{{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50 244 October 6 1980 COMPLETED BY Andrew E.McN a TELF PHONE l(315)524-446 Ext.05, 93 I~Unit Name: GINNA STATION UN 2.Reporting Period: Se tember 1980 3.Licensed Thermal Power (MWt): 1520 4.Namcplatc Rating (Gross hlWe): 5~Design I',lectrical Rating (Nct hlWe): 480 70 Notes The Unit operated at 100%reactor power levelfor the majority of the report period, with a few exceptions detailed on Page 4.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Rcport, Give Reasons: 9.Power Level to Which Restricted, If Any (Net hIWe): 10.Reasons For Restrictions, If Any.'his hlonth Yr.-to-Date Cumulative 6 575 72,954.02 ,i 720 1 621.57 0 31 227,585 351 781 29 577 832 334 356 74.87/68.49'8.49%
{{#Wiki_filter:OPERATING DATA REPORT DOCKET NO       50 244 October   6     1980 COMPLETED BY Andrew E. McN             a TELF PHONE       l(315) 524- 446 OPERATING STATUS                                                                  Ext. 05, 93 I ~ Unit Name:     GINNA STATION UN                                   Notes The Unit operated at
11.Hours In Reporting Period 720 95 087 I'2.Number of Hours Reactor Was Critical 5,274.25 13.Reactor Rescrvc Shutdown Hours 0 14.Hours Gcncrator On-Linc-780--15.Unit Reserve Shutdown Hours-*-.*.~1 8 17.Gross Electrical Energy Generated (MWH)18.Nct Electrical Energy Gcncratcd (hlWH)2 416 284 19.Unit Service I'actor 100%79.62%20.Unit Availability Factor-1$E-~~80~87 22.Unit Capacity Factor (Using DkR Net)98.8%78.19%23.Unit Forced Outage Rate 0 0 24.Shutdowns Schcdulcd Over Next 6 hlonths (Type, Date and Duration of Each): Scheduled:
: 2. Reporting Period:     Se tember 1980                                 100% reactor power level
Steam Generator Ins ection and Modification
: 3. Licensed Thermal Power (MWt):         1520                           for the majority of the
-10 25 thru ll 26 25.If Shut Down At End Of Rcport,Period, Estimated Date of Startup: 26.Units In Test Status (Prior to.Commercial Operation):
: 4. Namcplatc Rating (Gross hlWe):                                       report period, with a few 5 Design I',lectrical Rating (Nct hlWe):
INITIAL CRITICALITY INITIAL ELECTRICITY COMhlERCIAL OPERATION j,>>CuaaQative total cormencing January 1, 1975 s 0 z0230~w Forecast Achieved 49 8d tRav 1/78) n~I AVERAGE DAlLY UNIT POWER.LEVEL DOCKET NO..50 244 UNIT Nl@irma Statio DATE COMPLETED BY Andrew E.McNamara TELEPHONE l(315)524-4446 MONTH Se<ember 1980 DAY AVERAGE DAILY POWER LEVEL (M We-N et)DAY.AVERAGE DAILY POWER LEVEL (MWe-Net)10 12 13 14 15 16 463 464 463 462 372 461 462 464 465 464 463 467 467 17 18 20 21 22 23 24 25 26 27 28 29 30 31 473 471 72 470 470 470 471 472 473 472 472 473 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.49i67 RKVo e/60 4 I a 4 REPORT MONTH DOCKET NO.SO 244 UNI'I'NAMf.'tl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS 980=COMPLETED BY cC~~An ew E.McN a~1588,-1 515 521-1112 Ext.205, 293 Ho.Date C 0 0~0 C 0 0 Cl 8 89~0 E v 0 4 0 e own a 0 CL l.icensee Event Report 0 Ew-0 0 Vl 0 Vl C 0 ul el 0 0 0 0 U Cause L Corrective Action to Prevent Recurrence No outages or significant pmer reductions to report.1 F: Forced S: Scheduled 49.89 (REV t/78)2 Reason: A-Equipmcnt Failure (Explain)I3-htaintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8: License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 hfethod: 1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit 1-Same Source  
      ~
'A~)  
exceptions detailed on 480                  Page 4.
-4 NARRATIVE  
70
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
: 9. Power Level to Which Restricted,   If Any (Net hIWe):
: 10. Reasons For Restrictions,   If Any.'his hlonth         Yr.-to-Date         Cumulative
: 11. Hours In Reporting Period                             720               6 575                95 087
                                                    -
I'2. Number of Hours Reactor Was Critical             ,i  720                5,274.25             72,954.02 1 621.57
                                                                          ~
: 13. Reactor Rescrvc Shutdown Hours                             0                    0
: 14. Hours Gcncrator On-Linc                                 780
: 15. Unit Reserve Shutdown Hours
                        -*-.*.     ~ 1 8 31 227,585
: 17. Gross   Electrical Energy Generated (MWH)             351 781 334 356            2 416 284          29 577 832
: 18. Nct Electrical Energy Gcncratcd (hlWH)
: 19. Unit Service I'actor                                     100%                 79. 62%             74.87/
: 20. Unit Availability Factor
: 22. Unit Capacity Factor (Using DkR Net)
                                                    ~80 ~87 1$ E
: 98. 8%               78.19%
68.49'8.49%
: 23. Unit Forced Outage Rate                                   0                   0
: 24. Shutdowns Schcdulcd Over Next 6 hlonths (Type, Date and Duration of Each):
Scheduled:       Steam Generator     Ins ection and Modification             10 25 thru   ll 26
: 25. If Shut Down At End Of Rcport,Period, Estimated Date of Startup:
: 26. Units In Test Status (Prior to. Commercial Operation):                     Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COMhlERCIAL OPERATION j,>> CuaaQative       total   cormencing January 1, 1975                                           49 8d   tRav   1/78) s0    z0230~w
 
