Ack Receipt of Providing Details of Planned CEA Guide Tube Wear Insp Program.Sample Size,Selection Method & Test Methodology Acceptable & Implementation of Program May Proceed.Evaluation of Final Program Results Requested
ML20238D462
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 09/08/1987
From: Licitra E
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8709110200
Download: ML20238D462 (2)


Text

.

[

y o i

'gpg g 1387 C' DISTRIBUTION c M6cketFilea ACRS (10)

NPC & L PDRs Docket No.: 5p-328 , PD5 Plant File JLee ,  ;

EAligitra j Mr. E. E. Van Brunt, Jr. MDavis '

Executive Vice President LLois Arizona Nuclear Power Plant GHelahan j

l Post Office Box 52034 EJordan ,

) Phoenix, Arizona 85072-2034 , .1Partlow i

Dear Mr. Van Brunt:

\

SUBJECT:

PALC VERDE, UNIT 1 - CEA GUIDE TUBE WEAD INSPECTION PROGRAM  !

.{

s By letter dated March 6,1987, you provided the details of the planned CEA  ;

Guide tube Wear Inspection Program for Palo Verde Unit 1.  !

We have completed our review of the subject program. Based on that review, we conclude that the sample size, selection method and test.):ethodology presented in the program provide an acceptable basis for conducting such an inspection.

Therefore, implementation of the program can proceed. i At the conclusion of the inspection, we request that you provide us with a report which includes your evaluation of the final results.

If you have any questions regarding this let:er, please let me know.

Sincercly, Oririna! *rmi b'F E. ft. UcP.ra E. A. Licitra, Senior Project Manager Projpct Directorate V Division of Reactor Project: - III, IV, Y and Special Projects cc: See next page I

DRSP/gf 6K DRSP/D: DV EAlicitra:cd GWKr,1ghton 9///87 9///87 8709110200 870908 PDR ADOCK 05000328 4 o PDR

a es Mr. E. E. Van Brunt, Jr.L .

& Arizona Nucle.ar. Power. Project. .Palo Verde cc:

Arthur C. Gehr, Esq. Kenneth Berlin, Esq.

Snell & Wilmer Winston & Strawn j 3100 Valley Center Suite 500 1 Phoenix, Arizona' 85073 2550 M Street, NW Mr. James M. Flenner, Chiei' Counsel .

Arizona Corporation Cosnission Ms. Lynne Bernabei 1200 West Washington - Government Accountability Project i Phoenix, Arizona 85007 of the Institute for Policy Studies i

- 1901 Que Street, NW Charles R. Kocher, Esq. Assistant' Washington, DC 20009 Council i James A. Boeletto, Esq.*

Southern California Edison Company. Mr. Ron Rayner -

P. O. Box 800 P. O. Box 1509 Rosemead, California 91770 < Goodyear, AZ 85338 Mr. Mark Ginsberg Mr. Charles B. Brinkman, Manager Energy Director Washington Nuclear Operations l OfficeofEconomicPlapning Combustion Engineering, Inc.

and Development 7910 Woodmont Avenue Suite 1310 1700 West Washington - 5th Floor Bethesda, Maryland 20814 i Phoenix, Arizona 85007 l h Mr. Wayne Shirley Assistant Attorney General

  • Bataan Memorial Building Santa Fe., New Mexico 87503 1 Mr. Jay Ball ' s' O.S. Nuclear Regulator'y Commission P. O. Box 239 <

Arlington, Arizena 85322 Regional Administrator, Region V U. S. Nuclear Regulatory Consission 1450 Maria Lane Suite 210 ,

Walnut Creek, California 94596 i e

i o

b l; _ _ _ ____.______ __________ _ .___:- _ _ _ _