05000416/LER-1983-013, Forwards LER 83-013/99X-0: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 32: Line 32:


=text=
=text=
{{#Wiki_filter:
{{#Wiki_filter:G MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 February 15, 1983                      .
w A S ANT    P ES NT Office of Inspection & Enforcement                                            g U. S. Nuclear Regulatory Commission Region 11                                                                      1 101 Marietta St., N.W.,    Suite 3100                                        N
                                                                                    ~~
Atlanta, Georgia 30303
                                                                                      .c.
Mr. J. P. O'Reilly, Regional Administrator Attention:
 
==Dear Mr. O'Reilly:==
 
==SUBJECT:==
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Fire Doors Blocked Open to Support Plant Testing LER 83-013/99 X-0 AECM-83/0106 Cn January 19, 1983, while in cold shutdown, three doors in the Auxiliary Building were blocked open to support plant testing. Fire watches were established in accordance with Technical Specification 3.7.7. Attached is Special Report LER 83-013/99 X-0.
Yours truly, JPM: sap                                      /crZN8%y/7 Attachment.
cc:    Mr. N. L. Stampley (w/a)
Mr. R. B. McGehee (w/o)
Mr. T. B. Conner (w/o)
Mr. G. B. Taylor (w/o)
Mr. Richard C. DeYoung, Director (w/a)
Office of Incpection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O F]qq:; g (,  ,
8302220369 830215, PDR ADOCK 0500041o                                                    -7 'd    4 c:Le g                  PDR Member Middle South Utilities System                        i
}}
}}


{{LER-Nav}}
{{LER-Nav}}

Latest revision as of 11:09, 6 January 2021

Forwards LER 83-013/99X-0
ML20065B035
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/15/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20065B037 List:
References
AECM-83-016, AECM-83-16, NUDOCS 8302220369
Download: ML20065B035 (1)


LER-2083-013, Forwards LER 83-013/99X-0
Event date:
Report date:
4162083013R00 - NRC Website

text

G MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 February 15, 1983 .

w A S ANT P ES NT Office of Inspection & Enforcement g U. S. Nuclear Regulatory Commission Region 11 1 101 Marietta St., N.W., Suite 3100 N

~~

Atlanta, Georgia 30303

.c.

Mr. J. P. O'Reilly, Regional Administrator Attention:

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Fire Doors Blocked Open to Support Plant Testing LER 83-013/99 X-0 AECM-83/0106 Cn January 19, 1983, while in cold shutdown, three doors in the Auxiliary Building were blocked open to support plant testing. Fire watches were established in accordance with Technical Specification 3.7.7. Attached is Special Report LER 83-013/99 X-0.

Yours truly, JPM: sap /crZN8%y/7 Attachment.

cc: Mr. N. L. Stampley (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Incpection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O F]qq:; g (, ,

8302220369 830215, PDR ADOCK 0500041o -7 'd 4 c:Le g PDR Member Middle South Utilities System i