OPERATING DATA REPORT DOCKET NO 50 244 October 6 1980 COMPLETED BY Andrew E. McN a TELF PHONE l(315) 524- 446 OPERATING STATUS Ext. 05, 93 I ~ Unit Name: GINNA STATION UN Notes The Unit operated at

2. Reporting Period: Se tember 1980 100% reactor power level
3. Licensed Thermal Power (MWt): 1520 for the majority of the
4. Namcplatc Rating (Gross hlWe): report period, with a few 5 Design I',lectrical Rating (Nct hlWe):

~

exceptions detailed on 480 Page 4.

70

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net hIWe):
10. Reasons For Restrictions, If Any.'his hlonth Yr.-to-Date Cumulative
11. Hours In Reporting Period 720 6 575 95 087 I'2. Number of Hours Reactor Was Critical ,i 720 5,274.25 72,954.02 1 621.57

~

13. Reactor Rescrvc Shutdown Hours 0 0
14. Hours Gcncrator On-Linc 780
15. Unit Reserve Shutdown Hours

-*-.*. ~ 1 8 31 227,585

17. Gross Electrical Energy Generated (MWH) 351 781 334 356 2 416 284 29 577 832
18. Nct Electrical Energy Gcncratcd (hlWH)
19. Unit Service I'actor 100% 79. 62% 74.87/
20. Unit Availability Factor
22. Unit Capacity Factor (Using DkR Net)

~80 ~87 1$ E

98. 8% 78.19%

68.49'8.49%

23. Unit Forced Outage Rate 0 0
24. Shutdowns Schcdulcd Over Next 6 hlonths (Type, Date and Duration of Each):

Scheduled: Steam Generator Ins ection and Modification 10 25 thru ll 26

25. If Shut Down At End Of Rcport,Period, Estimated Date of Startup:
26. Units In Test Status (Prior to. Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhlERCIAL OPERATION j,>> CuaaQative total cormencing January 1, 1975 49 8d tRav 1/78) s0 z0230~w

n ~I AVERAGE DAlLY UNIT POWER. LEVEL DOCKET NO..50 244 UNIT Nl @irma Statio DATE COMPLETED BY Andrew E. McNamara TELEPHONE l(315) 524-4446 MONTH Se <ember 1980 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL (MWe-N et) (MWe-Net) 17 473 463 18 464 471 20 72 463 21 470 462 22 470 372 23 470 461 24 471 462 25 472 10 464 26 473 27 12 465 28 472 13 464 29 472 14 463 30 473 15 467 31 16 467 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49i67 RKVo e/60

4 I

a 4

~

DOCKET NO. SO 244 UNI'I'NAMf.'tlGinna Station 980=

UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED BY cC~~

REPORT MONTH 1588, - An ew E. McN 1 515 521-1112 Ext. 205, 293 a

8 C 89 ~v0 C 0 ul 0 C 0 E l.icensee Ew- el Cause L Corrective 0 4 0 0 0 0 0 Ho. Date 0 0 Event 0 Action to

~ 0 Vl 0 Cl e own a Report 0 0 Prevent Recurrence Vl 0

U CL No outages or significant pmer reductions to report.

1 2 3 F: Forced Reason: hfethod: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data I3-htaintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8: License Examination F-Administrative G-Operational Error (Explain) 49.89 (REV t/78) H-Other (Explain) Exhibit 1 - Same Source

'A

~ )

-4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT Ginna 'St ation i DATE October 6 1980 COMPLETED BY Andrew E. McN TELEPHONE 1(315) 524 4446 Ext. 05, 293 MONTH Se tember 1 8 The reactor power level averaged 100/ for the majority of the report anth, with the following exceptions:

On 9/7, the reactor power level was reduced to nr 46% to perfoxm Turbine Protective and Control Tests.

On 9/8, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater System.

On 9/16, the reactor power level was reduced to 9F/, due to a turbine run-back.

On 9/25, the reactor power level was reduced to 99/ to perfoxm a periodic test on the Auxiliary Feedwater'System.

40 I2S t1/78)

~, I' 1l lt f >) i(~ Ykg

Ginna Station Maintenance Report for September, 1980 During September, normal inspections and minor maintenance was performed. Major safety related maintenance included:

Replacement of the reLay for the emergency dieseL generator supply breaker to a safety related 480 volt bus after it failed to tie in to the bus during the monthly periodic test.

<</