Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld ML20195G4591999-06-10010 June 1999 Forwards MORs for May 1999 & Revised Repts for Apr 1999 for LGS Units 1 & 2 ML20195H0531999-06-0909 June 1999 Forwards Revised Bases Pages B3/4 10-2 & B3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7701999-06-0707 June 1999 Provides Notification of Change to NPDES Permit PA0052221, for Bradshaw Reservoir Facility Which Supports Operation of Lgs,Units 1 & 2,per EPP Section 3.2 ML20195C7631999-06-0101 June 1999 Notifies NRC That PECO Energy Has Completed Installation of New Large Capacity,Passive Strainers on RHR & Core Spray Sys Pump Suction Lines at Lgs,Unit 2,in Response to Ieb 96-003 ML20195D5381999-05-26026 May 1999 Forwards 1998 Occupational Exposure Tabulation Rept for LGS Units 1 & 2. Encl Is Diskette & Instructions.Rept Is Being re-submitted to Reset 12 Month Time Period.Without Disk ML20195B2821999-05-24024 May 1999 Requests That NRC Distribution Lists for LGS Be Updated. Marked-up Distribution List Showing Changes Is Attached ML20196L2891999-05-20020 May 1999 Provides Status Update of Thermo-Lag 330-1 Fire Barrier Corrective Actions,Iaw Commitments Made in ML20195B2951999-05-20020 May 1999 Forwards Rev 0 to LGS Unit 2 Reload 5,Cycle 6 COLR, IAW TS Section 6.9.1.12.Values Listed Have Been Determined Using NRC-approved Methodology & Are Established Such That All Applicable Limits of Plants Safety Analysis Are Met 05000352/LER-1999-003, Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv1999-05-19019 May 1999 Forwards LER 99-003-00,re Rps,Pcrvics Actuations.Ler Contains Special Rept Info for HPCI & Reactor Core Isolation Cooling Sys Injections Into Rv 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 9904191999-05-18018 May 1999 Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 ML20206E2001999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept (Non- Radiological) for Limerick Generating Station,Units 1 & 2. Rept Submitted IAW Section 5.4.1 of App B of Fols,Epp (Non- Radiological) & Describes Implementation of EPP for 1998 ML20206D8801999-04-27027 April 1999 Forwards Rev 2 to LGS Unit 1 Reload 7,Cycle 8 COLR, IAW TS Section 6.9.1.12.COLR Provides cycle-specific Parameter Limits for Noted Info ML20206A5461999-04-21021 April 1999 Responds to Conference Call Between Util & NRC on 990420,re TS Change Request 98-07-2,revising TS Section 2.0 to Incorporate Revised MCPR Safety Limits.Attached Ltr Contains Info Requested ML20205T0441999-04-17017 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept 15, IAW TS Section 6.9.1.7.REMP for 1998,confirmed That LGS Environ Effects from Radioactive Release Were Well Below LGS TSs & Other Applicable Regulatory Limits ML20205Q7581999-04-15015 April 1999 Forwards Response to RAI Re ISI Program First & Second 10-Yr Interval Relief Requests.Revs to Identified by Vertical Bar in Right Margin 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20235T8911989-01-18018 January 1989 Forwards Endorsements 130 & 131 to Nelia Policy NF-164, Endorsements 107 & 108 to Maelu Policy MF-44,Endorsements 94 & 95 to Nelia Policy NF-107,Endorsements 110 & 111 to Nelia Policy NF-220 & Endorsements 97 & 98 to Maelu Policy MF-73 ML20196L5401988-07-0505 July 1988 Confirms 880705 Telcon Re Updated Antitrust Review for Facility.Nrc Agrees That Company Has Until 880815 to Respond to Request ML20235B2741987-02-19019 February 1987 FOIA Request for