NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program
ML24159A267
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/07/2024
From: James Drake
NRC/NRR/DORL/LPL4
To: Twarog J
Entergy Nuclear Operations
References
Download: ML24159A267 (3)


Text

From:

Jason Drake Sent:

Friday, June 7, 2024 9:38 AM To:

Twarog, John R; Couture III, Philip; Mahan, Cecil; Peak, Monica Renee Cc:

Jennie Rankin

Subject:

NRC NOTICE OF ACCEPTANCE: Waterford Steam Electric Station, Unit 3, LAR to Modify SRs in support of SFCP By letter dated May 8, 2024, Entergy submitted a Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program, for Waterford Steam Electric Station, Unit 3 (ML24129A039). The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this proposed alternative. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of public health and safety and the environment.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review by March 1, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Jason Drake Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8378

Hearing Identifier:

NRR_DRMA Email Number:

2516 Mail Envelope Properties (MN2PR09MB58035F89E09B9BCD1BCBD75BFBFB2)

Subject:

NRC NOTICE OF ACCEPTANCE Waterford Steam Electric Station, Unit 3, LAR to Modify SRs in support of SFCP Sent Date:

6/7/2024 9:37:37 AM Received Date:

6/7/2024 9:37:00 AM From:

Jason Drake Created By:

Jason.Drake@nrc.gov Recipients:

"Jennie Rankin" <Jennivine.Rankin@nrc.gov>

Tracking Status: None "Twarog, John R" <jtwarog@entergy.com>

Tracking Status: None "Couture III, Philip" <pcoutur@entergy.com>

Tracking Status: None "Mahan, Cecil" <cmahan@entergy.com>

Tracking Status: None "Peak, Monica Renee" <mpeak1@entergy.com>

Tracking Status: None Post Office:

MN2PR09MB5803.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2631 6/7/2024 9:37:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: