ML17309A429: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/30/1989
| issue date = 06/30/1989
| title = Monthly Operating Rept for June 1989 for Re Ginna Nuclear Power Plant.W/890724 Ltr
| title = Monthly Operating Rept for June 1989 for Re Ginna Nuclear Power Plant.W/890724 Ltr
| author name = DODGE R E, MECREDY R C
| author name = Dodge R, Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:A.CCElZRATEDDlBU'EONDEMONSTRTIO.'iSYSTEM4REGULATORY INFORMATION DISTRIBUTION SYSTEM(RXDS)ACCESSION NBR:8908030214 DOC.DATE:
{{#Wiki_filter:A.C CElZ RATED        Dl      BU'EON        DE M ONSTR TIO.'i          SYSTEM 4
89/06/30NOTARIZED:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION DODGE,R.E.
ACCESSION NBR:8908030214           DOC.DATE: 89/06/30      NOTARIZED: NO            DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                 G 05000244 AUTH. NAME          AUTHOR AFFILIATION DODGE,R.E.           Rochester Gas & Electric Corp.
Rochester Gas&ElectricCorp.MECREDY,R.C.
MECREDY,R.C.         Rochester Gas & Electric Corp.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforJune1989forREGinnaNuclearPowerPlant.W/890724 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIWED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)
Monthly operating rept      for June  1989  for  RE  Ginna Nuclear Power Plant.W/890724       ltr.                                                   D DISTRIBUTION CODE: IE24D        COPIES RECEIWED:LTR         ENCL      SIZE:
.05000244DRECIPIENT IDCODE/NAME PD1-3LAJOHNSON,A INTERNAL:
TITLE: Monthly Operating Report (per Tech Specs)
AEOD/DOAXRMTECHADVNRR/DOEA/EAB 11NUDOCS-ABSTRACT RGN1EXTERNALEG&GSIMPSONIFNRCPDRCOPIESLTTRENCL331111221111111111RECIPIENT IDCODE/NAME PD1-3PDAEOD/DSP/TPAB NRR/DLPQ/PEB 10NRR/JEEP/RPB 10EG01LPDRNSXCCOPXESLTTRENCL11111111111111DDNOTE'IOALL"RIBS"MKXPZEPIS SPLEASEHELPUS'IOREDUCEHASTE!CONI'ACZ'IHEDOCXJMKI'XWZROL DESKROCNPl-37(EXT.20079)IOEIaIMZNATE KRRNAMEHEMDISI%GH7ZXCN LISTSFORDOCUKRPIS YOUDGN~TNEED!TOTALNUMBEROFCOPXESREQUIRED:
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)               . 05000244 RECIPIENT            COPIES            RECIPIENT            COPXES ID  CODE/NAME        LTTR ENCL        ID CODE/NAME         LTTR ENCL PD1-3 LA                3    3      PD1-3 PD                1      1            D JOHNSON,A               1    1 D
LTTR19ENCL19
INTERNAL: AEOD/DOA                  1    1      AEOD/DSP/TPAB           1      1 XRM TECH ADV            2    2      NRR/DLPQ/PEB 10          1      1 NRR/DOEA/EAB 11          1    1      NRR/JEEP/RPB 10          1      1 NUDOCS-ABSTRACT          1    1      EG              01    1      1 RGN1                    1    1 EXTERNAL    EG&G S IMPSON I F        1    1      LPDR                    1      1 NRC PDR                  1    1      NSXC                    1      1 NOTE 'IO ALL "RIBS" MKXPZEPIS S
,0t~'vzz<uzeEel(Al~*A~uiI"iI@auROCHESTER GASANDELECTRICCORPORATION o69EASTAVENUE,ROCHESTER, N.Y.14649-0001 TELEPHONE
PLEASE HELP US 'IO REDUCE HASTE! CONI'ACZ 'IHE DOCXJMKI'XWZROL DESK ROCN Pl-37 (EXT. 20079) IO EIaIMZNATE KRR NAME HEM DISI%GH7ZXCN LISTS FOR DOCUKRPIS YOU DGN~T NEED!
*ma*coos7ia546.2700GINNASTATIONJuly24,1989USNuclearRegulatory Commission DocumentControlDeskWashington, DC20555
TOTAL NUMBER OF COPXES REQUIRED: LTTR            19  ENCL      19
 
    ~
    ~'vzz uze uiI"iI
                @au
                        ,  0                            t                        Eel (Al~ *A ROCHESTER GAS AND ELECTRIC CORPORATION o 69 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE
                                                              *ma* coos 7ia 546.2700 GINNA STATION July 24, 1989 US  Nuclear Regulatory Commission Document        Control Desk Washington,       DC 20555


