Fort Calhoun Station Extended Power Uprate (EPU)
Project f
S/ S S
Impact of EPU on RPS/ESFAS Setpoints January 13, 2011
Introductions
- Bob Dulee EPU NSSS/Licensing Manager
- Carmen Ovici EPU NSSS/Licensing Supervisor
- Bill Hansher FCS Licensing Supervisor
- Steve Callis EPU Senior Licensing Engineer
- Ted Quinn Technology Resources
Agenda
- EPU Overview - Bob Dulee
- EPU and Setpoint Changes - Bob Dulee
- RPS/ESFAS Calculation Updates - John Adams RPS/ESFAS Calculation Updates John Adams
- Surveillance Procedure Updates - John Adams
- Technical Specification Update Schedule (for TSTF-493 related changes) - John Adams
Agenda (cont.)
- NRC Questions
- Meeting Follow-up Actions
Project Overview
- 17% EPU: 1500 MWt to 1755 MWt 80 MWe
- Engineering & Licensing work in progress AREVA S&L d WEC
- AREVA, S&L and WEC
- Submit LAR to NRC: March 31, 2011
- Plant Modifications: 2011/2012 RFOs
- Implement EPU: Post-2012 RFO
EPU and RPS/ESFAS Setpoint Changes
- Safety analyses have been performed in support of EPU Analytical limits for RPS and ESFAS trip functions are not changed by EPU
EPU and RPS/ESFAS Setpoint Changes (cont.)
- No changes to Technical Specifications for RPS or ESFAS Setpoints are required with EPU Implementation
RPS/ESFAS Setpoint Calculation Update
- OPPD has initiated updates to all of the Technical Specification RPS/ESFAS Calculations to address TSTF-493 requirements
- TSTF-493 definitions and methods for As-Found and As-left Tolerances will be incorporated into setpoint calculation methodology
- A plant specific transmitter drift analysis is being developed to ensure currently used drift terms are bounding
Surveillance Procedure Updates
- Surveillance procedure revisions related to TSTF-493 will be incorporated after calculations are finalized
- Preliminary review of surveillance test tolerances indicates that current tolerances are generally adequate and that few changes will be needed
Technical Specification Revisions
- Any changes to Technical Specifications resulting from the TSTF-493 upgrades will be addressed in the future as a separate LAR (i e addressed in the future as a separate LAR (i.e.
Questions?
Meeting Follow-up Actions