{{#Wiki_filter:ACCELERATED DJ TRIBUTION DEMONS TION SYSTEM j REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFXLIATXON DODGE,R.E.
{{#Wiki_filter:ACCELERATED DJ TRIBUTION DEMONS                                     TION SYSTEM j
Rochester Gas&Electric Corp.MECREDY,R.C.
REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000244
DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester               G 05000244 AUTH. NAME           AUTHOR AFFXLIATXON DODGE,R.E.           Rochester Gas & Electric Corp.
MECREDY,R.C.         Rochester Gas & Electric Corp.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operati.for Oct 1991 for RE Ginna Nuclear Power Plant.W 91 115 ltr.DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE: TXTLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Monthly operati                 for Oct 1991 for RE Ginna Nuclear Power Plant.W 91 115         ltr.
05000244 D RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA NRR/DL~Q/B10 PEGp~LE~1 EXTERNAL WRIER CE 1 J~H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DS P/TPAB NRR/DOEA/OEAB RGN1 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D R D NOTE TO ALL"RIDS" RECIPIENTS:
                                          .
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 h
D DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR                   ENCL     SIZE:
l IIIIIII'WZZ AHO , ngrgrz zziuzzz rr rrrrrrr rrrre ROCHESTER GAS AND ELECTRIC CORPORATION ROBERT C MECREDY Vice President Cinna true!ear Production pa r Qe(AA rrte/', Years stare o 89 EAST AVENUE, ROCHESTER N.K 14649-0001 TELEPNONE ArtEA cceE no 546-2700 GINNA STATION November 15, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555  
TXTLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date         in accordance with 10CFR2,2.109(9/19/72).         05000244 RECIPIENT               COPIES            RECIPIENT        COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME     LTTR ENCL          D PD1-3 LA                   3      3      PD1-3 PD              1    1 JOHNSON,A                   1      1                                              D INTERNAL: AEOD/DOA                     1      1      AEOD/DS P/TPAB        1    1 NRR/DL~Q/     B10         1      1      NRR/DOEA/OEAB        1    1 PEGp~LE~             1      1      1      RGN1                  1    1 EXTERNAL WRIER CE J    1 ~ H         1     1     NRC PDR               1   1 NSIC                        1     1 R
D D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL   14
 
h rr
          ,
IIIIIII'WZZ AHO ngrgrz rrrrrrr zziuzzz rrrre l                                                        pa
                                                                                              /
r Qe(AA
                                                                                                          ',
rrte Years stare ROCHESTER GAS AND ELECTRIC CORPORATION            o 89 EAST AVENUE, ROCHESTER N. K   14649-0001 ROBERT C MECREDY                                                                      TELEPNONE Vice President                                                                  ArtEA cceE no 546-2700 Cinna true!ear Production GINNA STATION November 15, 1991 US       Nuclear Regulatory Commission Document               Control Desk Washington,               DC 20555


==Subject:==
==Subject:==
Monthly Report for October, 1991 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  
Monthly Report for October, 1991 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear          Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1991.
Very truly  yours, Robert  C. Mecredy RCM/eeh Attachments cc:          Mr. Thomas T. Martin        NRC  (1) 9i-1-i-220277r 91 i 03 i
; PDR-,- 'DOCK =05000244
<<R                                PDR
 