==Subject:==
==Subject:==
MonthlyReportforJune,1989Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244r
Monthly Report for June, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244 r
 
==Dear    Sir:==
 
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1989.
Very  truly yours, Robert C. Me re General Manager Nuclear Production RCM/eeh Attachments cc:    Mr. William T. Russell      NRC (1) aqppp3pg]4 +90&3 PDR      PDQCK      p~~.
R
 
OPERAT(NG DATA REPORT DOCKET NO.        50 244 l  24, 1989 COMPLETED BY Robert E. Dodg TELFPHONE 315-524-4446 x-396 OPERATING STATUS                                                                    Ginna Station I ~ Unit Name: R.E. 6INNA NUCLEAR POWER PLANT                        Notes
: 2. Reporting Period:        June, 1989
: 3. Licensed Thermal Power (MWt):                  1520              The unit operated at approx.
: 4. Nameplate Rating (Gross MWe):                  490              100% power for the majority
: 5. Design Electrical Rating (Nct MWe):            470              of  the report period, with a few exceptions detailed
: 6. Maximum Dependable Capacity (Gross MWe)t        490 on page 4 of the report.
: 7. Maximum Dependable Capacity (Net MWe):          470
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Nct MWc):
: 10. Reasons For Restrictions, If Any:
This Month          Yr.-to-Date          Cumulative
: 11. Hours In Reporting Period                            720                  4,343                172,169.45
: 12. Number of Hours Reactor Was Critical                636.74:~            2,514.23              134,211.84
: 13. Reactor Reserve Shutdown Hours                                                                      1,687.55*
: 14. Hours Gcncrator On-Line                              630.5                2,455.75              131,727.63
: 15. Unit Reserve Shutdown Hours                              0                                                8.5*
: 16. Gross Thermal Energy Generated (MWH)            878, 174            3,517,368              185,487,782
: 17. Gross Electrical Energy Generated (MWH)          294, 833            1,187,058              60,986,387
: 18. Nct    Flectrical Energy Gencratcd (MWH)                            1,127,294              57,871,752
: 19. Unit Service Factor                                    87.57                  56.55                    76.69
: 20. Unit Availability Factor                                87.57                  56.55                    76.69
: 21. Unit Capacity Factor (Using MDC Nct)                    82.58                  55. 23                    73.05
: 22. Unit Capacity Factor (UsingDER Net)                    82.58                  55.23                    73.05
: 23. Unit Forced Outage Rate                                12.43                    4.31                      6.34
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
: 25. If Shut Down A't End Of Report. Period, Estimated Dace of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                    Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMFRCIAL OPERATION
*Cumnulative          total  comnencing January 1, 1975                                            Atv. 44$ 49 88
 
    >v AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.      50-244 UNIT R.E. Ginna Nuclear Power      Plant DATE Jul COMPLETED BY 4
Robert E.
989 r  D  ge TELEPHONE  1  315      524-4446 Ext.      396  at Ginna MONTH        June    1989 DAY AVERAGE        DAILY POWER LEVEL        DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                  (MWe-Net) 101                        17.              485 2 ~                                          18                485
                                                  '9 3 ~                363                            ~            474 4 ~                430                      20.                485
: 5.                459                      21.                445
: 6.                482                      22
                                                  '3 7 ~                486
: 8.                482
                                                  '4.
                                                                -14 9 ~                481                      25.                160
: 10.                482                      26.                475 486                      27                477
: 12.                486
                                                '8.
477 13  ~            486                      29                475 14.
                                                '0.
486                                          475 15                485                      31.
    '6.
484 INSTRUCTIONS On      this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
DOCKI:.T NO.          SO 244 liNITNAME. R E- GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS                              DATE
(:OhIPLETED BY Robert E.
REPORT MONTH JULY 1989                      TELEPIIONE        315-524-4446 x-396 sana    a  ion    C Pl c ~                            cn>>0                                        c C  o au4          Licensee          Ew          OIA co                Cause  L Corrective 0
Ho.          Dote              0 o P                          0 o>>>      4    Event            0  5        Q                      Action to Q
o&~                        o cd  Eo n.'l c    Report  0        EA 0
(J E o Prevent Recurrence
                                                                                                              'U 0
CL 89-3        6-1-89              17                        H                  89-"004          IE                Reactor    trip was due to        a  turbine trip with reactor power          greater than 509, due to an AMSAC actuation.
Corrective Action: affected procedures were changed to ensure ANSAC  is reset.
89-4*        6-22-89              476                        H                89-007            SF          SF    SI pump design flaw delivery con-cerns. Incorrect original calibration data.
Corrective Action: correct calibra-tion data was confirmed for each orifice/flow transmitter            combination 1
3 F: Forced              Reason:                                                            hlethod:                            Fxhibit G - Instructions S:    Scheduled          A-Equipmcnt Failure (Explain)                                      1-hlanual                            for Preparation of Data B-Maintenance or Test                                              2-hlanual Scram.                    Entry Sheets for Licensee C-Refueling                                                        3-Automatic Scram.                  Event Report (LER) File (NUREG-D-Regulatory  Restriction'-Operator 4-Other (Explain)                    0161)
Training gc License Examination F-Administrative G-Operational Error (Explain)
REV. 4/85 4949            H-Ocher (Explain)                                                                                      Exhibit  1  - Same Source "Yearly Outage        Number
 
