ML14149A088

From kanterella
Jump to navigation Jump to search
5/22/14 Meeting Handouts - Meeting with OPPD and NPPD to Discuss Flooding Hazard Reevaluation Extension Requests for Fort Calhoun Station and Cooper Nuclear Station - Detailed Schedule May 2014 Through February 2015 Gantt Chart
ML14149A088
Person / Time
Site: Cooper, Fort Calhoun  Omaha Public Power District icon.png
Issue date: 05/22/2014
From:
Nebraska Public Power District (NPPD), Omaha Public Power District
To:
Office of Nuclear Reactor Regulation
Sebrosky J
Shared Package
ML14149A068 List:
References
Download: ML14149A088 (7)


Text

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 1 300/600 FCSCNS MISSOURI RIVER PMF ANALYSES Fri 6/22/12 Tue 9/30/14 2 100% 310 FCS Update/Calibrate Existing Steady State HECRAS Model Fri 6/22/12 Fri 1/24/14 48 100% 610 CNS Update/Calibrate Existing Steady State HECRAS Model Fri 6/22/12 Fri 1/24/14 93 94 100% 320 FCS Develop PMP Mon 8/27/12 Thu 5/23/13 123 100% 620 CNS Develop PMP Tue 10/9/12 Thu 10/24/13 143 144 100% 330 FCS Develop PMF using HECHMS Tue 5/14/13 Mon 5/19/14 198 100% 630 CNS Develop PMF using HECHMS Wed 5/1/13 Wed 5/21/14 250 251 100% 340 FCS PMF Routing using Unsteady HECRAS Fri 8/9/13 Thu 5/15/14 287 100% 640 CNS PMF Routing using HECRAS Fri 7/6/12 Thu 5/22/14 324 325 326 660 CNS Develop Site Hydraulic 2D Model and Evaluate Site Specific Tue 9/3/13 Fri 5/23/14 ErosionSedimentationDebris Effects for the PMF Hazard 327 100% 660.1 Model Development, Calibration, Validation, and Execution Tue 9/3/13 Mon 10/28/13 328 100% 660.2 Evaluate Site Specific erosion/sedimentation/debris for PMF Mon 12/2/13 Mon 12/23/13 hazard (Detailed Hydraulic Analysis) 329 100% 660.3 Report Preparation Mon 12/23/13 Thu 1/30/14 330 100% 660.4 S&L Review Thu 1/30/14 Thu 2/13/14 331 100% 660.5 S&L Comment Resolution Thu 2/13/14 Mon 3/3/14 332 100% 660.6 Client Review Mon 3/3/14 Wed 3/26/14 333 100% 660.7 Client Comment Resolution Wed 3/26/14 Fri 5/23/14 334 660.8 Technical Approval and Documentation Fri 5/23/14 Fri 5/23/14 335 336 360 FCS Develop Site 2D Hydraulic Model and Evaluate Site Specific Wed 1/22/14 Tue 6/10/14 ErosionSedimentationDebris Effects for the PMF Hazard 337 100% 360.1 Model Development, Calibration, Validation, and Execution Wed 1/22/14 Wed 3/5/14 338 100% 360.2 Evaluate Site Specific erosion/sedimentation/debris for PMF Wed 3/5/14 Wed 3/26/14 hazard 339 100% 360.3 Report Preparation Wed 3/26/14 Fri 5/2/14 340 100% 360.4 S&L Review Fri 5/2/14 Fri 5/16/14 341 360.5 S&L Comment Resolution Fri 5/16/14 Wed 5/21/14 342 360.6 Client Review Wed 5/21/14 Thu 6/5/14 343 360.7 Client Comment Resolution Thu 6/5/14 Mon 6/9/14 344 360.8 Technical Approval and Documentation Tue 6/10/14 Tue 6/10/14 345 346 347 670 CNS Evaluate Windwave Runup and Hydrostatic and Mon 3/3/14 Tue 5/27/14 Hydrodynamic Forces on Safety Related SSCs for PMF Hazard 348 100% 670.1 Evaluate wind setup and windwave runup for PMF Hazard Mon 3/3/14 Mon 3/10/14 Page 1