OPERATING DATA REPORT DOCKET NO.      50.244 DATE      Nov    r 15    1991 COMPLETED BY Robert E. Dodge TELEPHONE      315  524.4446 ext. 396 OPERATING STATUS Unit  Name:  R.E. GINNA NUCLEAR POWER PLANT                              Notes: The unit operated at
: 2.      Reporting Period:      October 1991                                              approximately 97/ reactor
: 3.      Licensed Thermal Power (MWt):                  1520                              power level for the entire
: 4.      Nameplate Rating (Gross MWe):                  490                              report period.
: 5.      Design Electrical Rating (Net MWe):            470
: 6.      Maximm Dependable Capacity (Gross MWe):        490
: 7.      Maximua Dependable Capacity (Net MWe):          470
: 8.      If Changes Occur in Capacity Ratings (Items Hurber 3 Through 7) Since Last Report, Give Reasons:
: 9.      Power Level  to Which Restricted, If Any (Het  MWe):
: 10. Reasons  For Restrictions, If Any:
This Month      Yr.-to.Date            Cuwiat I ve
                                                                                                            **
: 11. Hours In Report Period                                    745***            7 296                  192 642.45
: 12. Nunber of Hours Reactor Was Critical                      745              6 127.65                151  866.96
: 13. Reactor Reserve Shutdown Hours                                                                        1  687.55
: 14. Hours Generator On. Line                                  745              6 073.25                149 241.63
: 15. Unit Reserve Shutdown Hours                                                                                8.5  *
: 16. Gross Thermal Energy Generated (MWH)                1 103 223          8 694 055              211 044 752
: 17. Gross Electrical Energy Generated (MWH)              373 123          2 929 025              69 591 499
: 18. Net Electrical Energy Generated (MWH)                354 883          2 781 132              66 050 425
: 19. Unit  Service Factor                                      100%                83.24/.                    77.63%
: 20. Unit  Availability Factor                                100%                83.24%                    77.64/
: 21. Unit  Capacity Factor (Using  MDC  Net)                  101 .35%            81.10%                    74.35%
: 22. Unit  Capacity Factor (Using  DER  Net)                  101.35%              81.10/                    74.35%
: 23. Unit  Forced Outage Rate                                    0%                    .48/                    6.11%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Arcual Refuelin and Maintenance Outa e: Startin March 27 1992 Duration: 40 da s
: 25. If Shut Down At Erd Of Report Period, Estimated Date of Startup: 05-10.91
: 26. Units In Test Status (Prior to Camercial Operation):                      Forecast                Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  *CUMULATIVE TOTAL COMMENCING JANUARY    1, 1975
**CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
"**CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME
 
t AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.      50-244 UNIT R.E. Ginna Nuclear Power    Plant DATE November 15      1991 COMPLETED BY Robert E. Dod TELEPHONE  1  315    524-4446    ext. 396 MONTH    October  1991 DAY AVERAGE  DAILY POWER LEVEL        DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                            (MWe-Net) 1 ~          470                      17    ~        475 2 ~          471                      18.            475 3 ~          471                      19  ~        475 4 ~          471                      20.            475 6
7
  ~
  ~
472 472 472 21.
22 23.
                                          '75        476 475
: 8.          473                      24.            475 9.
10  '71      473 472 25.
26
                                          '75
                                          '7 475 476 12.
13.
14.
473 473 474 28.
29 30.
                                          '76        475 476 15.
16  '74 INSTRUCTIONS 474                      31.            476 On  this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e
(
r C
 
DO(:KET NO.        SO-244 UNiT NAMl.. R.E. (slNNA NUCLEAR POWER O'LA)T UNIT SHUTDOWN AND POWER REDUCTIONS                  D
(:OMPLETED BY bert E. Dodge REPORT MONTH                        TELEPHONE 315-524-4446 >-396 Ginna    station Fl a
                                .0 e      a 0
ocv0  D Licensee      Em 0
0 OIA a              Cause  8a Corrective No.            Dote          0 0      N                Event          0      0 0 0                  Action to o      a 0                                        E 0 A~      cxl    own a E
Report 4    lA 0                        Prevent Recurrence 0                            O A
No unit shutdowns or        power reduction this report period.
F: Forced            Reason:                                      Method:                        Exhibit G - Instructions S:    Scheduled      A-Equipment Failutc (Explain)                1-Manual                        for Preparation of Data B-Maintenance or Test                        2-Manual Scram.                Entry Sheets for Licensee C-Refueling                                  3-Automatic Scram.              Event Report (LER) File (NUREG-D-Regulatory Restriction                    4-Other (Explain)              0161)
E&perator Training & License Examination F-Administrative G-Operational Error (Explain)
REV. 4/8S 4949        H-Ocher (Explain)                                                          Exhibit  1 - Same Source