Documents Indicated on Encl Docket Sheets. Request Does Not Encompass Matl Already Available in PDR or Lpdr Denoted by Three or Four Asterisks on List ML20209G1461986-09-0909 September 1986 Requests Issuance of Subpoena for Rt Brown to Testify at Hearing Re Adequacy of Communications Sys Used to Mobilize Manpower Necessary to Evacuate State Correctional Institute in Graterford,Pa ML20214M6501986-09-0909 September 1986 Advises That Licensee Will Not Respond to Air & Water Pollution Patrol 860826 Response to Testimony Re Remand Hearing on Bus Drivers for Oj Roberts & Spring-Ford School Districts,Per Clements .Related Correspondence ML20214M6961986-09-0808 September 1986 Recommends Denial of Rl Anthony 860821 & 25 Petitions for Relief Per 10CFR50.100 & for Ofc of General Counsel Review of NRC 10CFR2.206 Decisions ML20205C4711986-08-0808 August 1986 Forwards 860808 Testimony of Vs Boyer & R Bradshaw Re Remand Hearing on Availability of Bus Drivers for Oj Roberts & Spring-Ford School Districts.Related Correspondence ML20212A7241986-07-24024 July 1986 Notifies That Testimony Presented at 860818 Hearing Will Reflect Revised Number of Volunteer Bus Drivers in Event School Evacuation Necessary ML20211Q1601986-07-21021 July 1986 Advises of Attempts to Deliver Volunteer Sheets of 570 Util Employees Agreeing to Drive Buses in Event of School Evacuation to Limerick Ecology Action (Lea) Headquarters. Related Correspondence ML20206P7421986-06-27027 June 1986 Forwards & Revised Proposed Stipulation in Response to PEMA Request for Changes to Stipulation Re Remanded Issue.Certificate of Svc Encl.Related Correspondence ML20206P9031986-06-26026 June 1986 Corrects Proposing Resolution of Remanded Issue Re Availability of School Bus Drivers for Oj Roberts & Spring-Ford School Districts.Correct Date of Stipulation Re Medical Svcs Is 860616 Instead of 851115 ML20206P7801986-06-25025 June 1986 Responds to AR Love,Counsel for Graterford Inmates,860618 Ltr Accusing Author of Providing ASLB Chairman H Hoyt W/ Trade Publications Re Emergency Planning Requirements. Attempt to Influence Chairman Denied ML20199E5131986-06-19019 June 1986 Forwards Affidavits of AL Bigelow & Vs Boyer Re Availability of Volunteer School Bus Drivers for Oj Roberts & Spring-Ford School Districts in Event of Evacuation,Per ML20199E6881986-06-18018 June 1986 Responds to Re Ex Parte Filing of Offsite Emergency Planning for Nuclear Power Plants:Case of Govt Gridlock. Ex Parte Filings by Rader Seen as Contributing to Lack of Impartiality.Related Correspondence ML20206D7631986-06-16016 June 1986 Forwards Licensee Proposal for Resolution of Remanded Issue Re Availability of School Bus Drivers for Oj Roberts & Spring-Ford School Districts,Per ASLB 860522 Order, Supporting Affidavits & Proposed Stipulation ML20211E7421986-06-11011 June 1986 Forwards Graterford Inmates Response to Aslab 860603 Order. W/O Encl.Related Correspondence ML20198E3721986-05-19019 May 1986 Advises That Excess Flow Check Valves,Described in Dec 1985 License Amend Application Can Be Tested During Plant Operation Using Addl Personnel & Special Procedures.Need for Amend Unaffected.Certificate of Svc Encl ML20197G7961986-05-13013 May 1986 Forwards,For Info,Delaware River Basin in Commission 860427 Revs 5 & 6 to Docket D-69-210 CP Re Dissolved Oxygen Limitations for Temp Constraints & Consumptive Use Allocations.Related Correspondence ML20203P9401986-05-0505 May 