Letter Sequence RAI |
---|
|
|
MONTHYEARML16299A2822016-11-10010 November 2016 Scoping and Screening Methodology Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review Project stage: Other ML16315A2352016-11-10010 November 2016 Responses to Request for Additional Information Set 2 Regarding the License Renewal Application Project stage: Response to RAI W3F1-2016-0075, Responses to Request for Additional Information Set 6 Regarding the License Renewal Application2016-12-0707 December 2016 Responses to Request for Additional Information Set 6 Regarding the License Renewal Application Project stage: Response to RAI ML16343A0722016-12-0808 December 2016 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 10 Project stage: RAI W3F1-2016-0077, Responses to Request for Additional Information Set 7 Regarding the License Renewal Application2016-12-15015 December 2016 Responses to Request for Additional Information Set 7 Regarding the License Renewal Application Project stage: Response to RAI ML16351A0452016-12-19019 December 2016 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 11 Project stage: RAI ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application Project stage: RAI ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application Project stage: RAI ML17038A4362017-02-0707 February 2017 Responses to Request for Additional Information for the Environmental Review Project stage: Response to RAI ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 Project stage: RAI ML17054D2392017-02-23023 February 2017 Responses to Request for Additional Information Set 12 Regarding the License Renewal Application Project stage: Response to RAI ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 Project stage: RAI ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 Project stage: RAI ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 Project stage: RAI ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) Project stage: RAI ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos Project stage: RAI ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 Project stage: RAI ML17054C5292017-05-0909 May 2017 Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review Project stage: Other ML17131A1942017-08-24024 August 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval W3F1-2017-0065, License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations2017-11-28028 November 2017 License Amendment Request for Use of RAPTOR-M3G Code for Neutron Fluence Calculations Project stage: Request W3F1-2017-0083, License Renewal Application Supplement Clarification2017-12-0707 December 2017 License Renewal Application Supplement Clarification Project stage: Supplement ML17347A1272017-12-20020 December 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 Project stage: RAI ML18165A1402018-08-16016 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Draft Other ML18165A4242018-08-16016 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford Project stage: Draft Other ML18165A1392018-08-16016 August 2018, 20 August 2018 Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Imapct Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Request ML18228A6682018-08-17017 August 2018 Safety Evaluation Report Related to the License Renewal of Waterford Steam Electric Station, Unit 3 Project stage: Approval ML18221A1162018-08-17017 August 2018 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) Project stage: Approval ML18165A3992018-08-20020 August 2018 FRN Draft SEIS Availability Project stage: Request ML18227A0282018-08-31031 August 2018 NUREG-1437, Dfc, Suppl. 59, Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Supplement 59, - Regarding Waterford Steam Electric Station, Unit 3 Project stage: Acceptance Review ML18309A2242018-11-20020 November 2018 Federal Register Notice - Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Other ML18309A2222018-11-20020 November 2018 Notice of Availability of Final SEIS NUREG-1437 Supplement 59 License Renewal Project stage: Request ML18309A2232018-11-20020 November 2018 Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 Project stage: Other ML18155A5802018-11-28028 November 2018 Issuance of Scoping Summary Report Associated with License Renewal Application Environmental Review (CAC No. MF7493; EPID No. L-2016-LNE-0001) Project stage: Approval ML18309A1752018-12-0303 December 2018 Notice of Availability of the Final Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 and Response to Comments on the Environmental Impact Statement Project stage: Other ML18275A2152018-12-27027 December 2018 Issuance of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 CAC Nos. MF7492 and MF7493) Project stage: Approval 2017-03-14
