Monthly Operating Rept for Mar 1990 for Re Ginna Nuclear Power Plant.W/900418 Ltr
ML17309A442
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1990
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9004230556
Download: ML17309A442 (7)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION 0 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 7Cl,KPHONC ARL'A cooE 71d 546.2700 GINNA STATION April 18, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for March, 1990 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1990.

Very truly yours, Robert C. Mec edy Division Manager Nuclear Production RCM/eeh Attachments cc: Mr. Thomas T. Martin NRC (1) 9004230556 900332 PDR ADOCK 05000244 R PDC

OPERATING DATA REPORT DOCKET NO. 50.244 DATE A r 18 1990 COHPLETED BY Robert E. Dodge TELEPHONE 315 524-4446 ext. 396 OPERATING STATUS

1. Unit Nano: R.E. GINNA NUCLEAR P(NER PLANT Notes: The unit was shutdown on 2~ Reporting Period: MARCH 1990 Harch 23 for Annual Re-30 Licensed Thermal Power (HWt): 1520 fueling ard Haintenance.
4. Nameplate Rating (Gross HWe): 490 lt remained shutdown at
5. Design Electrical Rating (Net HWe): 470 the end of the report
6. Haxinxln Dependable Capacity (Gross We): 490 period.
7. Haxirljn Dependable Capacity (Net HWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, lf Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cwuiat 1 ve

11. Hours In Report Period 2 160.0 178 746.45
12. Nunber of Hours Reactor Was Critical 546.07 1 962.07 140 308.21
13. Reactor Reserve Shutdown Hours 1 687.55 14 ~ Hours Generator On-Line 545.5 1 961.5 137 802.88 Unit Reserve Shutdown Hours *

'0

15. 8.5
16. Gross Thermal Energy Generated (HWH) 808 550 2 926 224 194 548 674
17. Gross Electrical Energy Generated (WH) 274 719 987 813 64 021 158
18. Net Electrical Energy Generated (WH) 261 454 940 207 758 120
19. Unit Service Factor 73.32 90.81 77.27
20. Unit Availability Factor 73.32 90.81 77.27 21 ~ Unit Capacity Factor (Using HDC Het) 74.77 92.61 73.81
22. Unit Capacity Factor (Using DER Net) 74.77 92.61 73.81
23. Unit Forced Outage Rate 6.27
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startupr
26. Units In Test Status (Prior to Conmercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COHHERCI AL OPERATION
  • CUMULATIVE TOTAL COMHENCING JANUARY 1, 1975

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 DATE A COMPLETED BY r'8 UNIT R.E. Ginna Nuclear Power 1990 Plant Robert E. D dge TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 484 17 ~

2 3

4

~

~

~

484 484 484 18 20.

'83

'9

~

483 482 482

5. 484 21 ~ 482
6. 484 22 475

'3 7 ~ 484 265

8. 24. -10

'84 9 ~ 484 25.

10. 484 26.

484 27

'8

12. 483

'9.

13 484

'4.

484 30.

15. 483 31.

16 483 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

t' f)O(:Kf'.T NO. SO 244 ljNf'I'NAMf R.E. GINNA NUCLEAR POWER PLANT'NIT SHUTDOWN AND POWER REDUCTIONS

(:OhfPLETED BY o er REPORT hlONTH MARCH 1990 frpffQNf; 3 1 5-524 -4446 >-396 Ginna Station Pl I

0 0I >>

c

.0 e C 0

ocv Licensee Ew C C

0 I4l Cause ffI Corrective Ho. Date

~ 0 0 0>> 0 Event 0 Vl 0 0 0 0 Action to 0 Report 0 E txl eon 0 4f IA 0 U Prevent Recurrence 0 O 90-1 3/23/90 S The unit was shutdown for Annual Refueling and Mainten-ance Outage. The unit remain-ed shutdown at the end of the report period.

F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-hfanual for Preparation of Data B-Maintenance or Test 2-hfanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training gt License Examination F-Administrative G-Operational Error (Explain)

IIEV. 4/85 4949 Hither (Explain) Exhibit 1 - Same Source

l NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE COMPLETED BY A ril 1990 Robert E. Dod e TELEPHONE 1 315 524-4446 ext. 396 MONTH March 1990 The unit was shutdown for the Annual Refueling and Maintenance Outage. The unit remained shutdown at the end of the report period.

I 0 jl