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 349 100% 670.2 Evaluate hydrostatic and hydrodynamic forces for the PMF Mon 3/10/14 Mon 3/17/14 Hazard 350 100% 670.3 Report Preparation Mon 3/17/14 Tue 3/25/14 351 100% 670.4 S&L Review Wed 3/26/14 Wed 4/9/14 352 100% 670.5 S&L Comment Resolution Thu 4/10/14 Wed 4/16/14 353 100% 670.6 Client Review Thu 4/17/14 Mon 4/28/14 354 100% 670.7 Client Comment Resolution Tue 4/29/14 Fri 5/23/14 355 670.8 Technical Approval and Documentation Tue 5/27/14 Tue 5/27/14 356 357 370 FCS Evaluate Wind Setup, Windwave Runup and Hydrostatic and Wed 5/21/14 Wed 8/6/14 Hydrodynamic Forces on SafetyRelated SSCs for the PMF Hazard 358 75% 370.1 Evaluate wind setup and windwave runup for PMF Wed 5/21/14 Thu 5/29/14 359 370.2 Evaluate hydrostatic and hydrodynamic forces for the PMF Thu 5/29/14 Thu 6/12/14 360 370.3 Report Preparation Thu 6/12/14 Fri 6/27/14 361 370.4 S&L Review Mon 6/30/14 Mon 7/14/14 362 370.5 S&L Comment Resolution Tue 7/15/14 Thu 7/17/14 363 370.6 Client Review Fri 7/18/14 Thu 7/31/14 364 370.7 Client Comment Resolution Fri 8/1/14 Tue 8/5/14 365 370.8 Technical Approval and Documentation Wed 8/6/14 Wed 8/6/14 366 367 368 390 FCS CALC #1 Overall Report Wed 8/6/14 Tue 9/30/14 369 10% 390.1 Report Preparation Wed 8/6/14 Fri 8/15/14 370 390.2 S&L Review Mon 8/18/14 Fri 8/29/14 371 390.3 S&L Comment Resolution Tue 9/2/14 Mon 9/8/14 372 390.4 Client Review Tue 9/9/14 Mon 9/22/14 373 390.5 Client Comment Resolution Tue 9/23/14 Mon 9/29/14 374 390.6 Technical Approval & Documentation Tue 9/30/14 Tue 9/30/14 375 376 690 CNS CALC #1 OVERALL REPORT Tue 5/27/14 Fri 7/25/14 377 690.1 Report Preparation Tue 5/27/14 Thu 6/12/14 378 690.2 S&L Review Thu 6/12/14 Thu 6/26/14 379 690.3 S&L Comment Resolution Thu 6/26/14 Thu 7/3/14 380 690.4 Client Review Thu 7/3/14 Fri 7/18/14 381 690.5 Client Comment Resolution Fri 7/18/14 Fri 7/25/14 382 690.6 Technical Approval & Documentation Fri 7/25/14 Fri 7/25/14 383 384 385 400/700 FCSCNS MISSOURI RIVER DAM FAILURE ANALYSIS Mon 7/15/13 Wed 10/8/14 386 720 CNS Evaluate Dam Failure Consequences for NonSystem Mon 7/15/13 Thu 6/12/14 Missouri/Platte Rivers Basin Dams 387 100% 720.1 Identify Inconsequential/Potentially Critical Dams Mon 7/15/13 Fri 1/24/14 388 100% 720.1.1 Review Existing CNPPID Report Mon 7/15/13 Wed 7/31/13 389 100% 720.1.2 Identify all dams in the drainage above CNS that do not lie Tue 10/1/13 Fri 11/29/13 in drainages that enter the System Page 2

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 390 100% 720.1.3 Identify the inconsequential dams subset. Mon 12/2/13 Tue 12/31/13 391 100% 720.1.4 Identify the potentially critical dams subset. Mon 1/20/14 Fri 1/24/14 392 100% 720.2 Apply the ISGs Simplified Modeling Approach Method 4 - Mon 1/27/14 Tue 4/15/14 Hydrologic Model Method 393 100% 720.2.1 Develop hypothetical dams that represent the total volume Mon 1/27/14 Fri 1/31/14 of the potentially noncritical dams 394 100% 720.2.2 Develop dam failure hydrographs for the potentially Mon 2/3/14 Fri 2/7/14 noncritical hypothetical dams and route those hydrographs to the mouth of the respective tributaries at the Missouri River using HECHMS 395 100% 720.2.3 Route the potentially noncritical dam failure hydrographs Mon 2/10/14 Fri 2/14/14 from the mouth of the tributaries to FCS using existing HECRAS Unsteady Model 396 100% 720.2.4 Confirm that the water surface elevation for the potentially Mon 2/17/14 Tue 2/18/14 noncritical dam failures is below the flood protection design elevation at CNS (905.0 NGVD) 397 100% Aquire USACE System Dam Failure Hydrographs Fri 4/4/14 Fri 4/4/14 398 100% 720.4.5 Route the USACE dam failure hydrograph and the Fri 4/4/14 Tue 4/15/14 noncritical dam failure hydrographs using HDR HECRAS Unsteady Model 399 100% 720.3 Report Preparation Wed 4/16/14 Thu 5/8/14 400 100% 720.4 S&L Review Fri 5/9/14 Thu 5/22/14 401 720.5 S&L Comment Resolution Fri 5/23/14 Wed 5/28/14 402 720.6 Client Review Fri 5/23/14 Fri 6/6/14 403 720.7 Client Comment Resolution Mon 6/9/14 Wed 6/11/14 404 720.8 Technical Approval and Documentation Thu 6/12/14 Thu 6/12/14 405 406 100% 420 FCS Evaluate Dam Failure Consequences for NonSystem Missouri Tue 10/1/13 Mon 6/30/14 River Basin Dams 407 100% 420.1 Identify Inconsequential/Potentially Critical Dams Tue 10/1/13 Fri 1/24/14 408 100% 420.1 Identify all dams in the drainage above FCS that do not lie in Tue 10/1/13 Fri 11/29/13 drainages that enter the System.

409 100% 420.2 Identify the inconsequential dams subset. Mon 12/2/13 Tue 12/31/13 410 100% 420.3 Identify the potentially critical dams subset. Mon 1/20/14 Fri 1/24/14 411 100% 420.2 Apply the ISGs Simplified Modeling Approach Method 4 - Wed 2/19/14 Tue 4/15/14 Hydrologic Model Method:

412 100% 420.2.1 Develop hypothetical dams that represent the total volume Wed 2/19/14 Tue 2/25/14 of the potentially noncritical dams 413 100% 420.2.2 Develop dam failure hydrographs for the potentially Wed 2/26/14 Tue 3/4/14 noncritical hypothetical dams and route those hydrographs to the mouth of the respective tributaries at the Missouri River using HECHMS Page 3

