Letter Sequence RAI |
---|
EPID:L-2018-LLA-0112, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components (Approved, Closed) |
|
MONTHYEARW3F1-2018-0014, License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-04-12012 April 2018 License Amendment Request for Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Request ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components Project stage: Acceptance Review W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components2018-06-13013 June 2018 Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Supplement ML18178A2932018-06-28028 June 2018 Acceptance of Requested Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Internal Components Project stage: Acceptance Review ML18212A1672018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 2/26/18, Affidavit Executed by James Gresham, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18212A1602018-08-15015 August 2018 Request for Withholding Information from Public Disclosure - 6/13/18 Affidavit Executed by Paul A. Russ, Westinghouse Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 Project stage: Draft RAI ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Meeting ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0002, (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across2019-01-19019 January 2019 (Waterford 3) - Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across Project stage: Request ML19046A1552019-02-19019 February 2019 Request for Withholding Information from Public Disclosure, 1/8/19 Affidavit Executed by Korey L. Hosack, Westinghouse Electric Company Related to Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: RAI W3F1-2019-0040, Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side2019-07-11011 July 2019 Response to U. S. Nuclear Regulatory Commission Second Round Request for Additional Information Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Intern Project stage: Request ML19234A0172019-09-0909 September 2019 Request for Withholding Information from Public Disclosure, 7/3/19 Affidavit Executed by Camille T. Zozula, Westinghouse Electric Company, LLC, Tranflow License Amendment Request Project stage: Withholding Request Acceptance ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components Project stage: Approval 2018-08-15
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22103A1712022-04-13013 April 2022 LAR to Revise TS to Adopt TSTF-505_NRC Request for Additional Information ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21196A5302021-07-19019 July 2021 Wat 2021010 RFI Letter 21N_05 Gap ML21195A0692021-07-13013 July 2021 Staton, Unit 3 - Notification of Digital Instrumentation and Control Modification Inspection and Request for Information ML21125A6522021-05-0606 May 2021 Wat 2021003 Brq RFI- Md, Waterford Steam Electric Station, Unit 3, Notification of Inspection (NRC Inspection Report 05000382/2021003) and Request for Information ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version ML20288A2082020-10-0808 October 2020 8Oct2020 Email - Request for Information (RFI) to Support and Prepare for the Emergency Preparedness (EP) Program Inspection at the Waterford 3 Station Scheduled to Occur the Week of December 7, 2020 ML20289A3502020-10-0505 October 2020 NRR E-mail Capture - NRC Request for Additional Information - WF3 EAL Scheme Change - L-2020-LLA-0122 ML20125A3212020-05-0404 May 2020 WAT2020410 Inspection Document Request ML20086M3852020-04-0101 April 2020 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources Operating W3F1-2020-0014, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System2020-03-20020 March 2020 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding Application for Technical Specification Change to Control Room Air Conditioning System ML20049A4102020-02-20020 February 2020 Request for Additional Information Regarding License Amendment Request to Revise Surveillance Requirement 4.7.6.1.d, Control Room Air Filtration System ML19262H0362019-09-0404 September 2019 Ti 2515/194 Request for Information and Email ML19274D4932019-07-24024 July 2019 Request for Information IR 05000382 2019-003 Occupational Radiation Safety Inspection ML19203A0062019-07-19019 July 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request WF3-RR-19-2: Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19151A6102019-06-0404 June 2019 Non-Proprietary Second Round RAI Regarding License Amendment Request for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19172A0852019-05-24024 May 2019 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information (Rais) Re Relief Request W3-ISI-032: Volumetric Examination Requirements ML19035A0412019-02-0101 February 2019 NRR E-mail Capture - Waterford 3 - Final Request for Information Regarding Relief Request WF3-RR-19-001 for Application of Dissimilar Metal Weld Full Structural Weld Overlay ML19018A0102019-01-28028 January 2019 Request for Additional Information Regarding License Amendment Request for Revision of Technical Specification 3/4.7.4,Ultimate Heat Sink ML18320A0902018-11-26026 November 2018 Request for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18318A4352018-11-14014 November 2018 NRR E-mail Capture - Waterford 3 - Final Request for Additional Information Regarding Request for Alternative to ASME Code Case N-770-2 ML18299A0862018-11-0707 November 2018 Draft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9 ML18262A0412018-09-25025 September 2018 Request for Additional Information Regarding License Amendment Request to Revise Section 15.4.3.1 of the Waterford 3 Updated Final Safety Analysis Report to Account for Fuel Misload ML18145A2652018-06-0101 June 2018 Supplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components ML18085A6942018-03-26026 March 2018 Ref: Waterford Steam Electric Station, Unit 3, License Renewal Application - RAI Set 18 ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update) ML18039A9722018-02-0808 February 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000382/2018002) and