{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION 0 89 EAST AVENUE, ROCHESTER, N.Y.14649.0001 7Cl,KPHONC ARL'A cooE 71d 546.2700 GINNA STATION April 18, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION 0 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 7Cl,KPHONC ARL'A cooE 71d 546.2700 GINNA STATION April   18, 1990 US Nuclear Regulatory Commission Document   Control Desk Washington,   DC 20555


==Subject:==
==Subject:==
Monthly Report for March, 1990 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for March, 1990 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244


==Dear Sir:==
==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1990.Very truly yours, Robert C.Mec edy Division Manager Nuclear Production RCM/eeh Attachments cc: Mr.Thomas T.Martin NRC (1)9004230556 900332 PDR ADOCK 05000244 R PDC OPERATING DATA REPORT DOCKET NO.DATE COHPLETED BY 50.244 A r 18 1990 Robert E.Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext.396 1.2~30 4.5.6.7.8.Unit Nano: R.E.GINNA NUCLEAR P(NER PLANT Reporting Period: MARCH 1990 Licensed Thermal Power (HWt): Nameplate Rating (Gross HWe): Design Electrical Rating (Net HWe): Haxinxln Dependable Capacity (Gross We): Haxirljn Dependable Capacity (Net HWe): If Changes Occur in Capacity Ratings (Items 1520 490 470 490 470 Notes: The unit was shutdown on Harch 23 for Annual Re-fueling ard Haintenance.
lt remained shutdown at the end of the report period.Nunber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, lf Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr.-to-Date Cwuiat 1 ve 11.12.13.14~15.16.17.18.19.20.21~22.23.Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWH)Gross Electrical Energy Generated (WH)Net Electrical Energy Generated (WH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Het)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 546.07 545.5 808 550 274 719 261 454 73.32 73.32 74.77 74.77 2 160.0 1 962.07 178 746.45 140 308.21 1 687.55 2 926 224 987 813 194 548 674 64 021 158 940 207'0 758 120 90.81 90.81 92.61 92.61 77.27 77.27 73.81 73.81 6.27 1 961.5 137 802.88 8.5*24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): 25.If Shut Down At End Of Report Period, Estimated Date of Startupr 26.Units In Test Status (Prior to Conmercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERCI AL OPERATION*CUMULATIVE TOTAL COMHENCING JANUARY 1, 1975


AVERAGE DAILY UNIT POWER LEVEL MONTH March 1990 DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE A r'8 1990 COMPLETED BY Robert E.D dge TELEPHONE 1 315 524-4446 ext.396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1~2~3~4~5.6.7~484 484 484 484 484 484 484 17~18'9~20.21~22'3'83 483 482 482 482 475 265 8.9~10.12.13'4.15.16'84 484 484 484 483 484 484 483 483 24.25.26.27'8'9.30.31.-10 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1990.
t'f)O(:Kf'.T NO.SO 244 ljNf'I'NAMf R.E.GINNA NUCLEAR POWER PLANT'NIT SHUTDOWN AND POWER REDUCTIONS
Very  truly  yours, Robert C. Mec edy Division    Manager Nuclear Production RCM/eeh Attachments cc:  Mr. Thomas T. Martin      NRC  (1) 9004230556 900332 PDR  ADOCK 05000244 R                PDC
(:OhfPLETED BY o er REPORT hlONTH MARCH 1990 frpf fQNf;3 1 5-524-4446>-396 Ginna Station Ho.Date c.0 e~0 C 0 0 0 txl Pl I 0I>>0 ocv 0>>0 eon 0 0 Licensee Event Report 4f Ew 0 0 Vl 0 IA C 0 I4l 0 C 0 E 0 0 U O Cause ffI Corrective Action to Prevent Recurrence 90-1 3/23/90 S The unit was shutdown for Annual Refueling and Mainten-ance Outage.The unit remain-ed shutdown at the end of the report period.F: Forced S: Scheduled IIEV.4/85 4949 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)Hither (Explain)hfethod: 1-hfanual 2-hfanual Scram.3-Automatic Scram.4-Other (Explain)Fxhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit 1-Same Source l NARRATIVE  
 
