Fort Calhoun Station Extended Power Uprate (EPU)

Project f

S/ S S

Impact of EPU on RPS/ESFAS Setpoints January 13, 2011

Introductions

  • Bob Dulee EPU NSSS/Licensing Manager
  • Carmen Ovici EPU NSSS/Licensing Supervisor
  • Bill Hansher FCS Licensing Supervisor
  • Steve Callis EPU Senior Licensing Engineer
  • John Adams FCS Principal Engineer - I&C
  • Ted Quinn Technology Resources

Agenda

  • EPU Overview - Bob Dulee
  • EPU and Setpoint Changes - Bob Dulee
  • RPS/ESFAS Calculation Updates - John Adams RPS/ESFAS Calculation Updates John Adams
  • Surveillance Procedure Updates - John Adams
  • Technical Specification Update Schedule (for TSTF-493 related changes) - John Adams

Agenda (cont.)

  • NRC Questions
  • Meeting Follow-up Actions

Project Overview

  • 17% EPU: 1500 MWt to 1755 MWt 80 MWe
  • Engineering & Licensing work in progress AREVA S&L d WEC

- AREVA, S&L and WEC

  • Submit LAR to NRC: March 31, 2011
  • Plant Modifications: 2011/2012 RFOs
  • Implement EPU: Post-2012 RFO

EPU and RPS/ESFAS Setpoint Changes

  • Safety analyses have been performed in support of EPU Analytical limits for RPS and ESFAS trip functions are not changed by EPU

EPU and RPS/ESFAS Setpoint Changes (cont.)

  • No changes to Technical Specifications for RPS or ESFAS Setpoints are required with EPU Implementation
  • TSTF-493 requirements will be addressed in a separate LAR

RPS/ESFAS Setpoint Calculation Update

  • OPPD has initiated updates to all of the Technical Specification RPS/ESFAS Calculations to address TSTF-493 requirements
  • TSTF-493 definitions and methods for As-Found and As-left Tolerances will be incorporated into setpoint calculation methodology
  • A plant specific transmitter drift analysis is being developed to ensure currently used drift terms are bounding

Surveillance Procedure Updates

  • Surveillance procedure revisions related to TSTF-493 will be incorporated after calculations are finalized
  • Preliminary review of surveillance test tolerances indicates that current tolerances are generally adequate and that few changes will be needed

Technical Specification Revisions

  • Any changes to Technical Specifications resulting from the TSTF-493 upgrades will be addressed in the future as a separate LAR (i e addressed in the future as a separate LAR (i.e.

not related to the EPU LAR)

  • The TSTF-493 submittal is expected to occur after EPU implementation

Questions?

Meeting Follow-up Actions