Monthly Operating Rept for Oct 1991 for Re Ginna Nuclear Power Plant.W/911115 Ltr
ML17262A658
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1991
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111220277
Download: ML17262A658 (10)


Text

ACCELERATED DJ TRIBUTION DEMONS TION SYSTEM j

REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET g FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFXLIATXON DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operati for Oct 1991 for RE Ginna Nuclear Power Plant.W 91 115 ltr.

D DISTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRR/DL~Q/ B10 1 1 NRR/DOEA/OEAB 1 1 PEGp~LE~ 1 1 1 RGN1 1 1 EXTERNAL WRIER CE J 1 ~ H 1 1 NRC PDR 1 1 NSIC 1 1 R

D D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

h rr IIIIIII'WZZ AHO ngrgrz rrrrrrr zziuzzz rrrre l pa

/

r Qe(AA rrte Years stare ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER N. K 14649-0001 ROBERT C MECREDY TELEPNONE Vice President ArtEA cceE no 546-2700 Cinna true!ear Production GINNA STATION November 15, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for October, 1991 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1991.

Very truly yours, Robert C. Mecredy RCM/eeh Attachments cc: Mr. Thomas T. Martin NRC (1) 9i-1-i-220277r 91 i 03 i

PDR-,- 'DOCK =05000244

<<R PDR

OPERATING DATA REPORT DOCKET NO. 50.244 DATE Nov r 15 1991 COMPLETED BY Robert E. Dodge TELEPHONE 315 524.4446 ext. 396 OPERATING STATUS Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit operated at

2. Reporting Period: October 1991 approximately 97/ reactor
3. Licensed Thermal Power (MWt): 1520 power level for the entire
4. Nameplate Rating (Gross MWe): 490 report period.
5. Design Electrical Rating (Net MWe): 470
6. Maximm Dependable Capacity (Gross MWe): 490
7. Maximua Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Hurber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Het MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cuwiat I ve

11. Hours In Report Period 745*** 7 296 192 642.45
12. Nunber of Hours Reactor Was Critical 745 6 127.65 151 866.96
13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On. Line 745 6 073.25 149 241.63
15. Unit Reserve Shutdown Hours 8.5 *
16. Gross Thermal Energy Generated (MWH) 1 103 223 8 694 055 211 044 752
17. Gross Electrical Energy Generated (MWH) 373 123 2 929 025 69 591 499
18. Net Electrical Energy Generated (MWH) 354 883 2 781 132 66 050 425
19. Unit Service Factor 100% 83.24/. 77.63%
20. Unit Availability Factor 100% 83.24% 77.64/
21. Unit Capacity Factor (Using MDC Net) 101 .35% 81.10% 74.35%
22. Unit Capacity Factor (Using DER Net) 101.35% 81.10/ 74.35%
23. Unit Forced Outage Rate 0% .48/ 6.11%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Arcual Refuelin and Maintenance Outa e: Startin March 27 1992 Duration: 40 da s

25. If Shut Down At Erd Of Report Period, Estimated Date of Startup: 05-10.91
26. Units In Test Status (Prior to Camercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

"**CHANGE FROM EASTERN DAYLIGHT SAVINGS TIME TO EASTERN STANDARD TIME

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE November 15 1991 COMPLETED BY Robert E. Dod TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 ~ 470 17 ~ 475 2 ~ 471 18. 475 3 ~ 471 19 ~ 475 4 ~ 471 20. 475 6

7

~

~

472 472 472 21.

22 23.

'75 476 475

8. 473 24. 475 9.

10 '71 473 472 25.

26

'75

'7 475 476 12.

13.

14.

473 473 474 28.

29 30.

'76 475 476 15.

16 '74 INSTRUCTIONS 474 31. 476 On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

e

(

r C

DO(:KET NO. SO-244 UNiT NAMl.. R.E. (slNNA NUCLEAR POWER O'LA)T UNIT SHUTDOWN AND POWER REDUCTIONS D

(:OMPLETED BY bert E. Dodge REPORT MONTH TELEPHONE 315-524-4446 >-396 Ginna station Fl a

.0 e a 0

ocv0 D Licensee Em 0

0 OIA a Cause 8a Corrective No. Dote 0 0 N Event 0 0 0 0 Action to o a 0 E 0 A~ cxl own a E

Report 4 lA 0 Prevent Recurrence 0 O A

No unit shutdowns or power reduction this report period.

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failutc (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E&perator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/8S 4949 H-Ocher (Explain) Exhibit 1 - Same Source

C~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novembe 5 1991 COMPLETED BY Robert E. Dod e TELEPHONE 1 315 524-4446 ext. 396 MONTH October 1991 The unit operated at approximately 974 reactor power level for the entire report period.

0 ~ s

'I