n ~I AVERAGE DAlLY UNIT POWER. LEVEL DOCKET NO..50 244 UNIT Nl @irma Statio DATE COMPLETED BY Andrew E. McNamara TELEPHONE     l(315) 524-4446 MONTH     Se <ember     1980 DAY AVERAGE DAILY POWER LEVEL                       DAY. AVERAGE DAILY POWER         LEVEL (MWe-N et)                                          (MWe-Net) 17 473 463                               18 464                                               471 20              72 463                               21              470 462                               22 470 372                               23              470 461                               24 471 462                               25              472 10              464                               26             473 27 12              465                                28             472 13              464                                29             472 14              463                                30             473 15              467                                31 16              467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
49i67 RKVo e/60
 
4 I
a 4
 
                                                                            ~
DOCKET NO.         SO 244 UNI'I'NAMf.'tlGinna Station 980=
UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED BY                         cC~~
REPORT MONTH                      1588,        -    An ew E. McN 1 515 521-1112 Ext. 205, 293 a
8 C               89 ~v0                                C 0 ul 0       C 0 E         l.icensee       Ew-         el              Cause  L Corrective 0      4 0                     0 0         0 0 Ho.          Date              0 0                         Event                      0                     Action to
                                  ~        0                                  Vl            0 Cl  e own a        Report  0            0                        Prevent Recurrence Vl 0
U CL No outages   or significant pmer reductions to report.
1                   2                                                3 F: Forced           Reason:                                          hfethod:                          Exhibit G - Instructions S: Scheduled       A-Equipmcnt Failure (Explain)                     1-hlanual                        for Preparation of Data I3-htaintenance or Test                           2-hlanual Scram.                  Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                         4-Other (Explain)                0161)
E-Operator Training 8: License Examination F-Administrative G-Operational Error (Explain) 49.89 (REV t/78)       H-Other (Explain)                                                                   Exhibit 1 - Same Source
 
'A
~ )
 
                                                                              -4 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT Ginna'St ation i DATE October 6 1980 COMPLETED BY Andrew E.McN MONTH Se tember 1 8 TELEPHONE 1(315)524 4446 Ext.05, 293 The reactor power level averaged 100/for the majority of the report anth, with the following exceptions:
OF OPERATING EXPERIENCE DOCKET NO.       0-2 UNIT   Ginna 'St ation     i DATE   October 6     1980 COMPLETED BY Andrew E. McN TELEPHONE   1(315) 524 4446 Ext. 05, 293 MONTH  Se  tember  1 8 The reactor power level averaged 100/ for the majority of the report anth, with the following exceptions:
On 9/7, the reactor power level was reduced to nr 46%to perfoxm Turbine Protective and Control Tests.On 9/8, the reactor power level was reduced to 99/to perfoxm a periodic test on the Auxiliary Feedwater System.On 9/16, the reactor power level was reduced to 9F/, due to a turbine run-back.On 9/25, the reactor power level was reduced to 99/to perfoxm a periodic test on the Auxiliary Feedwater'System.
On 9/7, the reactor power level was reduced to nr 46% to perfoxm Turbine Protective and Control Tests.
40 I2S t1/78)  
On 9/8, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater System.
~, 1l I'lt f>)i(~Ykg Ginna Station Maintenance Report for September, 1980 During September, normal inspections and minor maintenance was performed.
On 9/16, the reactor power level was reduced to 9F/, due to a turbine run-back.
Major safety related maintenance included: Replacement of the reLay for the emergency dieseL generator supply breaker to a safety related 480 volt bus after it failed to tie in to the bus during the monthly periodic test.
On 9/25, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater'System.
0<</f}}
40 I2S t1/78)
 
~,   I' 1l lt f >) i(~ Ykg
 
Ginna Station Maintenance Report for September, 1980 During September, normal inspections and minor maintenance   was performed. Major safety related maintenance included:
Replacement of the reLay for the emergency dieseL generator supply breaker to a safety related 480 volt bus after   it failed to tie in to the bus during the monthly periodic test.
 