Request for Information ML17233A2402017-08-14014 August 2017 NRR E-mail Capture - Draft RAI for Waterford Unit 3 Regarding License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17170A3012017-06-16016 June 2017 Notification of Inspection (NRC Integrated Inspection Report 05000382/2017003) and Request for Information ML17101A4432017-04-17017 April 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 17 ML17086A5852017-03-28028 March 2017 Request for Additional Information for the Environmental Review of Waterford 3 ML17072A0102017-03-14014 March 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application Set - 15 ML17272A3352017-03-0101 March 2017 Request for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 14 ML17040A5382017-02-14014 February 2017 Requests for Additional Information for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application - Set 13 ML17018A3592017-01-26026 January 2017 Requests For Additional Information For The Review Of The Waterford Steam Electric Station, Unit 3, License Renewal Application Set 12 (CAC MF7492.) ML16354A1052016-12-27027 December 2016 RAI License Amendment Request to Revise TS 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Feature Actuation System (ESFAS) Subgroup Relays to the Surveillance Frequency Control Program ML16356A5942016-12-19019 December 2016 NRR E-mail Capture - MF8325 Draft RAIs Regarding the License Amendment Request to Revise the Table Notation for Table 4.3-2, ESFAS Surveillance Requirements 2023-07-10
[Table view] |
Text
OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 4, 2019 Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3- SECOND ROUND REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR USE OF THE TRANFLOW CODE FOR DETERMINING PRESSURE DROPS ACROSS THE STEAM GENERATOR SECONDARY SIDE INTERNAL COMPONENTS (EPID L-2018-LLA-0112)
Dear Sir or Madam:
By letter dated April 12, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18106A074), Entergy Operations Inc. (the licensee) submitted a license amendment request to revise the Waterford Steam Electric Station, Unit 3 Updated Final Safety Analysis Report (UFSAR) Section 3.9, "Mechanical Systems and Components," to incorporate the TRANFLOW computer code. By letter dated June 1, 2018 (ADAMS Accession No. ML18145A265), the U.S. Nuclear Regulatory Commission (NRC) staff requested supplemental information to the application in order to complete its acceptance review. A response to the request for supplemental information was provided by letter dated June 13, 2018 (ADAMS Accession No. ML18169A275).
Specifically, the license amendment would delete Subsection 3.9.1 .2.2.1.28 of the UFSAR, which describes that the computer code CEFLASH-4A is used to calculate internal loadings following a postulated main steam line break. The deletion of this subsection would clarify that the pressure drops across the steam generator secondary side, due to a steam line break accident, are calculated by the TRANFLOW code.
By letter dated November 26, 2018 (ADAMS Accession No. ML18320A090), the NRC staff issued the first round of requests for additional information (RAls ). By letter dated January 19, 2019 (ADAMS Accession No. ML19019A025), the licensee provided a response to the first round RAls. After reviewing the response to the first round RAls, the staff has determined that additional information, that is, a second round of RAls, is required to complete its review. The additional information needed to complete the review is delineated in the enclosure to this letter. to this letter contains Proprietary information. When separated from Enclosure 1, this document is DECONTROLLED.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
'." 2-The NRC's RAI is enclosed. The NRC staff has determined that the RAI contains proprietary information pursuant to Title 10 of the Code of Federal Regulations ( 10 CFR) Section 2.390, Public inspections, exemptions, requests for withholding." Proprietary information (Enclosure 1) is indicated by bold text enclosed within ((double brackets)). Accordingly, the NRC staff has prepared a redacted publicly available non-proprietary version of the RAI (Enclosure 2).
During a teleconference, which was held with Maria Zamber and others of your staff on May 29, 2019, it was agreed that a response would be provided within 45 days after the date of this letter. Please note that, if you do not respond to this letter by the agreed-upon date or provide an acceptable alternate date in writing, we may deny your application for amendment under the provisions of 10 CFR 2.108, "Denial of application for failure to supply information."
If you have any questions, please contact me at 301-415-1390 or via e-mail at April. Pulvirenti@nrc.gov.
Sincerely, IRA/
April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. RAI (Proprietary)
- 2. RAI (Non-Proprietary) cc w/o Enclosure 1: Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION
ENCLOSURE 2 (NON PROPRIETARY}
NON-PROPRIETARY REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST REGARDING THE REVISION OF UFSAR SECTION 3.9 ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382
OFFICIAL USE ONLY PROPRIETARY INFORMATION REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST REGARDING THE REVISION OF UFSAR SECTION 3.9 ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382 By letter dated April 12, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18106A074), Entergy Operations Inc. (the licensee) submitted a license amendment request to revise the Waterford Steam Electric Station, Unit 3 (Waterford 3)
Updated Final Safety Analysis Report (UFSAR) Section 3.9, "Mechanical Systems and Components," to incorporate the TRANFLOW computer code. By letter dated June 1, 2018 (ADAMS Accession No. ML18145A265), the U.S. Nuclear Regulatory Commission (NRC) staff requested supplemental information to the application in order to complete its acceptance review. A response to the request for supplemental information was provided by letter dated June 13, 2018 (ADAMS Accession No. ML18169A275).