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 414 100% 420.2.3 Route the potentially noncritical dam failure hydrographs Wed 3/5/14 Tue 3/11/14 from the mouth of the tributaries to FCS using existing HECRAS Unsteady Model 415 100% 420.2.4 Confirm that the water surface elevation for the potentially Wed 3/12/14 Thu 3/13/14 noncritical dam failures is below the flood protection design elevation at FCS (1014.0 NGVD) 416 100% Receive USACE System Dam Failure Hydrographs Fri 4/4/14 Fri 4/4/14 417 100% 420.2.5 Route the USACE dam failure hydrograph and the Fri 4/4/14 Tue 4/15/14 noncritical dam failure hydrographs using HDR HECRAS Unsteady Model 418 100% 420.3 Report Preparation Fri 5/9/14 Thu 5/22/14 419 420.4 S&L Review Fri 5/23/14 Fri 6/6/14 420 420.5 S&L Comment Resolution Mon 6/9/14 Wed 6/11/14 421 420.6 Client Review Thu 6/12/14 Wed 6/25/14 422 420.7 Client Comment Resolution Thu 6/26/14 Mon 6/30/14 423 420.8 Technical Approval and Documentation Mon 6/30/14 Mon 6/30/14 424 425 426 760 CNS Evaluate Site Specific ErosionSedimentationDebris Effects Thu 5/29/14 Thu 7/24/14 for the Dam Failure Flood Hazard 427 760.1 Determine Site Specific erosion/sedimentation/debris impacts Thu 5/29/14 Thu 6/5/14 for dam failure using 1 D Unsteady HECRAS results 428 760.2 Report Preparation Fri 6/6/14 Mon 6/16/14 429 760.3 S&L Review Tue 6/17/14 Mon 6/30/14 430 760.4 S&L Comment Resolution Tue 7/1/14 Thu 7/3/14 431 760.5 Client Review Mon 7/7/14 Fri 7/18/14 432 760.6 Client Comment Resolution Mon 7/21/14 Wed 7/23/14 433 760.7 Technical Approval and Documentation Thu 7/24/14 Thu 7/24/14 434 435 460 FCS Evaluate Site Specific ErosionSedimentationDebris Effects Thu 6/12/14 Thu 8/7/14 for the Dam Failure Flood Hazard 436 460.1 Determine Site Specific erosion/sedimentation/debris impacts Thu 6/12/14 Thu 6/19/14 for dam failure using 1 D Unsteady HECRAS results 437 460.2 Report Preparation Fri 6/20/14 Tue 7/1/14 438 460.3 S&L Review Wed 7/2/14 Wed 7/16/14 439 460.4 S&L Comment Resolution Thu 7/17/14 Mon 7/21/14 440 460.5 Client Review Mon 7/21/14 Mon 8/4/14 441 460.6 Client Comment Resolution Mon 8/4/14 Wed 8/6/14 442 460.7 Technical Approval and Documentation Thu 8/7/14 Thu 8/7/14 443 444 Page 4

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 445 770 CNS Evaluate Windwave Runup and Hydrostatic and Thu 5/29/14 Thu 7/31/14 Hydrodynamic Forces on Safety Related SSCs for Dam Failure Flood Hazard 446 770.1 Evaluate wind setup and windwave runup for dam failure Thu 5/29/14 Wed 6/4/14 447 770.2 Evaluate hydrostatic and hydrodynamic forces for dam failure Thu 6/5/14 Wed 6/11/14 448 770.3 Report Preparation Thu 6/12/14 Tue 6/24/14 449 770.4 S&L Review Wed 6/25/14 Wed 7/9/14 450 770.5 S&L Comment Resolution Thu 7/10/14 Mon 7/14/14 451 770.6 Client Review Tue 7/15/14 Mon 7/28/14 452 770.7 Client Comment Resolution Tue 7/29/14 Thu 7/31/14 453 770.8 Technical Approval and Documentation Thu 7/31/14 Thu 7/31/14 454 455 470 FCS Evaluate Wind Setup, Windwave Runup and Hydrostatic and Thu 6/12/14 Thu 8/14/14 Hydrodynamic Forces on SafetyRelated SSCs for Dam Failure Flood Hazard 456 470.1 Evaluate wind setup and windwave runup for dam failure Thu 6/12/14 Wed 6/18/14 457 470.2 Evaluate hydrostatic and hydrodynamic forces for dam failure Thu 6/19/14 Wed 6/25/14 458 470.3 Report Preparation Thu 6/26/14 Wed 7/9/14 459 470.4 S&L Review Thu 7/10/14 Wed 7/23/14 460 470.5 S&L Comment Resolution Thu 7/24/14 Mon 7/28/14 461 470.6 Client Review Mon 7/28/14 Mon 8/11/14 462 470.7 Client Comment Resolution Mon 8/11/14 Wed 8/13/14 463 470.8 Technical Approval and Documentation Thu 8/14/14 Thu 8/14/14 464 465 466 490 FCS CALC #2 Overall Report Thu 8/14/14 Wed 10/8/14 467 490.1 Report Preparation Thu 8/14/14 Mon 8/25/14 468 490.2 S&L Review Mon 8/25/14 Tue 9/9/14 469 490.3 S&L Comment Resolution Tue 9/9/14 Tue 9/16/14 470 490.4 Client Review Tue 9/16/14 Tue 9/30/14 471 490.5 Client Comment Resolution Tue 9/30/14 Tue 10/7/14 472 490.6 Technical Approval & Documentation Tue 10/7/14 Wed 10/8/14 473 474 790 CNS CALC #2 Overall Report Fri 8/1/14 Wed 10/8/14 475 790.1 Report Preparation Fri 8/1/14 Mon 8/25/14 476 790.2 S&L Review Tue 8/26/14 Tue 9/9/14 477 790.3 S&L Comment Resolution Wed 9/10/14 Tue 9/16/14 478 790.4 Client Review Wed 9/17/14 Tue 9/30/14 479 790.5 Client Comment Resolution Wed 10/1/14 Tue 10/7/14 480 790.6 Technical Approval & Documentation Wed 10/8/14 Wed 10/8/14 481 482 483 500/800 FCSCNS MISSOURI RIVER CHANNEL GEOMORPHIC ASSESSMENT Mon 2/17/14 Tue 6/10/14 484 510 FCS Missouri River Channel Geomorphic Assessment Mon 2/17/14 Tue 6/10/14 Page 5

