ML20080M154
Jump to navigation
Jump to search
| ML20080M154 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/21/2020 |
| From: | Gerond George NRC Region 4 |
| To: | Office of Nuclear Regulatory Research |
| T. Aird | |
| Shared Package | |
| ML20080M135 | List:
|
| References | |
| Download: ML20080M154 (30) | |
Text
Reflections on Fort Calhoun Station Yellow Flood Finding and 2011 Flood Event
Response
Fifth Annual NRC Probabilistic Flood Hazard Assessment Workshop Rockville, MD Gerond A. George, Senior Reactor Inspector February 21, 2020
THE PLANT WITHSTOOD THIS CHALLENGE INTACT IN LARGE PART BECAUSE OF COMMENDABLE PERFORMANCE BY NRC INSPECTORS, ANALYSTS, AND MANAGERS THE PREVIOUS YEAR.
-The NRC and Nuclear Power Plant Safety in 2011: Living on Borrowed Time DAVID LOCHBAUM Union of Concerned Scientists 2011 Missouri River Flood Event
1014 Ft MSL 1009.5 Ft MSL Unsealed Penetration
Insights for Enhancing Flood Protection and Risk Assessment
- 1. Rivers Change
- 2. Experience with Sandbags
- 3. Maintenance of Structures and Barriers during the Event
- 4. Potential Hazardous Attitudes and Stress
Contact Info:
Gerond George NRC Region IV Gerond.George@nrc.gov 8172001562