1986 Informs That Unit 1 Shut Down on 860502 for Approx 6 Wks During Which All Tests on Excess Flow Check Valves & Other Containment Isolation Valves Will Be Performed.Related Correspondence ML20203E4851986-03-12012 March 1986 FOIA Request for Effluent Rept 3 Submitted Under Encl Ltr. W/O Ltr ML20154L1531986-03-0606 March 1986 Forwards Appeal Board 850805 & Board 831115 Orders & Util to Nrc,Cited in 860219 Answer to Anthony late-filed Petition for Leave to Intervene,Per 860305 Request ML20140D9111986-01-28028 January 1986 Requests Denial of Rl Anthony 860117 Request for Suspension of License & Finding That Util Violated Conditions of License NPF-39 Due to Pending Application for Supplemental Cooling Water Supply ML20154B9491986-01-24024 January 1986 Forwards 851216 Application for Approval of Temporary Substitution of in-stream Monitoring of Dissolved Oxygen Levels in Place of 59 F Constraint on Withdrawals,Filed W/ State of DE River Basin Commission.Related Correspondence ML20138R4571985-12-24024 December 1985 Forwards Procedure M1-18, Decontamination & Treatment of Radioactively Contaminated Patient at Montgomery Hosp. Related Correspondence ML20138R4701985-12-24024 December 1985 Forwards Procedure M1-18, Decontamination & Treatment of Radioactively Contaminated Patient at Montgomery Hosp. Related Correspondence ML20137T2381985-12-16016 December 1985 Advises That 851213 Encl Figures May Be Illegible.Figures Taken Directly from Fsar.W/O Encl.Related Correspondence ML20137U1981985-12-0505 December 1985 Submits Correction to Transcript of Author 851204 Oral Argument on Fourth Partial Initial Decision.Substantive Changes on Pages 47 to 70 Should Be Made ML20136J1971985-11-20020 November 1985 Notifies That Author Will Appear to Present Oral Argument on 851204 on Behalf of Util Re Appeals of Fourth Partial Initial Decision,In Response to 851024 & 1106 Orders.Related Correspondence ML20133L7261985-10-22022 October 1985 Forwards Commonwealth of PA Court Decision Finding Bucks County & Neshaminy Water Resources Authority Obligated to Complete Point Pleasant Project.Related Correspondence ML20133J0491985-10-16016 October 1985 Lists Misspellings & Errors in Transcript of Author 851011 Oral Argument Before Aslab Re Third Partial Initial Decision ML20136C8271985-10-0404 October 1985 Forwards Delaware River Basin Commission 851002 Emergency Certification Granting Application for Use of Schuylkill River Whenever Flow at Pottstown Gage Over 415 Cubic Ft/ Second.Related Correspondence ML20133B0821985-09-30030 September 1985 Informs of Appearance to Present Oral Argument on 851011 Re Appeals of Third Partial Initial Decision in Proceeding,Per 850829 Order.Related Correspondence ML20136A8171985-09-23023 September 1985 Forwards Util Application W/Delaware River Basin Commission for Approval of Withdrawal of Water from Schuylkill River for Consumptive Use & Revised Application Permitting Release from Beachwood Pit.Related Correspondence ML20137Q4971985-09-18018 September 1985 Responds to Mi Lewis Request to Lift or Retract Cp.Petition for Relief Under Section 2.206 Should Be Denied.Puc of PA Recommended Decision Only Basis for Petition ML20137P9411985-09-17017 September 1985 Comments on ALAB-813,including Issuance of Final Findings Not Prerequisite to Authorizing Full Power OL & Error in Curtailing cross-exam Insufficient to Warrant Appellate Relief.Related Correspondence ML20137L4591985-09-0909 