Specifically, the license amendment would delete Subsection 3.9.1.2.2.1.28 of the UFSAR, which describes that the computer code CEFLASH-4A is used to calculate internal loadings following a postulated main steam line break (MSLB). The deletion of this subsection would clarify that the pressure drops across the steam generator (SG) secondary side, due to a steam line break accident, are calculated by the TRAN FLOW code.
By letter dated November 26, 2018 (ADAMS Accession No. ML18320A090), the NRC staff issued the first round of requests for additional information (RAls ). By letter dated January 19, 2019 (ADAMS Accession No. ML19019A025), the licensee provided a response to the first round RAls. After reviewing the response to the first round RAls, the staff has determined that additional information, that is, a second round of RAls, is required to complete its review. The additional information needed to complete the review is delineated in the enclosure to this letter.
Background
The licensee stated in the first-round RAI that TRANFLOW was used during the evaluation of the Waterford 3 replacement SGs, which were placed into service in 2013. However, the licensee's UFSAR incorrectly stated that CEFLASH-4A was used in the calculation of the pressure drops across the replacement SG secondary side internal components.
This issue was documented in Problem Identification and Resolution Inspection Report 05000382/2016008, dated January 26, 2017 (ADAMS Accession No. ML17026A338), as a Severity Level IV non-cited violation, and was entered into the licensee's corrective action program. The request for review and approval of TRANFLOW's use in this particular application is the licensee's intended resolution of this matter.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION As discussed in Section 3.9.1, Revision 4, "Special Topics for Mechnaical Components," of NUREG-0800, "Standard Review Plan for the Review of Safety analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition," dated December 2016 (ADAMS Accession No. ML16088A068), most of the requirements that are pertinent to this review are contained in Title 10 of the Code of Federal Regulations Part 50, Appendix A, "General Design Criteria
[GDC] for Nuclear Power Plants," specifically:
- Criterion 1, "Quality standards and records,"
- Criterion 2, "Design bases for protection against natural phenomena,"
To demonstrate that the applicable GDC are met, the SG secondary side internal components are analyzed to the standard of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Ill. To reach the conclusion that the TRANFLOW code is acceptable for the intended application, the NRC staff needs to find that it is capable of adequately or conservatively determining the instantaneous pressure drop across the SG secondary side internal components following a break of the MSLB.
The licensee's response to first round RAI 1 provided additional details on the drift flux model thatwas implemented in TRANFLOW following its original NRC approval in 1983. The key equations for the void modeling in the drift flux model were included on pages 5 and 6 of 34 in the RAI response dated January 19, 2019, and the reference provided for the derivation of the model was listed as MPR-663, Revision 0, "TRANFLO: A Computer Program for Transient Thermal Hydraulic Analysis with Drift Flux." The NRC staff also reviewed this document and found that two assumptions were made in the development of TRAN FLOW that may not be acceptable.
Second Round RAI 1 The void correlation chosen for TRAN FLOW and provided on page 5 of the RAI response is discussed in more detail in MPR-663, which references ((
11 as the source for the correlation. ((
11 1 This paper indicates that the void correlation selected for use in TRAN FLOW is only applicable up to superficial steam velocities of 2 meters per second .
The NRC staff expects the superficial steam velocities experienced during a MSLB to be greater than this value. Please provide a justification for why the chosen void correlation is applicable to the conditions seen in a SG following an MSLB and results in an accurate or conservative prediction of SG component pressure drop. Support this justification with sensitivity studies and/or other data as necessary.
))
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION Second Round RAI 2 MPR-663 makes the following assumption in the derivation of the (( )):
(( 11 It is not clear to the NRC staff why this assumption is appropriate, given that it does not appear to be consistent with typical definitions of the (( )). In the reference for the void correlation, (( )), the following relationship appears to have been assumed in the development of Equation 5.12:
(( 11 This is more consistent with the NRC staff's expectation.
Please provide and support a justification for the assumption made in TRAN FLOW.
Demonstrate that the assumptions are sufficiently realistic and provide conservative or accurate results for the prediction of steam generator component pressure drop.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
Proprietary: ML19151A603 Non-Proprietary: ML19151A610 *b>Y e-ma1'Id ated OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SRXB/BC(A)*
NAME APulvirenti PBlechman JBorromeo DATE 6/3/2019 6/3/2019 6/4/2019 OFFICE NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli (BSingal for) APulvirenti DATE 6/4/2019 6/4/2019