| {{#Wiki_filter:1Clark, Phyllis From:Clark, Phyllis Sent:Wednesday, March 01, 2017 7:13 PM To:mchisum@entergy.com Cc:jjarrel@entergy.com; dfrey@entergy.c om; lmurr91@entergy.com; GYOUNG4 | | {{#Wiki_filter:1 Clark, Phyllis From:Clark, Phyllis Sent: Wednesday, March 01, 2017 7:13 PM To: mchisum@entergy.com Cc: jjarrel@entergy.com; dfrey@entergy.c om; lmurr91@entergy.com; GYOUNG4 |
| @entergy.com; Dlach@entergy.com; ataylo 1@entergy.com; aha rris@entergy.com; Milster, Leia Elizabeth; Ramirez, Frances; Speer, Chris; Wittick, Brian; Morey, Dennis; | | @entergy.com; Dlach@entergy.com; ataylo 1@entergy.com; aha rris@entergy.com; Milster, Leia Elizabeth; Ramirez, Frances; Speer, Chris; Wittick, Brian; Morey, Dennis; |
|
| |
|
Line 24: |
Line 24: |
|
| |
|
| RidsNrrDlrRarb Resource; RidsNrrDlrRasb Resource; RidsNrrDlrRsrg Resource; RidsNrrPMWaterford Resource; RidsRgn4Ma ilCenter Resource; Folk, Kevin; Keegan, Elaine; Buford, Angela; Prinaris, Andrew; Wo ng, Albert; Huynh, Alan; Sweat, Tarico; Medoff, James; Gavula, James; Lopez, Juan | | RidsNrrDlrRarb Resource; RidsNrrDlrRasb Resource; RidsNrrDlrRsrg Resource; RidsNrrPMWaterford Resource; RidsRgn4Ma ilCenter Resource; Folk, Kevin; Keegan, Elaine; Buford, Angela; Prinaris, Andrew; Wo ng, Albert; Huynh, Alan; Sweat, Tarico; Medoff, James; Gavula, James; Lopez, Juan |
| ; Cuadrado de Jesus, Samuel; Min, Seung; Obadina, Sarah; Sadollah, Mohammad; Rogers, Billy; Brittner, Donald; Fu, Bart; Allik, Brian; Lehman, Bryce; Gardner, William; Thomas, George; Mink, Aaron; Doutt, Clifford; Holston, William; Yoo, Mark; Pulvirenti, April; McIntyre, David; Burnell, Scott; Moreno, | | ; Cuadrado de Jesus, Samuel; Min, Seung; Obadina, Sarah; Sadollah, Mohammad; Rogers, Billy; Brittner, Donald; Fu, Bart; Allik, Brian; Lehman, Bryce; Gardner, William; Thomas, George; Mink, Aaron; Doutt, Clifford; Holston, William; Yoo, Mark; Pulvirenti, April; McIntyre, David; Burnell, Scott; Moreno, Angel; Kennedy, Kriss; Scott, Catherin e; Yoder, Matthew; Chazell, Russell |
| | |
| Angel; Kennedy, Kriss; Scott, Catherin e; Yoder, Matthew; Chazell, Russell | |
|
| |
|
| ==Subject:== | | ==Subject:== |
Line 47: |
Line 45: |
| Sincerely, | | Sincerely, |
|
| |
|
| 2Phyllis Clark Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation
| | 2 Phyllis Clark Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation |
|
| |
|
| Docket No. 50-382 | | Docket No. 50-382 |
Line 60: |
Line 58: |
|
| |
|
| ==Background:== | | ==Background:== |
| By letter dated December 8, 2016, the staff issued RAI B.1.34-1a regarding the absence of a staff-approved withdrawal schedule for Capsule 277° (i.e., the surveillance capsule representing the period of extended operation). In its response dated January 19, 2017, the applicant identified a program exception to GALL Report AMP XI.M31, "Reactor Vessel Surveillance." The program exception, in part, indicates that the applicant will submit the revised capsule withdrawal schedule separate from the license renewal application, but prior to implementation. In its previous letter dated November 10, 2016 (i.e., response to RAI B.1.34-1), the applicant stated that, for the capsule located at 277°, WCAP-18002-NP suggested a removal time of the reactor vessel refueling outage nearest to 48 EFPY. The applicant also stated that the estimated fluence for the capsule at 48 EFPY is 4.51x10 19 n/cm2 providing a fluence greater than the reactor vessel inner radius fluence calculated for 55 EFPY of 4.32x10 19 n/cm2. Issue: In its response, the applicant did not describe the current EFPY of the unit as baseline information. In addition, the staff notes that, since the Reactor Vessel Surveillance Program is an existing program as required by Appendix H to 10 CFR Part 50, the program establishes and maintains staff-approved reactor vessel surveillance capsule withdrawal schedules for the license term. Given the applicant's program exception that a withdrawal schedule for Capsule | | By letter dated December 8, 2016, the staff issued RAI B.1.34-1a regarding the absence of a staff-approved withdrawal schedule for Capsule 277° (i.e., the surveillance capsule representing the period of extended operation). In its response dated January 19, 2017, the applicant identified a program exception to GALL Report AMP XI.M31, "Reactor Vessel Surveillance." The program exception, in part, indicates that the applicant will submit the revised capsule withdrawal schedule separate from the license renewal application, but prior to implementation. In its previous letter dated November 10, 2016 (i.e., response to RAI B.1.34-1), the applicant stated that, for the capsule located at 277°, WCAP-18002-NP suggested a removal time of the reactor vessel