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 485 100% 510.1 Determine potential geomorphic changes to FCS site under Mon 2/17/14 Wed 3/5/14 dominate flood hazard conditions 486 100% 510.2 Determine potential geomorphic changes impacts to FCS Wed 3/5/14 Wed 4/2/14 safetyrelated SSCs 487 100% 510.3 Report Preparation Thu 4/3/14 Tue 4/22/14 488 100% 510.4 S&L Review Wed 4/23/14 Tue 5/6/14 489 100% 510.5 S&L Comment Resolution Wed 5/7/14 Fri 5/16/14 490 510.6 Client Review Mon 5/19/14 Mon 6/2/14 491 510.7 Client Comment Resolution Tue 6/3/14 Mon 6/9/14 492 510.8 Technical Approval and Documentation Tue 6/10/14 Tue 6/10/14 493 494 810 CNS Missouri River Channel Geomorphic Assessment Fri 2/28/14 Thu 6/5/14 495 100% 810.1 Determine potential geomorphic changes to FCS site under Fri 2/28/14 Tue 3/18/14 dominate flood hazard conditions 496 100% 810.2 Determine potential geomorphic changes impacts to FCS Wed 3/19/14 Tue 4/15/14 safetyrelated SSCs 497 100% 810.3 Report Preparation Wed 4/16/14 Thu 5/1/14 498 100% 810.4 S&L Review Fri 5/2/14 Thu 5/15/14 499 100% 810.5 S&L Comment Resolution Fri 5/16/14 Tue 5/20/14 500 810.6 Client Review Fri 5/16/14 Fri 5/30/14 501 810.7 Client Comment Resolution Mon 6/2/14 Wed 6/4/14 502 810.8 Technical Approval & Documentation Thu 6/5/14 Thu 6/5/14 503 504 505 FCS Local Intense Precipitation (LIP) Analysis Tue 7/17/12 Fri 6/14/13 506 FCS LIP Technical Analysis Tue 7/17/12 Tue 9/11/12 507 Report Preparation Wed 9/12/12 Tue 1/22/13 508 Client Review Wed 1/23/13 Mon 4/1/13 509 Client Comment Resolution Tue 4/2/13 Wed 6/12/13 510 Issue Final Approved Local PMP Calc to Client Thu 6/13/13 Fri 6/14/13 511 512 CNS Local Intense Precipitation (LIP) Analysis Tue 7/17/12 Mon 3/17/14 513 CNS LIP Technical Analysis Tue 7/17/12 Wed 2/27/13 514 Report Preparation Thu 2/28/13 Wed 5/15/13 515 Client Review Thu 5/16/13 Tue 6/25/13 516 Client Comment Resolution Wed 6/26/13 Tue 1/28/14 517 Issue Final Approved Local PMP Calc to Client Mon 3/17/14 Mon 3/17/14 518 519 520 FCS ICE AND DEBRIS EFFECTS ANALYSIS Mon 7/21/14 Fri 10/31/14 521 Determine effects of debris impact on Safetyrelated SSCs Mon 7/21/14 Fri 9/26/14 522 Determine effects of ice on Safetyrelated SSCs Mon 7/21/14 Fri 9/26/14 523 QA Review & Comment Resolution Fri 9/26/14 Fri 10/3/14 524 Client Review & Comment Resolution Mon 10/6/14 Fri 10/17/14 Page 6