OPERATING DATA REPORT DOCKET NO.      50.244 DATE    A r    18  1990 COHPLETED BY Robert E. Dodge TELEPHONE      315  524-4446 ext. 396 OPERATING STATUS
: 1.      Unit  Nano:  R.E. GINNA  NUCLEAR P(NER PLANT                              Notes:    The  unit was shutdown on 2~      Reporting Period:      MARCH  1990                                                  Harch 23  for Annual Re-30      Licensed Thermal Power (HWt):                  1520                                fueling ard Haintenance.
: 4.      Nameplate Rating (Gross HWe):                  490                                lt  remained shutdown at
: 5.      Design Electrical Rating (Net HWe):            470                                the end of the report
: 6.      Haxinxln Dependable Capacity (Gross We):        490                                period.
: 7.      Haxirljn Dependable Capacity (Net HWe):        470
: 8.      If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
: 9.      Power Level  to Which Restricted, lf Any (Net  MWe):
: 10. Reasons  For Restrictions, If Any:
This Month        Yr.-to-Date            Cwuiat 1 ve
: 11. Hours In Report Period                                                        2 160.0                178 746.45
: 12. Nunber of Hours Reactor Was Critical                      546.07              1 962.07              140 308.21
: 13. Reactor Reserve Shutdown Hours                                                                        1  687.55 14 ~    Hours Generator On-Line                                  545.5              1 961.5                137 802.88 Unit Reserve Shutdown Hours                                                                                      *
                                                                                                '0
: 15.                                                                                                                8.5
: 16. Gross Thermal Energy Generated (HWH)                  808 550            2 926 224              194 548 674
: 17. Gross Electrical Energy Generated (WH)                274 719              987 813              64 021 158
: 18. Net Electrical Energy Generated (WH)                  261 454              940 207                  758 120
: 19. Unit  Service Factor                                      73.32                90.81                    77.27
: 20. Unit  Availability Factor                                  73.32                90.81                    77.27 21 ~    Unit  Capacity Factor (Using  HDC  Het)                    74.77                92.61                    73.81
: 22. Unit  Capacity Factor (Using  DER  Net)                    74.77                92.61                    73.81
: 23. Unit  Forced Outage Rate                                                                                    6.27
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration  of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startupr
: 26. Units In Test Status (Prior to Conmercial Operation):                      Forecast              Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERCI AL OPERATION
*CUMULATIVE TOTAL COMHENCING JANUARY    1, 1975
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-244 DATE A COMPLETED BY r'8 UNIT R.E. Ginna Nuclear Power 1990 Plant Robert E. D dge TELEPHONE 1   315     524-4446   ext. 396 MONTH        March  1990 DAY AVERAGE      DAILY POWER LEVEL          DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                               (MWe-Net) 1~               484                        17    ~
2 3
4
  ~
  ~
  ~
484 484 484 18 20.
                                                  '83
                                                  '9
                                                  ~
483 482 482
: 5.               484                        21 ~             482
: 6.                484                        22               475
                                                  '3 7 ~              484                                        265
: 8.                                           24.              -10
    '84 9 ~              484                       25.
: 10.               484                        26.
484                        27
                                                '8
: 12.              483
                                                '9.
13                484
    '4.
484                        30.
: 15.              483                        31.
16                483 INSTRUCTIONS On     this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
t' f)O(:Kf'.T NO.         SO 244 ljNf'I'NAMf R.E. GINNA NUCLEAR POWER       PLANT'NIT SHUTDOWN AND POWER REDUCTIONS
(:OhfPLETED BY o   er REPORT hlONTH MARCH       1990               frpffQNf; 3 1 5-524     -4446 >-396 Ginna Station Pl I
0 0I >>
c
                                .0 e     C 0
ocv        Licensee        Ew        C C
0 I4l                Cause  ffI Corrective Ho.          Date
                                  ~ 0     0 0>>   0     Event          0 Vl 0       0 0 0                       Action to 0                 Report            0       E txl    eon 0             4f IA          0 U                 Prevent Recurrence 0                                O 90-1         3/23/90 S                                                                   The unit was shutdown for Annual Refueling and Mainten-ance Outage.             The unit remain-ed shutdown at the end of the report period.
F: Forced           Reason:                                        hfethod:                            Fxhibit G - Instructions S: Scheduled         A-Equipment Failure (Explain)                 1-hfanual                            for Preparation of Data B-Maintenance or Test                         2-hfanual Scram.                    Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram.                  Event Report (LER) File (NUREG-D-Regulatory Restriction                       4-Other (Explain)                    0161)
E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)
IIEV. 4/85 4949        Hither (Explain)                                                                   Exhibit 1 - Same Source
 
l NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE A ril 1990 COMPLETED BY Robert E.Dod e TELEPHONE 1 315 524-4446 ext.396 MONTH March 1990 The unit was shutdown for the Annual Refueling and Maintenance Outage.The unit remained shutdown at the end of the report period.  
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power   Plant DATE COMPLETED BY A ril     1990 Robert E. Dod e TELEPHONE 1 315   524-4446   ext. 396 MONTH   March   1990 The unit was shutdown for the Annual Refueling and Maintenance Outage. The unit remained shutdown at the end of the report period.
'I 0 jl}}
 