September 1985 Advises That Author,Atty for Graterford Inmates,Will Be Unavailable Until 851001.Related Correspondence ML20136A9731985-09-0404 September 1985 Forwards 850813 Notice of Commission Action Approving Application to Delaware River Basin Commission for Approval of Use of Consumptive Water Saved by Curtailment of Listed Plants,Per .Related Correspondence ML20133L8931985-08-0808 August 1985 Forwards Notice of Appeal Re Denial of Stay & Accompanying Memorandum of Law.W/O Encl.Related Correspondence ML20132E3341985-07-30030 July 1985 Informs That Applicant Will Not Respond to Air & Water Pollution Patrol Brief Until 30 Days After Svc of Appeal Brief to Be Filed by Graterford Inmates,Per 850725 Notice of Appeal,Unless Otherwise Directed by Appeal Board ML20126K7831985-07-26026 July 1985 Forwards Comments of Intervenor Graterford Prisoners,Per 850723 Order.W/O Encl.Related Correspondence ML20126L0031985-07-25025 July 1985 Forwards Graterford Inmates Notice of Appeal.W/O Encl. Related Correspondence ML20129C3171985-07-25025 July 1985 Advises That Delaware River Basin Commission Withholding Action on Addl Supplemental Water for Unit 1 Until NRC Authorizes Issuance of Full Power Ol.Requests Action on Full Power License as Soon as Possible ML20137S4861985-07-17017 July 1985 Forwards Util 850603 Application Under Section 3.8 of Delaware River Basin Compact for Use of Water from Beechwood Pit.Related Correspondence ML20128H1591985-07-0303 July 1985 Forwards Testimony of Jd Case.Related Correspondence ML20128F4121985-07-0303 July 1985 Advises of Return of Subpoena to Rl Morris Signed by ASLB on 850628.Morris Gave Deposition Voluntarily at Ofc on 850703 as Result of Arrangements Among Counsel Rather than at Time & Place Listed in Subpoena.Related Correspondence ML20128A2831985-06-28028 June 1985 Requests That ASLB Issue Subpoena Directing Rl Morris to Appear on 850702 in Philadelphia,Pa for Deposition.Rl Morris,Principal Witness Identified by Love on Contention Re Evacuation Time for Graterford.Related Correspondence ML20127L8131985-06-20020 June 1985 Forwards Revised Page 11 to Correct Typo in Applicant Renewed Motion for Exemption from 10CFR50.47(a) Requirements Per Two Contentions Admitted on Behalf of Graterford Prisoners During Litigation Period ML20126J8711985-06-10010 June 1985 Forwards Notice of Delaware River Basin Commission Action Re Temporary Mod to Increase Frequency of Water Withdrawn from Schuylkill River.Some Copies May Have Been Incorrectly Reproduced.Related Correspondence ML20126J7801985-06-0606 June 1985 Forwards 850603 Notice of Commission Action Re Temporary Mod of Delaware River Basin Decision for Facility,As Followup to .Related Correspondence ML20129A6121985-06-0303 June 1985 Forwards,For Info,Application Filed W/Delaware River Basin Commission for Approval for Use During 1985 of Consumptive Use Water Allocations of Titus Units 1,2 & 3 & Cromby Unit 2.Related Correspondence 1989-01-18
[Table view] |
Text
.
o
'l SUGARM AN & DENWORTH ATTOR N EYS AT LAW suitt oos susTE sio, NORTH AM ERICAN sue (DING ROB ERT J. SUGARM AN JOANNE R.DENWORTH 128 SOUTH BROAO STREET (aon m 44eo PH ILAD ELPHIA. P EN N SYLVANI A 19107 (215) 54 6-0662 ROBERT RAYMOND ELLIOTT, P. C.*
COUNSEL
- N oneessto en en September 3, 1982
. Mr. Harold Denton Director li Division of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 Washington, D.C. 20555 I
RE: Philadelphia Electric Co.