ID Progress Task Name Start Finish 2015 M J J A S O N D J F M A 525 Transmittal to Client Fri 10/17/14 Fri 10/31/14 526 527 CNS ICE AND DEBRIS EFFECTS ANALYSIS Mon 7/7/14 Fri 10/31/14 528 Determine effects of debris impact on Safetyrelated SSCs Mon 7/7/14 Fri 9/26/14 529 Determine effects of ice on Safetyrelated SSCs Mon 7/7/14 Fri 9/26/14 530 QA Review & Comment Resolution Mon 9/29/14 Fri 10/3/14 531 Client Review & Comment Resolution Tue 10/7/14 Fri 10/17/14 532 Transmittal to Client Mon 10/20/14 Fri 10/31/14 533 534 535 OPPD FHRR Thu 5/1/14 Wed 2/4/15 536 Preparation of FHRR Thu 5/1/14 Fri 12/19/14 537 HDR FCS Calculations Complete Wed 10/8/14 Wed 10/8/14 10/8 538 5% Report Preparation / Technical Review Thu 5/1/14 Wed 11/26/14 539 OPPD Technical Review Mon 12/1/14 Fri 12/12/14 540 S&L Comment Resolution Mon 12/15/14 Fri 12/19/14 541 Transmittal to OPPD Fri 12/19/14 Fri 12/19/14 12/19 542 OPPD Submittal of FHRR Mon 12/22/14 Tue 1/27/15 543 Submittal Verification and Validation Mon 12/22/14 Tue 1/6/15 544 Management Review Wed 1/7/15 Tue 1/13/15 545 Resolution of Management Comments Wed 1/14/15 Tue 1/20/15 546 Signature Wed 1/21/15 Tue 1/27/15 547 NRC Submittal Wed 2/4/15 Wed 2/4/15 2/4 548 NPPD FHRR Thu 5/1/14 Wed 2/4/15 549 Preparation of FHRR Thu 5/1/14 Fri 12/19/14 550 HDR CNS Calculations Complete Wed 10/8/14 Wed 10/8/14 10/8 551 Report Preparation / Technical Review Thu 5/1/14 Wed 11/26/14 552 NPPD Technical Review Mon 12/1/14 Fri 12/12/14 553 S&L Comment Resolution Mon 12/15/14 Fri 12/19/14 554 Transmittal to OPPD Fri 12/19/14 Fri 12/19/14 12/19 555 NPPD Submittal of FHRR Mon 12/22/14 Tue 1/27/15 556 Submittal Verification and Validation Mon 12/22/14 Tue 1/6/15 557 Management Review Wed 1/7/15 Tue 1/13/15 558 Resolution of Management Comments Wed 1/14/15 Tue 1/20/15 559 Signature Wed 1/21/15 Tue 1/27/15 560 NRC Submittal Wed 2/4/15 Wed 2/4/15 2/4 Page 7