refueling outage nearest to 48 EFPY. The applicant also stated that the estimated fluence for the capsule at 48 EFPY is 4.51x10 19 n/cm 2 providing a fluence greater than the reactor vessel inner radius fluence calculated for 55 EFPY of 4.32x10 19 n/cm 2. Issue: In its response, the applicant did not describe the current EFPY of the unit as baseline information. In addition, the staff notes that, since the Reactor Vessel Surveillance Program is an existing program as required by Appendix H to 10 CFR Part 50, the program establishes and maintains staff-approved reactor vessel surveillance capsule withdrawal schedules for the license term. Given the applicant's program exception that a withdrawal schedule for Capsule |
|
| |
|
| 277° is not submitted as part of the license renewal application, the staff notes that Waterford Unit 3 should submit the capsule withdrawal schedule for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). | | 277° is not submitted as part of the license renewal application, the staff notes that Waterford Unit 3 should submit the capsule withdrawal schedule for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). |
| Request: 1. Provide the current EFPY of the unit. | | Request: 1. Provide the current EFPY of the unit. |
| : 2. Identify a program enhancement to submit a withdrawal schedule for Capsule 277° for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). If such a program enhancement is not necessary, provide justification.}} | | : 2. Identify a program enhancement to submit a withdrawal schedule for Capsule 277° for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). If such a program enhancement is not necessary, provide justification.}} |
Letter Sequence RAI |
---|
|
|
MONTHYEARML16299A2822016-11-10010 November 2016 Scoping and Screening Methodology Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review Project stage: Other ML16315A2352016-11-10010 November 2016 Responses to Request for Additional Information Set 2 Regarding the License Renewal Application Project stage: Response to RAI W3F1-2016-0075, Responses to Request for Additional Information Set 6 Regarding the License Renewal Application2016-12-0707 December 2016 Responses to Request for Additional Information Set 6 Regarding the License Renewal Application Project stage: Response to RAI ML16343A0722016-12-0808 December 2016 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 10 Project stage: RAI W3F1-2016-0077, Responses to Request for Additional Information Set 7 Regarding the License Renewal Application2016-12-15015 December 2016 Responses to Request for Additional Information Set 7 Regarding the License Renewal Application Project stage: Response to RAI ML16351A0452016-12-19019 December 2016 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 11 Project stage: RAI ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application Project stage: RAI ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application Project stage: RAI ML17038A4362017-02-0707 February 2017 Responses to Request for Additional Information for the Environmental Review Project stage: Response to RAI ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 Project stage: RAI ML17054D2392017-02-23023 February 2017 Responses to Request for Additional Information Set 12 Regarding the License Renewal Application Project stage: Response to RAI ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 Project stage: RAI ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 Project stage: RAI ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 Project stage: RAI ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) Project stage: RAI ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos Project stage: RAI ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 Project stage: RAI ML17054C5292017-05-0909 May 2017 Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review Project stage: Other ML17131A1942017-08-24024 August 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval W3F1-2017-0065, License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations2017-11-28028 November 2017 License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations Project stage: Request W3F1-2017-0083, License Renewal Application Supplement Clarification2017-12-0707 December 2017 License Renewal Application Supplement Clarification Project stage: Supplement ML17347A1272017-12-20020 December 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 Project stage: RAI ML18165A1402018-08-16016 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Draft Other ML18165A4242018-08-16016 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Project stage: Draft Other ML18165A1392018-08-16016 August 