, 50-352 j 50-353
Dear Mr. Denton:
l This will supplement my letters to you dated July 6, j 1982, and August 13, 1982, regarding the necessity for reopening and reconsidering the construction permits for the above projects in light of the changes thereto, and the
- present conditions.
l l
Recently, in reviewing documents produced by Philadelphia Electric Company, we discovered a letter written by NRC staff dated January 5, 1981, copy enclosed, in which NRC staff committed to engage in a thorough review of the Point Pleasant diversion at the OL stage, due to the unavailability of detailed information at the CP stage. In our view, this letter makes it clear that there must be a thorough review of all aspects of the Point Pleasant diversion, and not only limited to so-called operating impacts, or those arising from " changes".
Despite the staff's intention, as expressed in the January 5, 1981 letter, it appears that such will not be the case, based on the Licensing Board SPCO of June 1, 1982 reaffirmed in its July 14, 1982 Order. The Board held that consideration will be limited to operating effects and to changes since the original CP proceeding.
in responding to our July 6, 1982 letter the staff in its At the same time, CQ3 July 9, 1982 letter to PECO, limited its information request ;
i to project changes since the 1973-75 period.
8209090010 820903 PDR O ADOCK 05000352 PDR
1 Mr. Harold Denton Page 2 September 3, 1982 The foregoing suggests that consideration of effects will be limited to those resulting from project changes since the earlier plan.
Indeed, in its response dated August 20, 1982, PECO not only construed the staff request in this limited fashion, but further limited itself to a comparison of the environmental impacts of the changes, and further indicated that the DRBC proceedings could be cited in lieu of discussing the actual impacts in many cases.
In this posture, there appears to be no assurance of the thorough environmental consideration committed by the staff in its letter of January 5, 1981, and also committed to the DRBC and EPA, as reflected in the DRBC proceedings of February 18, 1981. (Copy enclosed)
While there was an Environment Impact Statement in 1973, the staff relied on the DRBC EIS for matters regarding the Point Pleasant diversion, and the DRBC EIS said that the details were not sufficiently developed to evaluate the impacts of the intake at Point Pleasant. (DRBC EIS, at p34, copy enclosed)
Thus, unless present plans are changed, there will have been no thorough review of the Point Pleasant diversion at any time. Dramatic changes continue to occur. Most importantly, I wish to bring to your attention the action of the Pennsylvania Public Utility Commission on August 27, 1982 i ordering Philadelphia Electric Company to cancel or suspend construction on Unit 2. I request that the staff take note of this action by the Pennsylvania PUC that Unit 2 is not needed and will not be built at any time certain as determinative of the need and necessity for the construction.
In the context of our pending Request to Suspend, etc. it requires new consideration of alternative sources of cooling water supply in light of the necessity for only half of the previously required supplemental water cupply.
Also, I request that you take cognizance of the recent action of the Delaware River Basin Commission in accepting its Level B Study, and publishing its staff findings in the draft Background Report on Interstate Water Management in July, 1982, indicating that reevaluation of the adequacy of water in the Delaware River to support depletive uses without unacceptable consequences has led to a determination that l
such resources are inadequate.
l
Mr. Harold Denton Page 3 September 3, 1982 In addition, the Level B Study also establishes that depletive withdrawals in the non-tidal section of the river adversely affect dissolved oxygen levels at the upper end of the estuary, which is crucial to the passage of fish through that section of the river.
Thus, these changes together should lead to a determination by the NRC that the CP proceedings must be reopened, and reexamined in light of the present factual circumstances, leading to a determination that the depletive use of the water for Limerick Units 1 and 2 is no longer supportable, based on the findings of the PUC and DRBC.
Also, I would like to call your attention to the recent identification of various toxic substances in the Delaware River water, which is proposed to be transported into the Neshaminy and Perkiomen Creeks as a result of the project, this being information which was not available or considered at the CP stage. While seemingly this is a change in circumstance which should warrant consideration in the OL proceeding, the Board has indicated that absent a showing that the transfer of toxics is attributable to a change in the project design, this matter is foreclosed as having been decided at the CP stage. (Order of June 1, 1982, Order of July 14, 1982, at 10-11.) Yet this clearly seems a change in circumstance which requires consideration.
