ML20238D462: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 33: Line 33:
PALC VERDE, UNIT 1 - CEA GUIDE TUBE WEAD INSPECTION PROGRAM                            !
PALC VERDE, UNIT 1 - CEA GUIDE TUBE WEAD INSPECTION PROGRAM                            !
                                                                                                                                               .{
                                                                                                                                               .{
s By letter dated March 6,1987, you provided the details of the planned CEA                          ;
s By {{letter dated|date=March 6, 1987|text=letter dated March 6,1987}}, you provided the details of the planned CEA                          ;
Guide tube Wear Inspection Program for Palo Verde Unit 1.                                          !
Guide tube Wear Inspection Program for Palo Verde Unit 1.                                          !
We have completed our review of the subject program. Based on that review, we conclude that the sample size, selection method and test.):ethodology presented in the program provide an acceptable basis for conducting such an inspection.
We have completed our review of the subject program. Based on that review, we conclude that the sample size, selection method and test.):ethodology presented in the program provide an acceptable basis for conducting such an inspection.

Revision as of 12:01, 9 March 2021

Ack Receipt of 870306 Ltr Providing Details of Planned CEA Guide Tube Wear Insp Program.Sample Size,Selection Method & Test Methodology Acceptable & Implementation of Program May Proceed.Evaluation of Final Program Results Requested
ML20238D462
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/08/1987
From: Licitra E
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8709110200
Download: ML20238D462 (2)


Text

.

[

y o i

'gpg g 1387 C' DISTRIBUTION c M6cketFilea ACRS (10)

NPC & L PDRs Docket No.: 5p-328 , PD5 Plant File JLee ,  ;

EAligitra j Mr. E. E. Van Brunt, Jr. MDavis '

Executive Vice President LLois Arizona Nuclear Power Plant GHelahan j

l Post Office Box 52034 EJordan ,

) Phoenix, Arizona 85072-2034 , .1Partlow i

Dear Mr. Van Brunt:

\

SUBJECT:

PALC VERDE, UNIT 1 - CEA GUIDE TUBE WEAD INSPECTION PROGRAM  !

.{

s By letter dated March 6,1987, you provided the details of the planned CEA  ;

Guide tube Wear Inspection Program for Palo Verde Unit 1.  !

We have completed our review of the subject program. Based on that review, we conclude that the sample size, selection method and test.):ethodology presented in the program provide an acceptable basis for conducting such an inspection.

Therefore, implementation of the program can proceed. i At the conclusion of the inspection, we request that you provide us with a report which includes your evaluation of the final results.

If you have any questions regarding this let:er, please let me know.

Sincercly, Oririna! *rmi b'F E. ft. UcP.ra E. A. Licitra, Senior Project Manager Projpct Directorate V Division of Reactor Project: - III, IV, Y and Special Projects cc: See next page I

DRSP/gf 6K DRSP/D: DV EAlicitra:cd GWKr,1ghton 9///87 9///87 8709110200 870908 PDR ADOCK 05000328 4 o PDR

a es Mr. E. E. Van Brunt, Jr.L .

& Arizona Nucle.ar. Power. Project. .Palo Verde cc:

Arthur C. Gehr, Esq. Kenneth Berlin, Esq.

Snell & Wilmer Winston & Strawn j 3100 Valley Center Suite 500 1 Phoenix, Arizona' 85073 2550 M Street, NW Mr. James M. Flenner, Chiei' Counsel .

Arizona Corporation Cosnission Ms. Lynne Bernabei 1200 West Washington - Government Accountability Project i Phoenix, Arizona 85007 of the Institute for Policy Studies i

- 1901 Que Street, NW Charles R. Kocher, Esq. Assistant' Washington, DC 20009 Council i James A. Boeletto, Esq.*

Southern California Edison Company. Mr. Ron Rayner -

P. O. Box 800 P. O. Box 1509 Rosemead, California 91770 < Goodyear, AZ 85338 Mr. Mark Ginsberg Mr. Charles B. Brinkman, Manager Energy Director Washington Nuclear Operations l OfficeofEconomicPlapning Combustion Engineering, Inc.

and Development 7910 Woodmont Avenue Suite 1310 1700 West Washington - 5th Floor Bethesda, Maryland 20814 i Phoenix, Arizona 85007 l h Mr. Wayne Shirley Assistant Attorney General

  • Bataan Memorial Building Santa Fe., New Mexico 87503 1 Mr. Jay Ball ' s' O.S. Nuclear Regulator'y Commission P. O. Box 239 <

Arlington, Arizena 85322 Regional Administrator, Region V U. S. Nuclear Regulatory Consission 1450 Maria Lane Suite 210 ,

Walnut Creek, California 94596 i e

i o

b l; _ _ _ ____.______ __________ _ .___:- _ _ _ _