2018, 20 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Imapct Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Request ML18228A6682018-08-17017 August 2018 Safety Evaluation Report Related to the License Renewal of Waterford Steam Electric Station, Unit 3 Project stage: Approval ML18221A1162018-08-17017 August 2018 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval ML18165A3992018-08-20020 August 2018 FRN Draft SEIS Availability Project stage: Request ML18227A0282018-08-31031 August 2018 NUREG-1437, Dfc, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Supplement 59, - Regarding Waterford Steam Electric Station, Unit 3 Project stage: Acceptance Review ML18309A2242018-11-20020 November 2018 Federal Register Notice - Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Other ML18309A2222018-11-20020 November 2018 Notice of Availability of Final SEIS NUREG-1437 Supplement 59 License Renewal Project stage: Request ML18309A2232018-11-20020 November 2018 Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Other ML18155A5802018-11-28028 November 2018 Issuance of Scoping Summary Report Associated with License Renewal Application Environmental Review (CAC No. MF7493; EPID No. L-2016-LNE-0001) Project stage: Approval ML18309A1752018-12-0303 December 2018 Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 and Response to Comments on the Environmental Impact Statement Project stage: Other ML18275A2152018-12-27027 December 2018 Issuance of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 CAC Nos. MF7492 and MF7493) Project stage: Approval 2017-03-14
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24241A1922024-08-27027 August 2024 October 2024 Emergency Preparedness Program Inspection - Request for Information ML24159A2672024-06-0707 June 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24115A0862024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24115A0882024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email 2024-08-27
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-27027 September 2024 Amended Integrated Inspection Report 05000382/2023004 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 ML24137A3352024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22103A1712022-04-13013 April 2022 LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20086M3852020-04-0101 April 2020 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources Operating W3F1-2020-0014, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System2020-03-20020 March 2020 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System ML20049A4102020-02-20020 February 2020 Request for Additional Information Regarding License Amendment Request to Revise Surveillance Requirement 4.7.6.1.d, Control Room Air Filtration System ML19262H0362019-09-0404 September 2019 Ti 2515/194 Request for Information and Email ML19274D4932019-07-24024 July 2019 Request for Information IR 05000382 2019-003 Occupational Radiation Safety Inspection ML19203A0062019-07-19019 July 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request WF3-RR-19-2: Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19172A0852019-05-24024 May 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request W3-ISI-032: Volumetric Examination Requirements ML19035A0412019-02-0101 February 2019 NRR E-mail Capture - Waterford 3 - Final Request for Information Regarding Relief Request WF3-RR-19-001 for Application of Dissimilar Metal Weld Full Structural Weld Overlay ML19018A0102019-01-28028 January 2019 Request for Additional Information Regarding License Amendment Request for Revision of Technical Specification 3/4.7.4,Ultimate Heat Sink ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18318A4352018-11-14014 November 2018 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information Regarding Request for Alternative to ASME Code Case N-770-2 ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 ML18262A0412018-09-25025 September 2018 Request for Additional Information Regarding License Amendment Request to Revise Section 15.4.3.1 of the Waterford 3 Updated Final Safety Analysis Report to Account for Fuel Misload ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18039A9722018-02-0808 February 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000382/2018002) and Request for Information ML17233A2402017-08-14014 August 2017 NRR E-mail Capture - Draft RAI for Waterford Unit 3 Regarding License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17170A3012017-06-16016 June 2017 Notification of Inspection (NRC Integrated Inspection Report 05000382/2017003) and Request for Information ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 ML17018A3592017-01-26026 January 2017 Requests For Additional Information For The Review Of The Waterford Steam Electric Station, Unit 3, License Renewal Application Set 12 (CAC MF7492.) 2024-06-04