Finally, I would like to note for your attention the Board's Order of July 14, 1982, holding that impacts of the project on the Point Pleasant eligible historic district and the Delaware Canal, aricing through blasting and defacement of the area, are construction rather than operating impacts.
Since the review of the intake and the Point Pleasant aspects of the diversion were limited to the matters available to and reported by the DRBC, and the DRBC had no details on these subjects, design not having been far enough advanced at that time, these matters should further be considered as a change in the CP record requiring reconsideration of the conditions on the permits.
For more than a year now, by correspondence and at the Prehearing Conference, Del-AWARE has been calling on the NRC to conduct a thorough environmental review of the Point Pleasant project. For more than a year, we have been told that such a review would be forthcoming. (Correspondence inclosed) Only in June, 1982 were we informed that nstruction impacts should be separately addressed. Now that we have filed a formal Request under S 2.206, as suggested by the Licensing Board, and have seen the l
i
3 7 ..
- ? ,
~
Mr. Ilarold Denton Page 4 Septehber 3, 1982
.=
proceedings as they are developing, it..is clest that unless ~--
there is a substantial change in the thrust-and~ scope ofs the review, there will be no thorough evalua' tion 'of the Point Pleasant diversion. At the same time, the applicant han -
suggested that construction will begin en Decembe.r 15, 1982, thus as a practical matter prejudicing, if not ' foreclosing, opportunity for remedial action af ter that Eime.
In view of the necessity to address these satters in a timely fashion, I urge you to immediately initiate proceedings as requested in our letter of August 13, 1982. '
Specifically, I ask you to initiate a proceeding in the Commission. In the event of your failure to do,so promptly; --
we will have to consider other options that may be'6psn~_to-us.
Thank you for your consideration. , s S' cerely _
i
% n' fN Robert J.' ugai2man
~
RJS/amh -
s 9 -
=
(*
%, *e. y
,A.
p ,,
k l
~~
s
- 4. @i r*[,-'
- =
4 .
+
h
g 3 ...,,c. .,. m ..is , t.,,y t.t.... ... . . . a'
- v. e.un.n... m. o a:.<u..> jn g,i .f j 3; av
?.? ( '
.se j ~ ~ (. .
- c. : .o;;.;,. *~
o I >i utn:i: A i : . ,;g:,,;.,,3 JiiH : r...ii et Hos. 50-352 L
and 50-353 lit J -J b' "d Id k~' ~--~~
JAN 0 S 1981
> -- -. ... _ q Mr. Vincent Boyer ,
Senior Vice Presiderd -
Nuclear Operations Philadelphia Elec t ric Company 73D1 Market Street Ph il.idelphia , Pennsylvania 19101 Deac Mr. Doyer:
SUBJfCT: Lll.L41CK RISr, ASSr% MENT S TUDY This is to thar.k jou .for your December 9,1980 presentation at Pot tstown, Penn .ylv.mia on your h -imerick R{ s k Assessment Study. 1.'e a re look ing forward io rec eipt of the final rnport so that we may be able to review the results in more det ail especially with rega rd to the proposed changes being considered fo r t he L imer ic k st at ion t o improve t he sa fety margins.
P.ct. u .e of the impor t a nce that the NRC places on yonr Risk Assessment Study fur t imerick we again reques t t hat ynu submit your final report as soon as po.sible.
In this regaid,' ue belit ve that it unuld be inappropria t e to com.ence review of your 1%AR prior to receipt. of your final Risk Assessuent S t udy Report . At the lot es t, the final report of the Risk Assessment. Study J
.huold be provided a< a part of your i SAR when it is tendered. -
During the course of the publ-ic meeting held on December 9, several specific issues were raised tha't will. receive part icular a tiention by the s t a f f.
