ML17309A442
| ML17309A442 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/31/1990 |
| From: | Dodge R, Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9004230556 | |
| Download: ML17309A442 (7) | |
Text
ROCHESTER GAS AND ELECTRIC CORPORATION 0 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 7Cl,KPHONC ARL'A cooE 71d 546.2700 GINNA STATION April 18, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for March, 1990 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1990.
Very truly yours, Robert C.
Mec edy Division Manager Nuclear Production RCM/eeh Attachments cc:
Mr. Thomas T. Martin NRC (1) 9004230556 900332 PDR ADOCK 05000244 R
OPERATING DATA REPORT DOCKET NO.
DATE COHPLETED BY 50.244 A r 18 1990 Robert E. Dodge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1.
2 ~
30 4.
5.
6.
7.
8.
Unit Nano:
R.E.
GINNA NUCLEAR P(NER PLANT Reporting Period:
MARCH 1990 Licensed Thermal Power (HWt):
Nameplate Rating (Gross HWe):
Design Electrical Rating (Net HWe):
Haxinxln Dependable Capacity (Gross We):
Haxirljn Dependable Capacity (Net HWe):
If Changes Occur in Capacity Ratings (Items 1520 490 470 490 470 Notes:
The unit was shutdown on Harch 23 for Annual Re-fueling ard Haintenance.
lt remained shutdown at the end of the report period.
Nunber 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, lf Any (Net MWe):
10.
Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cwuiat 1 ve 11.
12.
13.
14 ~
15.
16.
17.
18.
19.
20.
21
~
22.
23.
Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (HWH)
Gross Electrical Energy Generated (WH)
Net Electrical Energy Generated (WH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using HDC Het)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate 546.07 545.5 808 550 274 719 261 454 73.32 73.32 74.77 74.77 2 160.0 1 962.07 178 746.45 140 308.21 1 687.55 2 926 224 987 813 194 548 674 64 021 158 940 207 '0 758 120 90.81 90.81 92.61 92.61 77.27 77.27 73.81 73.81 6.27 1 961.5 137 802.88 8.5 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startupr 26.
Units In Test Status (Prior to Conmercial Operation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COHHERCI AL OPERATION
- CUMULATIVE TOTAL COMHENCING JANUARY 1, 1975
AVERAGE DAILY UNIT POWER LEVEL MONTH March 1990 DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE A r'8 1990 COMPLETED BY Robert E.
D dge TELEPHONE 1
315 524-4446 ext.
396 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
2 ~
3 ~
4 ~
5.
6.
7 ~
484 484 484 484 484 484 484 17
~
18
'9
~
20.
21 ~
22
'3
'83 483 482 482 482 475 265 8.
9 ~
10.
12.
13
'4.
15.
16
'84 484 484 484 483 484 484 483 483 24.
25.
26.
27
'8
'9.
30.
31.
-10 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
t' f)O(:Kf'.T NO.
SO 244 ljNf'I'NAMf R.E. GINNA NUCLEAR POWER PLANT'NIT SHUTDOWN AND POWER REDUCTIONS
(:OhfPLETED BY o er REPORT hlONTH MARCH 1990 frpffQNf; 3 15-524 -4446 >-396 Ginna Station Ho.
Date c.0 e
~
0 C0 00 txl Pl I
0I >>0 ocv 0>> 0 eon 0
0 Licensee Event Report 4f Ew 0
0 Vl 0 IA C0 I4l 0C 0
E 0
0 U O
Cause ffI Corrective Action to Prevent Recurrence 90-1 3/23/90 S
The unit was shutdown for Annual Refueling and Mainten-ance Outage.
The unit remain-ed shutdown at the end of the report period.
F: Forced S:
Scheduled IIEV. 4/85 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)
Hither (Explain) hfethod:
1-hfanual 2-hfanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
l NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A ril 1990 COMPLETED BY Robert E.
Dod e TELEPHONE 1
315 524-4446 ext.
396 MONTH March 1990 The unit was shutdown for the Annual Refueling and Maintenance Outage.
The unit remained shutdown at the end of the report period.
I 0
jl