        'o tt V
t(
 
NARRATIVE


==DearSir:==
==SUMMARY==
PursuanttoourTechnical Specification 6.9.1,attachedherewithisthemonthlyoperating statusreportforGinnaStationforthemonthofJune,1989.Verytrulyyours,RobertC.MereGeneralManagerNuclearProduction RCM/eehAttachments cc:Mr.WilliamT.RussellNRC(1)aqppp3pg]4
OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE  Jul  2    19 9 COMPLETED BY obert E. Dod e TELEPHONE 1   315 524-4446 EXT. 396 at Ginna MONTH    June  1989 The  unit operated at 100% reactor power level for the majority of the report period, with some exceptions, detailed below.
+90&3PDRPDQCKp~~.R OPERATING STATUSOPERAT(NG DATAREPORTDOCKETNO.50244'l24,1989COMPLETED BYRobertE.DodgTELFPHONE 315-524-4446 x-396GinnaStationI~UnitName:R.E.6INNANUCLEARPOWER2.Reporting Period:June,19893.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NctMWe):6.MaximumDependable Capacity(GrossMWe)t7.MaximumDependable Capacity(NetMWe):PLANT1520490470490470NotesTheunitoperatedatapprox.100%powerforthemajorityofthereportperiod,withafewexceptions detailedonpage4ofthereport.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastRcport,GiveReasons:9.PowerLeveltoWhichRestricted, IfAny(NctMWc):10.ReasonsForRestrictions, IfAny:ThisMonthYr.-to-Date Cumulative 4,3437202,514.232,455.753,517,368 1,187,058 1,127,294 56.5556.5555.2355.2382.584.3111.HoursInReporting Period12.NumberofHoursReactorWasCritical636.74:~13.ReactorReserveShutdownHours14.HoursGcncrator On-Line630.515.UnitReserveShutdownHours016.GrossThermalEnergyGenerated (MWH)878,17417.GrossElectrical EnergyGenerated (MWH)294,83318.NctFlectrical EnergyGencratcd (MWH)19.UnitServiceFactor87.5720.UnitAvailability Factor87.5721.UnitCapacityFactor(UsingMDCNct)22.UnitCapacityFactor(UsingDER Net)82.5823.UnitForcedOutageRate12.4324.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):172,169.45 134,211.84 1,687.55*
On June 1, 1989 at 1332 EDST, with the reactor at approximately 534 power, a turbine trip with subsequent reactor trip occurred due to a ATNS Mitigation System Actuation Circuitry (AMSAC).
131,727.63 8.5*185,487,782 60,986,387 57,871,752 76.6976.6973.0573.056.3425.IfShutDownA'tEndOfReport.Period,Estimated DaceofStartup:26.UnitsInTestStatus(PriortoCommercial Operation):
On June 19, 1989 at 1440 EDST with the reactor at approximately 994 full power the "B" and "C" Safety Injection (SI) pumps were declared inoperable due to assessed design flow delivery concerns.
INITIALCRITICALITY INITIALELECTRICITY COMMFRCIAL OPERATION ForecastAchieved*Cumnulative totalcomnencing January1,1975Atv.44$4988
On  June 21, 1989 at 1401 a similar problem occurred with the "B" and "C" SI pumps and plant management decided to shut the plant down until the SI pump flow concerns were resolved. The plant was shutdown and subsecpxently cooled down to less than 350oF}}
>vAVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEJul4989COMPLETED BYrRobertE.DgeTELEPHONE 1315524-4446Ext.396atGinnaMONTHJune1989DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 2~3~4~5.6.7~8.9~10.12.13~14.15'6.10136343045948248648248148248648648648648548417.18'9~20.21.22'3'4.25.26.27'8.29'0.31.485485474485445-14160475477477475475INSTRUCTIONS Onthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereporting month.Computetothenearestwholemegawatt.
DOCKI:.TNO.SO244liNITNAME.
RE-GINNANUCLEARPOWERPLANTUNITSHUTDOWNANDPOWERREDUCTIONS DATE(:OhIPLETED BYRobertE.REPORTMONTHJULY1989TELEPIIONE 315-524-4446 x-396sanaaionCHo.Dotec~0Poo&Q~C00ocdPlcn>>0oau4o>>4>n.'lEoc0CLLicenseeEventReport0Ew500EA(JcOIAocQEo'UCauseLCorrective ActiontoPreventRecurrence 89-36-1-8917H89-"004IEReactortripwasduetoaturbinetripwithreactorpowergreaterthan509,duetoanAMSACactuation.
Corrective Action:affectedprocedures werechangedtoensureANSACisreset.89-4*6-22-89476H89-007SFSFSIpumpdesignflawdeliverycon-cerns.Incorrect originalcalibration data.Corrective Action:correctcalibra-tiondatawasconfirmed foreachorifice/flow transmitter combination 1F:ForcedS:Scheduled REV.4/854949Reason:A-Equipmcnt Failure(Explain)
B-Maintenance orTestC-Refueling D-Regulatory Restriction'-Operator TraininggcLicenseExamination F-Administrative G-Operational Error(Explain)
H-Ocher(Explain) 3hlethod:1-hlanual 2-hlanual Scram.3-Automatic Scram.4-Other(Explain)
FxhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-0161)Exhibit1-SameSource"YearlyOutageNumber
'ottVt(
NARRATIVE SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-244UNITR.E.GinnaNuclearPowerPlantDATEJul2199COMPLETED BYobertE.DodeTELEPHONE 1315524-4446EXT.396atGinnaMONTHJune1989Theunitoperatedat100%reactorpowerlevelforthemajorityofthereportperiod,withsomeexceptions, detailedbelow.OnJune1,1989at1332EDST,withthereactoratapproximately 534power,aturbinetripwithsubsequent reactortripoccurredduetoaATNSMitigation SystemActuation Circuitry (AMSAC).OnJune19,1989at1440EDSTwiththereactoratapproximately 994fullpowerthe"B"and"C"SafetyInjection (SI)pumpsweredeclaredinoperable duetoassesseddesignflowdeliveryconcerns.
OnJune21,1989at1401asimilarproblemoccurredwiththe"B"and"C"SIpumpsandplantmanagement decidedtoshuttheplantdownuntiltheSIpumpflowconcernswereresolved.
Theplantwasshutdownandsubsecpxently cooleddowntolessthan350oF}}

