Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:65477
| stage = Approval
}}
}}



Latest revision as of 15:47, 20 March 2021

Forwards Amend 94 to License DPR-61 & Safety Evaluation. Amend Revises heat-up Rate Curve & Provides Larger Interval for Low Temp Pressurization Protection Sys to Be Placed in Operation
ML20235J012
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/10/1987
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20235J014 List:
References
TAC-65477, NUDOCS 8710010265
Download: ML20235J012 (3)


Text

. _ _

i September 10, 1987 Docket No.: 50-213 DISTRIBUTION DocketiFU e G EJordan NRC/ Local PDR JPartlow Mr. Edward J. Mroczka, Senior Vice President ISAPD File TBarnhart(4)

Nuclear Engineering and Operations DCrutchfield WJones  !

Connecticut Yankee Atomic Power Company FSchroeder ACRS(10)

Post Office Box 270 MShuttleworth Tech Br Hartford, Connecticut 06141-0270 FAkstulewicz DHagan OGC-Beth WJones

Dear Mr. Mroczka:

EButcher GPA/PA ARM /LFMB47?f 6 #45 g

SUBJECT:

Technical Specifications Concerning Low Temperature Overpressurization Protection System Modifications

. Haddam Neck Plant The Commission has issued the enclosed Amendment No. 94 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated June 1, 1987.

The license amendment revises the heat-up rate curve (Figure 3.4-8) and also provides a larger interval for which the low-temperature pressurization protection system (LTOPS) must be placed into operation. More specifically, the proposed heat-up rate change results in a pressure / temperature limit curve shift. This shift increases the temperature range over which the LTOPS can effectively be placed into operation and decreases the probability of operator error during plant heat-up and cooldown operations.

A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register Notice.

Sincerely,

/s/

Francis M. Akstulewicz, Jr, Project Manager Integrated Safety Assessment Project Directorate Division of Reactor Projects III/IV/V and Special Projects

Enclosures:

1. Amendment No. 94to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next page ,,

t ewdfOih As ewicz 7/3/87 8/27/87 9 f o /87 1/ f/87 0FFICIAL RECORD COPY 8710010265 G70910 PDR ADOCK050g3 P

- --__-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ - ._ _ J

/ o,, UNITED L TATES 8 o NUCLEAR REGULATORY COMMISSION 3 .p r,

WASHINGTON, D. C. 20555

+g # September 10, 1987 Docket No.: 50-213 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company ,

Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Mroczka:

l

SUBJECT:

TECHNICAL SPECIFICATIONS CONCERNING LOW TEMPERATURE OVERPRESSURIZATION PROTECTION SYSTEM MODIFICATIONS Re: Haddam Neck Plant The Commission has issued the enclosed Amendment No. 94 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendnent is in response to your application dated June 1,1987.

The license amendment revises the heat-up rate curve (Figure 3.4-8) and also provides a larger interval for which the low-temperature over pressuri-zation protection system (LTOPS) must be placed into operation. More specifically, the proposed heat-up rate change results in a pressure / temperature limit curve shift. This shift increases the temperature range over which the LTOPS can effectively be placed into operation and decreases the probability of operator error during plant heat-up and cooldown operations.

A copy of the Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.

i Sincerely, c S gw rancis

-Q

. Akstulewicz, Jr# Project Manager Integrated Safety Assessment Project Directorate 3 Division of Reactor Projects - III, IV, V j and Special Projects J

Enclosures:

1. Amendment No.94to Licentie No. DPR-61 . I
2. Safety Evaluation .

cc w/ enclosures:

See next page l l

- l Mr. Edward J. Mroczka -

C:nn:cticut Yankee Atomic Power Company Haddam Neck Plant ~

Cc' s Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit.

' Counselors at Law Department of Environmental' y City Place . Protection

' Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Manager RFD #1 Generation Facilities Licensing

' Post Office Box 127E Northeast Utilities Service. Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 '

Wayne D. Romberg Vice President, Nuclear Operations Donald 0. Nordquist, Director Northeast Utilities Service Company Quality Services Department .

Post Office Box 270 Northeast Utilities Service Department Hartford, Connecticut 06141-0270 Post Office Box 270 IBoard of Selectmen Town Hall '

Haddam, Connecticut 06103 l I

Bradford S. Chase, Under Secretary l Energy Division 1

-Office of Policy and Management ,

80 Washington Street .I Hartford, Connecticut 06106 L

. Resident Inspector j Haddam Neck Nuclear Power Station c/o U.S. NRC P. O. Box 116 East Haddam Post Office East Haddam, Connecticut 06423 Regional ^ Administrator, Region 1 J U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l

L j .

1

-. _ - - - _ - - -- -- >