  '
I   0 jl}}

Revision as of 09:49, 29 October 2019

Monthly Operating Rept for Mar 1990 for Re Ginna Nuclear Power Plant.W/900418 Ltr
ML17309A442
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1990
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004230556
Download: ML17309A442 (7)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION 0 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 7Cl,KPHONC ARL'A cooE 71d 546.2700 GINNA STATION April 18, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1990 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1990.

Very truly yours, Robert C. Mec edy Division Manager Nuclear Production RCM/eeh Attachments cc: Mr. Thomas T. Martin NRC (1) 9004230556 900332 PDR ADOCK 05000244 R PDC

OPERATING DATA REPORT DOCKET NO. 50.244 DATE A r 18 1990 COHPLETED BY Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 OPERATING STATUS

1. Unit Nano: R.E. GINNA NUCLEAR P(NER PLANT Notes: The unit was shutdown on 2~ Reporting Period: MARCH 1990 Harch 23 for Annual Re-30 Licensed Thermal Power (HWt): 1520 fueling ard Haintenance.
4. Nameplate Rating (Gross HWe): 490 lt remained shutdown at
5. Design Electrical Rating (Net HWe): 470 the end of the report
6. Haxinxln Dependable Capacity (Gross We): 490 period.
7. Haxirljn Dependable Capacity (Net HWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, lf Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cwuiat 1 ve

11. Hours In Report Period 2 160.0 178 746.45
12. Nunber of Hours Reactor Was Critical 546.07 1 962.07 140 308.21
13. Reactor Reserve Shutdown Hours 1 687.55 14 ~ Hours Generator On-Line 545.5 1 961.5 137 802.88 Unit Reserve Shutdown Hours *

'0

15. 8.5
16. Gross Thermal Energy Generated (HWH) 808 550 2 926 224 194 548 674
17. Gross Electrical Energy Generated (WH) 274 719 987 813 64 021 158
18. Net Electrical Energy Generated (WH) 261 454 940 207 758 120
19. Unit Service Factor 73.32 90.81 77.27
20. Unit Availability Factor 73.32 90.81 77.27 21 ~ Unit Capacity Factor (Using HDC Het) 74.77 92.61 73.81
22. Unit Capacity Factor (Using DER Net) 74.77 92.61 73.81
23. Unit Forced Outage Rate 6.27
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startupr
26. Units In Test Status (Prior to Conmercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERCI AL OPERATION
  • CUMULATIVE TOTAL COMHENCING JANUARY 1, 1975

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 DATE A COMPLETED BY r'8 UNIT R.E. Ginna Nuclear Power 1990 Plant Robert E. D dge TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 484 17 ~

2 3

4

~

~

~

484 484 484 18 20.

'83

'9

~

483 482 482

5. 484 21 ~ 482
6. 484 22 475

'3 7 ~ 484 265

8. 24. -10

'84 9 ~ 484 25.

10. 484 26.

484 27

'8

12. 483

'9.

13 484

'4.

484 30.

15. 483 31.

16 483 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

t' f)O(:Kf'.T NO. SO 244 ljNf'I'NAMf R.E. GINNA NUCLEAR POWER PLANT'NIT SHUTDOWN AND POWER REDUCTIONS

(:OhfPLETED BY o er REPORT hlONTH MARCH 1990 frpffQNf; 3 1 5-524 -4446 >-396 Ginna Station Pl I

0 0I >>

c

.0 e C 0

ocv Licensee Ew C C

0 I4l Cause ffI Corrective Ho. Date

~ 0 0 0>> 0 Event 0 Vl 0 0 0 0 Action to 0 Report 0 E txl eon 0 4f IA 0 U Prevent Recurrence 0 O 90-1 3/23/90 S The unit was shutdown for Annual Refueling and Mainten-ance Outage. The unit remain-ed shutdown at the end of the report period.

F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-hfanual for Preparation of Data B-Maintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

IIEV. 4/85 4949 Hither (Explain) Exhibit 1 - Same Source

l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE COMPLETED BY A ril 1990 Robert E. Dod e TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1990 The unit was shutdown for the Annual Refueling and Maintenance Outage. The unit remained shutdown at the end of the report period.

'

I 0 jl