==Dear Sir:==
C~
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1991.Very truly yours, Robert C.Mecredy RCM/eeh Attachments cc: Mr.Thomas T.Martin NRC (1)9i-1-i-220277r 91 i 03 i;PDR-,-'DOCK=05000244<<R PDR OPERATING DATA REPORT DOCKET NO.50.244 DATE Nov r 15 1991 COMPLETED BY Robert E.Dodge OPERATING STATUS TELEPHONE 315 524.4446 ext.396 2.3.4.5.6.7.8.Unit Name: R.E.GINNA NUCLEAR POWER PLANT Reporting Period: October 1991 Licensed Thermal Power (MWt): Nameplate Rating (Gross MWe): Design Electrical Rating (Net MWe): Maximm Dependable Capacity (Gross MWe): Maximua Dependable Capacity (Net MWe): If Changes Occur in Capacity Ratings (Items Notes: The unit operated at approximately 97/reactor power level for the entire report period.1520 490 470 490 470 Hurber 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Het MWe): 10.Reasons For Restrictions, If Any: 11.12.13.14.15.16.17.18.19.20.21.22.23.Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On.Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate This Month 745***745 745 1 103 223 373 123 354 883 100%100%101.35%101.35%0%Yr.-to.Date 7 296 6 127.65 6 073.25 8 694 055 2 929 025 2 781 132 83.24/.83.24%81.10%81.10/.48/Cuwiat I ve**192 642.45 151 866.96 1 687.55 149 241.63 8.5*211 044 752 69 591 499 66 050 425 77.63%77.64/74.35%74.35%6.11%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Arcual Refuelin and Maintenance Outa e: Startin March 27 1992 Duration: 40 da s 25.If Shut Down At Erd Of Report Period, Estimated Date of Startup: 05-10.91 26.Units In Test Status (Prior to Camercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969"**CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME t t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE November 15 1991 COMPLETED BY Robert E.Dod TELEPHONE 1 315 524-4446 ext.396 MONTH October 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1~470 17~475 2~471 18.475 3~471 19~475 4~471 20.475 472 21.476 6~472 22'75 7~472 23.475 8.473 24.475 9.473 25.475 10'71 472 26'7'75 476 12.473 28.475 13.473 29'76 14.474 30.476 15.474 31.476 16'74 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
e (r C DO(:KET NO.SO-244 UNiT NAMl..R.E.(slNNA NUCLEAR POWER O'LA)T UNIT SHUTDOWN AND POWER REDUCTIONS D (:OMPLETED BY bert E.Dodge REPORT MONTH TELEPHONE 315-524-4446
>-396 Ginna station No.Dote a.0 e 0 0 o A~a 0 N a 0 cxl Fl 0 ocv D own a E 0 A Licensee Event Report 4 Em 0 0 0 lA 0 OIA a 0 0 0 E 0 O Cause 8a Corrective Action to Prevent Recurrence No unit shutdowns or power reduction this report period.F: Forced S: Scheduled REV.4/8S 4949 Reason: A-Equipment Failutc (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training&License Examination F-Administrative G-Operational Error (Explain)H-Ocher (Explain)Method: 1-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)Exhibit 1-Same Source C~
NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-244 UNIT R.E.Ginna Nuclear Power Plant DATE Novembe 5 1991 COMPLETED BY Robert E.Dod e TELEPHONE 1 315 524-4446 ext.396 MONTH October 1991 The unit operated at approximately 974 reactor power level for the entire report period.
OF OPERATING EXPERIENCE DOCKET NO.       50-244 UNIT R.E. Ginna Nuclear Power     Plant DATE Novembe       5   1991 COMPLETED BY Robert E. Dod e TELEPHONE   1   315   524-4446   ext. 396 MONTH   October 1991 The unit operated at approximately   974 reactor power level for the entire report period.
0~s'I}}
 
0 ~ s
'I}}

Revision as of 18:37, 29 October 2019

Monthly Operating Rept for Oct 1991 for Re Ginna Nuclear Power Plant.W/911115 Ltr
ML17262A658
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1991
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111220277
Download: ML17262A658 (10)


Text

ACCELERATED DJ TRIBUTION DEMONS TION SYSTEM j

REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFXLIATXON DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operati for Oct 1991 for RE Ginna Nuclear Power Plant.W 91 115 ltr.