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20239B0552020-08-26026 August 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 Digital Upgrade LAR ML20197A3122020-07-14014 July 2020 NRR E-mail Capture - NRC Notification of State of Louisiana Re. Waterford Steam Electric Station License Amendments - Changes to Technical Specifications ML20191A0172020-06-26026 June 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 EAL Scheme Change LAR ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) 2023-04-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22103A1712022-04-13013 April 2022 LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20086M3852020-04-0101 April 2020 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources Operating W3F1-2020-0014, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System2020-03-20020 March 2020 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System ML20049A4102020-02-20020 February 2020 Request for Additional Information Regarding License Amendment Request to Revise Surveillance Requirement 4.7.6.1.d, Control Room Air Filtration System ML19262H0362019-09-0404 September 2019 Ti 2515/194 Request for Information and Email ML19274D4932019-07-24024 July 2019 Request for Information IR 05000382 2019-003 Occupational Radiation Safety Inspection ML19203A0062019-07-19019 July 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request WF3-RR-19-2: Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19172A0852019-05-24024 May 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request W3-ISI-032: Volumetric Examination Requirements ML19035A0412019-02-0101 February 2019 NRR E-mail Capture - Waterford 3 - Final Request for Information Regarding Relief Request WF3-RR-19-001 for Application of Dissimilar Metal Weld Full Structural Weld Overlay ML19018A0102019-01-28028 January 2019 Request for Additional Information Regarding License Amendment Request for Revision of Technical Specification 3/4.7.4,Ultimate Heat Sink ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18318A4352018-11-14014 November 2018 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information Regarding Request for Alternative to ASME Code Case N-770-2 ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 ML18262A0412018-09-25025 September 2018 Request for Additional Information Regarding License Amendment Request to Revise Section 15.4.3.1 of the Waterford 3 Updated Final Safety Analysis Report to Account for Fuel Misload ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18039A9722018-02-0808 February 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000382/2018002) and Request for Information ML17233A2402017-08-14014 August 2017 NRR E-mail Capture - Draft RAI for Waterford Unit 3 Regarding License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17170A3012017-06-16016 June 2017 Notification of Inspection (NRC Integrated Inspection Report 05000382/2017003) and Request for Information ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 ML17018A3592017-01-26026 January 2017 Requests For Additional Information For The Review Of The Waterford Steam Electric Station, Unit 3, License Renewal Application Set 12 (CAC MF7492.) ML16354A1052016-12-27027 December 2016 RAI License Amendment Request to Revise TS 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Feature Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program ML16356A5942016-12-19019 December 2016 NRR E-mail Capture - MF8325 Draft RAIs Regarding the License Amendment Request to Revise the Table Notation for Table 4.3-2, ESFAS Surveillance Requirements 2023-07-10
[Table view] |
Text
NRR-DMPSPEm Resource From: Clark, Phyllis Sent: Monday, March 26, 2018 1:59 PM To: JDinelli@entergy.com Cc: jjarrel@entergy.com; dfrey@entergy.com; GYOUNG4@entergy.com; Dlach@entergy.com; aharris@entergy.com; Jlaque@entergy.com; Ramirez, Frances; Speer, Chris; RidsRgn4MailCenter Resource; RidsNrrDmlr Resource; RidsNrrDmlrMrpb Resource; RidsNrrPMWaterford Resource; Keegan, Elaine; James, Lois; Medoff, James; Min, Seung; Pulvirenti, April; McIntyre, David; Burnell, Scott; Moreno, Angel; Kennedy, Kriss; Scott, Catherine; Patel, Amrit; Anderson, Shaun; Alley, David; Ruffin, Steve; Oesterle, Eric
Subject:
REF: WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION - RAI SET 18 (CAC NO. MF7492)
Attachments: Waterford 3 LRA Draft RAI Set 18 Final.docx UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. John C. Dinelli Site Vice President Entergy Operations, Inc.
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION - SET 18 (CAC NO. MF7492)
Dear Mr. Dinelli:
By letter dated November 28, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17332A898), Entergy Operations, Inc. (Entergy) submitted a license amendment request for Waterford Unit 3 (Waterford 3). By letter dated December 7, 2017 (ADAMS Accession No. ML17341B295),
Entergy clarified that Attachment 3 of this submittal was a supplement to their license renewal application (LRA), which was submitted by letter dated March 23, 2016 (ADAMS Accession No. ML16088A324). The LRA is pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating license NPF-38 for Waterford Steam Electric Station, Unit 3. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing the information contained in the license renewal application and the supplement and has identified areas where additional information is needed to complete the review.