[Table view] |
Text
1 Clark, Phyllis From:Clark, Phyllis Sent: Wednesday, March 01, 2017 7:13 PM To: mchisum@entergy.com Cc: jjarrel@entergy.com; dfrey@entergy.c om; lmurr91@entergy.com; GYOUNG4
@entergy.com; Dlach@entergy.com; ataylo 1@entergy.com; aha rris@entergy.com; Milster, Leia Elizabeth; Ramirez, Frances; Speer, Chris; Wittick, Brian; Morey, Dennis;
RidsNrrDlr Resource; RidsNrrDlrRpb1 Resource; RidsNrrDlrRerb Resource;
RidsNrrDlrRarb Resource; RidsNrrDlrRasb Resource; RidsNrrDlrRsrg Resource; RidsNrrPMWaterford Resource; RidsRgn4Ma ilCenter Resource; Folk, Kevin; Keegan, Elaine; Buford, Angela; Prinaris, Andrew; Wo ng, Albert; Huynh, Alan; Sweat, Tarico; Medoff, James; Gavula, James; Lopez, Juan
- Cuadrado de Jesus, Samuel; Min, Seung; Obadina, Sarah; Sadollah, Mohammad; Rogers, Billy; Brittner, Donald; Fu, Bart; Allik, Brian; Lehman, Bryce; Gardner, William; Thomas, George; Mink, Aaron; Doutt, Clifford; Holston, William; Yoo, Mark; Pulvirenti, April; McIntyre, David; Burnell, Scott; Moreno, Angel; Kennedy, Kriss; Scott, Catherin e; Yoder, Matthew; Chazell, Russell
Subject:
REF: WATERFORD STEAM ELECTRIC ST ATION, UNIT 3, LICENSE RENEWAL APPLICATION - RAI SET 14 (CAC NO. MF7492)
Attachments:
Waterford 3 LRA Final RAI Set 14 (3 1 2017).docx UNITEDSTATESNUCLEARREGULATORYCOMMISSIONWASHINGTON,D.C.205550001 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION - SET 14 (CAC
NO. MF7492)
Dear Mr. Chisum:
By letter dated March 23, 2016, Entergy Operations, Inc. submitted an application pursuant to Title 10 of the
Code of Federal Regulations Part 54, to renew the operating license NPF-38 for Waterford Steam Electric Station, Unit 3. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing the information contained in the license renewal application and has identified areas where additional information is needed to complete the review.
The enclosed requests for additional information were discussed with Ms. Leia Milster and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.
Sincerely,
2 Phyllis Clark Phyllis Clark, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation
Docket No. 50-382
Enclosure:
As stated
cc: Listserv
ADAMS Accession No.: ML17047A585 *via email OFFICE PM:RPB1:DLR BC:RPRB:DLR Acting BC:RPB1:DLR PM:RPB1:DLR NAME PClark DMorey* RChazell* PClark DATE 2/16/2017 3/1/2017 3/1/2017 3/1/2017 WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION - SET 14 (CAC NO. MF7492)
RAI B.1.34-1b
Background:
By letter dated December 8, 2016, the staff issued RAI B.1.34-1a regarding the absence of a staff-approved withdrawal schedule for Capsule 277° (i.e., the surveillance capsule representing the period of extended operation). In its response dated January 19, 2017, the applicant identified a program exception to GALL Report AMP XI.M31, "Reactor Vessel Surveillance." The program exception, in part, indicates that the applicant will submit the revised capsule withdrawal schedule separate from the license renewal application, but prior to implementation. In its previous letter dated November 10, 2016 (i.e., response to RAI B.1.34-1), the applicant stated that, for the capsule located at 277°, WCAP-18002-NP suggested a removal time of the reactor vessel refueling outage nearest to 48 EFPY. The applicant also stated that the estimated fluence for the capsule at 48 EFPY is 4.51x10 19 n/cm 2 providing a fluence greater than the reactor vessel inner radius fluence calculated for 55 EFPY of 4.32x10 19 n/cm 2. Issue: In its response, the applicant did not describe the current EFPY of the unit as baseline information. In addition, the staff notes that, since the Reactor Vessel Surveillance Program is an existing program as required by Appendix H to 10 CFR Part 50, the program establishes and maintains staff-approved reactor vessel surveillance capsule withdrawal schedules for the license term. Given the applicant's program exception that a withdrawal schedule for Capsule
277° is not submitted as part of the license renewal application, the staff notes that Waterford Unit 3 should submit the capsule withdrawal schedule for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license).
Request: 1. Provide the current EFPY of the unit.
- 2. Identify a program enhancement to submit a withdrawal schedule for Capsule 277° for staff's review and approval (in accordance with 10 CFR Part 50, Appendix H) within a specific time period following the receipt of a renewed license (e.g., within 1 year following the receipt of a renewed license). If such a program enhancement is not necessary, provide justification.