  <</
0 f}}

Revision as of 20:51, 29 October 2019

Monthly Operating Rept for Sept 1980
ML17250A692
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/06/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17250A691 List:
References
NUDOCS 8010230382
Download: ML17250A692 (10)


Text

OPERATING DATA REPORT DOCKET NO 50 244 October 6 1980 COMPLETED BY Andrew E. McN a TELF PHONE l(315) 524- 446 OPERATING STATUS Ext. 05, 93 I ~ Unit Name: GINNA STATION UN Notes The Unit operated at

2. Reporting Period: Se tember 1980 100% reactor power level
3. Licensed Thermal Power (MWt): 1520 for the majority of the
4. Namcplatc Rating (Gross hlWe): report period, with a few 5 Design I',lectrical Rating (Nct hlWe):

~

exceptions detailed on 480 Page 4.

70

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net hIWe):
10. Reasons For Restrictions, If Any.'his hlonth Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 6 575 95 087

-

I'2. Number of Hours Reactor Was Critical ,i 720 5,274.25 72,954.02 1 621.57

~

13. Reactor Rescrvc Shutdown Hours 0 0
14. Hours Gcncrator On-Linc 780
15. Unit Reserve Shutdown Hours

-*-.*. ~ 1 8 31 227,585

17. Gross Electrical Energy Generated (MWH) 351 781 334 356 2 416 284 29 577 832
18. Nct Electrical Energy Gcncratcd (hlWH)
19. Unit Service I'actor 100% 79. 62% 74.87/
20. Unit Availability Factor
22. Unit Capacity Factor (Using DkR Net)

~80 ~87 1$ E

98. 8% 78.19%

68.49'8.49%

23. Unit Forced Outage Rate 0 0
24. Shutdowns Schcdulcd Over Next 6 hlonths (Type, Date and Duration of Each):

Scheduled: Steam Generator Ins ection and Modification 10 25 thru ll 26

25. If Shut Down At End Of Rcport,Period, Estimated Date of Startup:
26. Units In Test Status (Prior to. Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhlERCIAL OPERATION j,>> CuaaQative total cormencing January 1, 1975 49 8d tRav 1/78) s0 z0230~w

n ~I AVERAGE DAlLY UNIT POWER. LEVEL DOCKET NO..50 244 UNIT Nl @irma Statio DATE COMPLETED BY Andrew E. McNamara TELEPHONE l(315) 524-4446 MONTH Se <ember 1980 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-N et) (MWe-Net) 17 473 463 18 464 471 20 72 463 21 470 462 22 470 372 23 470 461 24 471 462 25 472 10 464 26 473 27 12 465 28 472 13 464 29 472 14 463 30 473 15 467 31 16 467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49i67 RKVo e/60

4 I

a 4

~

DOCKET NO. SO 244 UNI'I'NAMf.'tlGinna Station 980=

UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED BY cC~~

REPORT MONTH 1588, - An ew E. McN 1 515 521-1112 Ext. 205, 293 a

8 C 89 ~v0 C 0 ul 0 C 0 E l.icensee Ew- el Cause L Corrective 0 4 0 0 0 0 0 Ho. Date 0 0 Event 0 Action to

~ 0 Vl 0 Cl e own a Report 0 0 Prevent Recurrence Vl 0

U CL No outages or significant pmer reductions to report.

1 2 3 F: Forced Reason: hfethod: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data I3-htaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8: License Examination F-Administrative G-Operational Error (Explain) 49.89 (REV t/78) H-Other (Explain) Exhibit 1 - Same Source

'A

~ )

-4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT Ginna 'St ation i DATE October 6 1980 COMPLETED BY Andrew E. McN TELEPHONE 1(315) 524 4446 Ext. 05, 293 MONTH Se tember 1 8 The reactor power level averaged 100/ for the majority of the report anth, with the following exceptions:

On 9/7, the reactor power level was reduced to nr 46% to perfoxm Turbine Protective and Control Tests.

On 9/8, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater System.

On 9/16, the reactor power level was reduced to 9F/, due to a turbine run-back.

On 9/25, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater'System.

40 I2S t1/78)

~, I' 1l lt f >) i(~ Ykg

Ginna Station Maintenance Report for September, 1980 During September, normal inspections and minor maintenance was performed. Major safety related maintenance included:

Replacement of the reLay for the emergency dieseL generator supply breaker to a safety related 480 volt bus after it failed to tie in to the bus during the monthly periodic test.

<</

0 f