The enclosed requests for additional information were discussed with Mr. Alan Harris and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-6447 or by e-mail at Phyllis.Clark@nrc.gov.
1
2 3
Docket No. 50-382
Enclosure:
As stated cc: Listserv
- via email OFFICE PM:MENB:DLMR BC:DSS:SNPB BC:MRPB:DLMR PM:MENB:DLMR 4
NAME PClark *SAnderson *EOesterle PClark DATE 3/15/2018 3/15/2018 3/15/2018 3/26/2018 5
Hearing Identifier: NRR_DMPS Email Number: 262 Mail Envelope Properties (BN7PR09MB2612D4B5849593251B6B3E14F7AD0)
Subject:
REF: WATERFORD STEAM ELECTRIC STATION, UNIT 3, LICENSE RENEWAL APPLICATION - RAI SET 18 (CAC NO. MF7492)
Sent Date: 3/26/2018 1:59:08 PM Received Date: 3/26/2018 1:59:14 PM From: Clark, Phyllis Created By: Phyllis.Clark@nrc.gov Recipients:
"jjarrel@entergy.com" <jjarrel@entergy.com>
Tracking Status: None "dfrey@entergy.com" <dfrey@entergy.com>
Tracking Status: None "GYOUNG4@entergy.com" <GYOUNG4@entergy.com>
Tracking Status: None "Dlach@entergy.com" <Dlach@entergy.com>
Tracking Status: None "aharris@entergy.com" <aharris@entergy.com>
Tracking Status: None "Jlaque@entergy.com" <Jlaque@entergy.com>
Tracking Status: None "Ramirez, Frances" <Frances.Ramirez@nrc.gov>
Tracking Status: None "Speer, Chris" <Chris.Speer@nrc.gov>
Tracking Status: None "RidsRgn4MailCenter Resource" <RidsRgn4MailCenter.Resource@nrc.gov>
Tracking Status: None "RidsNrrDmlr Resource" <RidsNrrDmlr.Resource@nrc.gov>
Tracking Status: None "RidsNrrDmlrMrpb Resource" <RidsNrrDmlrMrpb.Resource@nrc.gov>
Tracking Status: None "RidsNrrPMWaterford Resource" <RidsNrrPMWaterford.Resource@nrc.gov>
Tracking Status: None "Keegan, Elaine" <Elaine.Keegan@nrc.gov>
Tracking Status: None "James, Lois" <Lois.James@nrc.gov>
Tracking Status: None "Medoff, James" <James.Medoff@nrc.gov>
Tracking Status: None "Min, Seung" <Seung.Min@nrc.gov>
Tracking Status: None "Pulvirenti, April" <April.Pulvirenti@nrc.gov>
Tracking Status: None "McIntyre, David" <David.McIntyre@nrc.gov>
Tracking Status: None "Burnell, Scott" <Scott.Burnell@nrc.gov>
Tracking Status: None "Moreno, Angel" <Angel.Moreno@nrc.gov>
Tracking Status: None
"Kennedy, Kriss" <Kriss.Kennedy@nrc.gov>
Tracking Status: None "Scott, Catherine" <Catherine.Scott@nrc.gov>
Tracking Status: None "Patel, Amrit" <Amrit.Patel@nrc.gov>
Tracking Status: None "Anderson, Shaun" <Shaun.Anderson@nrc.gov>
Tracking Status: None "Alley, David" <David.Alley@nrc.gov>
Tracking Status: None "Ruffin, Steve" <Steve.Ruffin@nrc.gov>
Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov>
Tracking Status: None "JDinelli@entergy.com" <JDinelli@entergy.com>
Tracking Status: None Post Office: BN7PR09MB2612.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2038 3/26/2018 1:59:14 PM image001.png 21272 Waterford 3 LRA Draft RAI Set 18 Final.docx 196212 image002.png 9221 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION - SET 18 (CAC NO. MF7492)
RAI 4.2.1-2:
Background
By letter dated November 28, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17332A898), Entergy Operations, Inc. (Entergy) submitted a license amendment request for Waterford Unit 3 (Waterford 3). By letter dated December 7, 2017 (ADAMS Accession No. ML17341B295), Entergy clarified that Attachment 3 of this submittal was a supplement to their license renewal application (LRA), which was submitted by letter dated March 23, 2016 (ADAMS Accession No. ML16088A324). The NRC staff has reviewed the information in Attachment 3 of the November 28, 2017 submittal and determined that additional information is required in order to complete its review of the LRA supplement.