.

D DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DL~Q/ B10 1 1 NRR/DOEA/OEAB 1 1 PEGp~LE~ 1 1 1 RGN1 1 1 EXTERNAL WRIER CE J 1 ~ H 1 1 NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

h rr

,

IIIIIII'WZZ AHO ngrgrz rrrrrrr zziuzzz rrrre l pa

/

r Qe(AA

',

rrte Years stare ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N. K 14649-0001 ROBERT C MECREDY TELEPNONE Vice President ArtEA cceE no 546-2700 Cinna true!ear Production GINNA STATION November 15, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for October, 1991 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1991.

Very truly yours, Robert C. Mecredy RCM/eeh Attachments cc: Mr. Thomas T. Martin NRC (1) 9i-1-i-220277r 91 i 03 i

PDR-,- 'DOCK =05000244

<<R PDR

OPERATING DATA REPORT DOCKET NO. 50.244 DATE Nov r 15 1991 COMPLETED BY Robert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit operated at

2. Reporting Period: October 1991 approximately 97/ reactor
3. Licensed Thermal Power (MWt): 1520 power level for the entire
4. Nameplate Rating (Gross MWe): 490 report period.
5. Design Electrical Rating (Net MWe): 470
6. Maximm Dependable Capacity (Gross MWe): 490
7. Maximua Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Hurber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Het MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cuwiat I ve

11. Hours In Report Period 745*** 7 296 192 642.45
12. Nunber of Hours Reactor Was Critical 745 6 127.65 151 866.96
13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On. Line 745 6 073.25 149 241.63
15. Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (MWH) 1 103 223 8 694 055 211 044 752
17. Gross Electrical Energy Generated (MWH) 373 123 2 929 025 69 591 499
18. Net Electrical Energy Generated (MWH) 354 883 2 781 132 66 050 425
19. Unit Service Factor 100% 83.24/. 77.63%
20. Unit Availability Factor 100% 83.24% 77.64/
21. Unit Capacity Factor (Using MDC Net) 101 .35% 81.10% 74.35%
22. Unit Capacity Factor (Using DER Net) 101.35% 81.10/ 74.35%
23. Unit Forced Outage Rate 0% .48/ 6.11%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Arcual Refuelin and Maintenance Outa e: Startin March 27 1992 Duration: 40 da s

25. If Shut Down At Erd Of Report Period, Estimated Date of Startup: 05-10.91
26. Units In Test Status (Prior to Camercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

"**CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE November 15 1991 COMPLETED BY Robert E. Dod TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 ~ 470 17 ~ 475 2 ~ 471 18. 475 3 ~ 471 19 ~ 475 4 ~ 471 20. 475 6

7

~

~

472 472 472 21.

22 23.

'75 476 475

8. 473 24. 475 9.

10 '71 473 472 25.

26

'75

'7 475 476 12.

13.

14.

473 473 474 28.

29 30.

'76 475 476 15.

16 '74 INSTRUCTIONS 474 31. 476 On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

e

(

r C

DO(:KET NO. SO-244 UNiT NAMl.. R.E. (slNNA NUCLEAR POWER O'LA)T UNIT SHUTDOWN AND POWER REDUCTIONS D

(:OMPLETED BY bert E. Dodge REPORT MONTH TELEPHONE 315-524-4446 >-396 Ginna station Fl a

.0 e a 0

ocv0 D Licensee Em 0

0 OIA a Cause 8a Corrective No. Dote 0 0 N Event 0 0 0 0 Action to o a 0 E 0 A~ cxl own a E

Report 4 lA 0 Prevent Recurrence 0 O A

No unit shutdowns or power reduction this report period.

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failutc (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E&perator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/8S 4949 H-Ocher (Explain) Exhibit 1 - Same Source

C~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novembe 5 1991 COMPLETED BY Robert E. Dod e TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1991 The unit operated at approximately 974 reactor power level for the entire report period.