Latest revision as of 04:32, 4 February 2020

Monthly Operating Rept for June 1989 for Re Ginna Nuclear Power Plant.W/890724 Ltr
ML17309A429
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/30/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8908030214
Download: ML17309A429 (7)


Text

A.C CElZ RATED Dl BU'EON DE M ONSTR TIO.'i SYSTEM 4

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:8908030214 DOC.DATE: 89/06/30 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas & Electric Corp.

MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1989 for RE Ginna Nuclear Power Plant.W/890724 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIWED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 3 3 PD1-3 PD 1 1 D JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 XRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/JEEP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 EG 01 1 1 RGN1 1 1 EXTERNAL EG&G S IMPSON I F 1 1 LPDR 1 1 NRC PDR 1 1 NSXC 1 1 NOTE 'IO ALL "RIBS" MKXPZEPIS S

PLEASE HELP US 'IO REDUCE HASTE! CONI'ACZ 'IHE DOCXJMKI'XWZROL DESK ROCN Pl-37 (EXT. 20079) IO EIaIMZNATE KRR NAME HEM DISI%GH7ZXCN LISTS FOR DOCUKRPIS YOU DGN~T NEED!

TOTAL NUMBER OF COPXES REQUIRED: LTTR 19 ENCL 19

~

~'vzz uze uiI"iI

@au

, 0 t Eel (Al~ *A ROCHESTER GAS AND ELECTRIC CORPORATION o 69 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE

  • ma* coos 7ia 546.2700 GINNA STATION July 24, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for June, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244 r

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1989.

Very truly yours, Robert C. Me re General Manager Nuclear Production RCM/eeh Attachments cc: Mr. William T. Russell NRC (1) aqppp3pg]4 +90&3 PDR PDQCK p~~.