~ ?,rcordingly, you should include a discuss ion of each of these mat ters whenever you ! em!cr your l SAR.
lA) The first arca doncerns a.mrw ncy preparedness as it ef fec t s special inst it ut iens. Rec o9n i z i ng tha t r m ergt ocy perparedness is an ongoing
..r t ivity, 3 0u shuuld p> ovide .uch infor ma t ion in your application paying pat ticular o ttention t o t hose local considera t ions that were discussed a t the public meet ing.
( Q Cooling water supply; and t he divers ion of Delauare River water was dis-
- msed by several participants at the meeting. He recognize that j,he [
finM design of the diversion project was not completed when the 1 inal favironmental Statement was issued for ynor Construction Permits. There-fore, the staff vill t horoughly review the environment al mpac ts
.mociated with ' diversion of Delaware River ua t er. This area should also be thoroughly diwussed in your icodered applicat ion.
N i/
m' ~' uasoM A t
/, ~u:-
/ u i
'[c r
E :!
(
)
The construction of one of the facilities structures was stated to be located on the right-of-way of a public road that runs through the site. inc A specific discussion, 1
i in your application. *
~ L
'~
{
J
)
During the course of construction at the site, the staff expressed'some It concern about the final design and construction of the spray pond.
is our undcrstanding that this will be the ultimate heat sink and therc- ;
fore must be designed and constructed in compliance with appropriate f regulations and guides. You should address the subject thoroughly in i
f your tendered application so that the staf f can provide an adequate and wy timely review of this item in view of our understand'ing that construction f of the spray pond will start next spring.
i
-you have any questions, please contact the. Project Sanager, D. Sells at n? a!
r: .
- 01) /192-7792.
b '
Sincerely, Rd 2W
- - Q h 3 .AjaD h ym P,obert L, Tedesco, Assistant Director . phy
%sy for 1-icensi,ng ,
Division of Licensing y.@.'
7 Je . .
t TZ"
_- ; [^!?}
l' w" t' .
q q
> q iSw.
i 2
- - , <e 1
M
)
... ..Y.
.V "
i cg f 60
- W
.. ;f Pfry f fO:.
%fC
-7.- 7 J
e e s. , -
\M m,,
M $.
t+ -
- . L. d
,; s u , .
I.
. g '5
~
0 .
June 4, 1981 Mr. Robert L. Tedesco Assistant Director for Licensing Department of Licensing U.S. I;uclear Regulatory Commission Washington, D. C. 20555
Dear I.:
- t. Tedesco:
I represent Del-AWARE Unlimited, Inc., a member-ship organization which is concerned with those aspects of the Philadelphia Electric Company nuclear facility at Lim-erick, Pennsylvania uhich involve diversion of water from the Delaware Fiver. I:y clients have been particularly con-corned with the consumptive use of scarce water resources, mechanisms for provision of storage, and the physical and biological impacts on the affected streams, including the Delaware, the 1:eshaminy, and the Perhiomen, uhich will be attributable to the proposed system.
We understand from various sources that the I;RC uill shortly be studying this proposed diversion in con-nection with a supplement to the EIS for an operating per-tsit for the Lir.:erick plant. 1:y clients have a number of concerns and facts which have not been addressed or con-sidered in the prior invironmental Impact Statement, which, in our view, reouire a further Environmental Impact State-nent, including an interdisciplinary study and opportun-ity for full public comment, prior to the filing of any supplcraental EIS or any supplement to the EIS. The in-forn,ation that we have is unclear as to uhat is envisioned by NRC, as well as to when opportunities will be provided for public input, concerning the scope of the studies and the procedures to be followed , as well as the disciplines to be involved. I would appreciate being inforr.ed as to your plans and the current status, and request that ny client be included in project planning and inplerantation, as appropriate.
Sincerely
e' I-L[a.-e.q-
.. ! i. '
1 June 19, 1981 Mr. Robert Tedesco Assistant Director for Licensing Department of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Tedesco :
Enclosed is a copy of my letter of June 4, 1981, regarding an Environmental Impact Statement Supplen,ent for the Philadelphia Electric Company proposed nuclear facil-ity at Limerick, Pennsylvania, requesting to be notified as to the present status and your plans for this matter.
