS decides not to shut down.
- 3/16 - River level hovers at or below 901.5 feet for remainder of event.
- 3/24 1601 - Exited NOUE.
10
11 Before (Looking North)
After (Looking North) 12
West 13
14
Governor Visit 15
National Guard 16
Fort Calhoun Station 2019 - Event 17
- Unit permanently defueled
- Entered Abnormal Flood Procedure 3/13/19
- Staffed OCC
- Water Above Site Grade 3/15/19
- Restored offsite power 3/21
FCS 2019 - Onsite Transit 18
19
FCS 2019 -DG Fuel Oil tank Water Intrusion 20
Post Flooding Damage - Roads 21
Flooding Damage - Roads 22
Semi trucks on levee near CNS 23
- Road Closures and poor GPS directions led two semi trucks to inadvertently drive and get stuck on the levee near CNS.
Flood Aftereffects - Groundwater
- 10/2/19 - alarms for ground on Div 1 125V DC bus.
- Groundwater inleakage onto Reactor Core Isolation Cooling.
- Elevated groundwater levels exposed deficient flood penetration seals.
24
Flood Aftereffects - Heat Sink
- 12/8/19 - CNS discovers one division of Service Water discharge pipe plugged
- Determines likely cause is silting
- 12/12 - CNS begins dredging discharge
- NRC sends Special Inspection Team 25
Spencer Dam - Nebraska (Before) 26
Spencer Dam - Nebraska (After) 27
28 Key Lessons Learned
- Flood vulnerabilities difficult to predict
- Sandbags, sump pumps (defense-in-depth key)
- DG Fuel Oil flange connection protection
- Conduit and cable vault in-leakage likely
- Elevated groundwater in-leakage into plant
- Levees may overtop or fail
- Must prepare for Latent flood aftereffects
- Groundwater in-leakage; silting of heat sink
- Highly complex flood strategies introduce additional vulnerability
Questions?