05000416/LER-1983-003, Forwards LER 83-003/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-003/01T-0
ML20070Q161
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/21/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20070Q176 List:
References
AECM-83-49, NUDOCS 8301260443
Download: ML20070Q161 (1)


LER-1983-003, Forwards LER 83-003/01T-0
Event date:
Report date:
4161983003R00 - NRC Website

text

'

M!SSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N. MI S SIS SIP PI 9205 January 21, 1983

}

JAMES P. McGAUGHY, JR.

Cf ASSISTANT VICE PRESIDENT

  • o Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II a

101 Marietta St.,

N.W., Suite 3100

=

Atlanta, Georgia 30303 Attention:

Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT: Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 IRM Functional Test Not Performed Within the Required Time Period LER 83-003/01 T-0 AECM-83/49 On January 8, 1983, a Limiting Condition for Operation was entered under Technical Specification 3.3.1 due to the Intermediate Range Monitor Functional Test not being performed within the required time period. The event is reported pursuant to Technical Specification 6.9.1.12.b.

Attached is 1.ER 83-003/01 T-0.

Yours trulv, wfC

/

t.-

JPM:aap 4 7,jf // %7ph Attachment

/

cc:

Mr. N. L. Stampicy (w/a) l Mr. R. B. McGehee (w/c)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung Director (w/a)

Office of Inspection & Enforcenent U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission l

Washington, D. C. 20555

.g l

gDRADOCK 05000416

, d}.D ' '

8301260443 g393y, Ab PDR

/

... ember Middle South Utilities System