Issue Regulatory Guide (RG) 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, describes methods and assumptions acceptable to the U.S. Nuclear Regulatory Commission (NRC) staff for determining reactor pressure vessel (RPV) neutron fluence with respect to the General Design Criteria (GDC) contained in Appendix A of 10 CFR
- 50. In consideration of the guidance set forth in RG 1.190, GDC 14, 30, and 31 are applicable.
In addition to uncertainty quantification related to use of RAPTOR-M3G for reactor RPV fluence evaluations, Attachment 3 contains Section 3.1, Validation by Comparison to Additional Operating Power Reactors, which provides support for the claim that RAPTOR-M3G calculations produce fluence values that meet the calculational uncertainty criterion specified in RG 1.190, Regulatory Position 1.4.3.
Section 3.1 states:
However, ex-vessel dosimetry off-midplane capsules are axially positioned near the ends of the active fuel. These dosimeters provide a comparison of measurement and calculation in an area of steep flux gradients which are highly dependent upon the axial power distribution. While not located at the nozzles themselves, these off-midplane capsules provide assurance that the flux gradients which characterize the nozzle region are being modeled appropriately.
Data from Westinghouses ex-vessel neutron dosimetry (EVND) program has been shown to span from approximately 5 to 9 feet above the core midplane - a relatively wide range considering the change in flux gradients and magnitude of flux change in this 5 to 9 foot span.1 Note that 5 and 9 feet above the core midplane corresponds to approximately 132 and 180 inches, respectively in Figure 12, which shows actual PWR RPV neutron fluence profiles; corresponding regions for Waterford 3 are shown in Figure 2.
1 See WCAP-18100-NP (ADAMS Accession No. ML16130A645).
2 From TLR-RES_DE_CIB-2013-01 (ADAMS Accession No. ML14318A177)
Figure 1: PWR RPV neutron fluence profiles.
Figure 2: Waterford 3 Reactor Pressure Vessel Projected Fast Neutron (E > 1.0 MeV) Fluence at 60 EFPY.
The applicant does not specifically identify where the off-midplane capsules are located in relation to near the ends of the active fuel for Waterford 3 (e.g., this could mean just below the
top end of the active fuel). Considering that specific locations of off-midplane capsules have not been provided, especially in relation to the upper-to-intermediate shell circumferential weld, which has the 55-EFPY adjusted reference temperature almost equivalent to that of the limiting beltline material, the NRC staff cannot determine whether the off-midplane capsules are actually providing the intended validation for this area of steep flux gradients.
Request a) Indicate the distance relative to the core midplane for each of the 44 EVND off-midplane capsules corresponding to Table 19 in Attachment 3 so that the NRC staff can verify that the data labeled as off-midplane is actually applicable to the above top of active fuel region (or area of steep flux gradients) being qualified. Include valid data not in the set of 44 that is at approximately 9 feet above the core midplane (e.g., Capsule ID BC, BE, and BG listed in Table 3-1 of WCAP-18100-NP).
b) Provide summary tables with individual reaction measurement-to-calculated (M/C) and best-estimate-to-calculated (BE/C) ratios and fluence rate (E > 1 MeV) BE/C ratios (e.g.,
Table C-1 of WCAP-18100-NP) for the subset of EVND capsules that correspond to the region nearest to the upper-to-intermediate shell circumferential weld so that the NRC staff can verify that the fluence calculational methodology used produces results at the upper-to-intermediate shell circumferential weld that remain within the calculational uncertainty allowance prescribed in RG 1.190, Regulatory Position 1.4.3.