R

OPERAT(NG DATA REPORT DOCKET NO. 50 244 l 24, 1989 COMPLETED BY Robert E. Dodg TELFPHONE 315-524-4446 x-396 OPERATING STATUS Ginna Station I ~ Unit Name: R.E. 6INNA NUCLEAR POWER PLANT Notes

2. Reporting Period: June, 1989
3. Licensed Thermal Power (MWt): 1520 The unit operated at approx.
4. Nameplate Rating (Gross MWe): 490 100% power for the majority
5. Design Electrical Rating (Nct MWe): 470 of the report period, with a few exceptions detailed
6. Maximum Dependable Capacity (Gross MWe)t 490 on page 4 of the report.
7. Maximum Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct MWc):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720 4,343 172,169.45
12. Number of Hours Reactor Was Critical 636.74:~ 2,514.23 134,211.84
13. Reactor Reserve Shutdown Hours 1,687.55*
14. Hours Gcncrator On-Line 630.5 2,455.75 131,727.63
15. Unit Reserve Shutdown Hours 0 8.5*
16. Gross Thermal Energy Generated (MWH) 878, 174 3,517,368 185,487,782
17. Gross Electrical Energy Generated (MWH) 294, 833 1,187,058 60,986,387
18. Nct Flectrical Energy Gencratcd (MWH) 1,127,294 57,871,752
19. Unit Service Factor 87.57 56.55 76.69
20. Unit Availability Factor 87.57 56.55 76.69
21. Unit Capacity Factor (Using MDC Nct) 82.58 55. 23 73.05
22. Unit Capacity Factor (UsingDER Net) 82.58 55.23 73.05
23. Unit Forced Outage Rate 12.43 4.31 6.34
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down A't End Of Report. Period, Estimated Dace of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMFRCIAL OPERATION
  • Cumnulative total comnencing January 1, 1975 Atv. 44$ 49 88

>v AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jul COMPLETED BY 4

Robert E.

989 r D ge TELEPHONE 1 315 524-4446 Ext. 396 at Ginna MONTH June 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 101 17. 485 2 ~ 18 485

'9 3 ~ 363 ~ 474 4 ~ 430 20. 485

5. 459 21. 445
6. 482 22

'3 7 ~ 486

8. 482

'4.

-14 9 ~ 481 25. 160

10. 482 26. 475 486 27 477
12. 486

'8.

477 13 ~ 486 29 475 14.

'0.

486 475 15 485 31.

'6.

484 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DOCKI:.T NO. SO 244 liNITNAME. R E- GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE

(:OhIPLETED BY Robert E.

REPORT MONTH JULY 1989 TELEPIIONE 315-524-4446 x-396 sana a ion C Pl c ~ cn>>0 c C o au4 Licensee Ew OIA co Cause L Corrective 0

Ho. Dote 0 o P 0 o>>> 4 Event 0 5 Q Action to Q

o&~ o cd Eo n.'l c Report 0 EA 0

(J E o Prevent Recurrence

'U 0

CL 89-3 6-1-89 17 H 89-"004 IE Reactor trip was due to a turbine trip with reactor power greater than 509, due to an AMSAC actuation.

Corrective Action: affected procedures were changed to ensure ANSAC is reset.

89-4* 6-22-89 476 H 89-007 SF SF SI pump design flaw delivery con-cerns. Incorrect original calibration data.

Corrective Action: correct calibra-tion data was confirmed for each orifice/flow transmitter combination 1

3 F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hlanual for Preparation of Data B-Maintenance or Test 2-hlanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction'-Operator 4-Other (Explain) 0161)

Training gc License Examination F-Administrative G-Operational Error (Explain)

REV. 4/85 4949 H-Ocher (Explain) Exhibit 1 - Same Source "Yearly Outage Number

'o tt V

t(

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jul 2 19 9 COMPLETED BY obert E. Dod e TELEPHONE 1 315 524-4446 EXT. 396 at Ginna MONTH June 1989 The unit operated at 100% reactor power level for the majority of the report period, with some exceptions, detailed below.

On June 1, 1989 at 1332 EDST, with the reactor at approximately 534 power, a turbine trip with subsequent reactor trip occurred due to a ATNS Mitigation System Actuation Circuitry (AMSAC).

On June 19, 1989 at 1440 EDST with the reactor at approximately 994 full power the "B" and "C" Safety Injection (SI) pumps were declared inoperable due to assessed design flow delivery concerns.

On June 21, 1989 at 1401 a similar problem occurred with the "B" and "C" SI pumps and plant management decided to shut the plant down until the SI pump flow concerns were resolved. The plant was shutdown and subsecpxently cooled down to less than 350oF