I would appreciate receiving a reply to this letter.
Sincerely, Robert J. Sugarnan
(* .
\
[<t>? .
.,g f*
UNITED STATES
' Y~
g
~
y y ; .,, g g NUCLEAR REGULATORY COMMISSION ~
- ,' ;C W ASHING TON, D. C. 20555 9
'=*** l'juN 2 2.1981 Docket Nos. 50-352 and 50-353 Mr. Robert J. Sugarman Berle, Butzel, Kass & Case 45 Rockefeller Plaza New York, New York 10111
Dear Mr. Sugarman:
Reference is made to your letter of June 4,1981, relative to the diversion j of water from the Delaware River for the Limerick Generating Station (LGS).
We are currently conducting an acceptance review of the application for operating licenses for LGS tendered on March 17, 1981. If it is determined that the application contains sufficient information to initiate a licensing review, it will be docketed. After docketing, members of our staff will 1-conduct a visit to the LGS site to review the expected environmental impacts
- of the proposed plant. During that visit, we will invite participation by interested members of the public which, in effect, constitutes the scoping
! process envisioned by CEQ. We will place you on the distribution list for our correspondence and thus you will be notified of this meeting.
Allocation of water in the Delaware River Basin is under the authority of the Federal Delaware River Basin Commission (DRBC). Philadelphia Electric Company -
(PECO) applied to that Commission for the required approval to obtain water necessary for the Limerick plant. This allocation was included in the DRBC's "
Comprehensive Plan for which the DRBC issued an Environmental Impact State-i ment in 1973. More recently the DRBC issued an environmental assessment on the i
final review of ther proposal by PEC0 for a reservoir pumping station and water transmission line project. On February 15, 1980 a negative declaration was i
issued by DRBC based on the environmental assessment of the PECO water project.
t You may wish to obtain the documents mentioned above from DRBC for further i information.
l Sincerely, i
kOg i Robert L. Tedesco, Assistant Director for Licensing Division of Licensing
[
l -
,af .f/6flTf0/85 l
k.
Cl! ANGE Ol' ADI;R L: .
ItOltEllT J. S UG AllM AN SUGARMAN AND DENWORT.
ATTOHNEY AT LAW SUITE 510 RM'rmmmmm NORTH AMERICAN BUILDING xistax4: x .xos % 4 0.12 x 121 SOUTil BROA1) STREET g .g I'HILADELPlilA. PA. 19107 (215) 54(A)162 2 3 3 3 fl AIN!!HIDGE NTHEET 1201 PENNSYLVANIA AVENUE. N.W.
Plf!LA 1)ELPHI A. PENNNYLVANI A 1914 6 January 15, 1982 w^"HINuroN. n.c. 20o04 (235) 732-5488 (202) 737-4400 Stephen H. Lewis, Esq.
U.S. Nuclear Regulatory Commission Office of the Executive Legal Director k'a s h i n g t o n , D.C. 20555 RE: Limerick Generating Station Docket 50-352, 50-353
Dear Mr. Lewis:
On June 22, 1981, Mr. Robert Tedesco informed me that I would be included in the distribution list for correspondence, and would be invited to a scoping meeting following docketing of the above application (copy enclosed). I have heard nothing fur-ther on this aspect of this matter.
I would appreciate your advising me of the present status of this sa a t t e r .
In view of the ongoing progress of the proceeding, I am copying the service list.
-1 Sincerely,9 ,
s N m . Q ,, - . . _
\- / s -
Robert .J. Sugarman RJS:nw Enclosure cc: Service List QWYO
,pa asc ,
o UNITED STATES
- /, C g NUCLEAR REGULATORY COMMISSION WASHINGTON D. C. 20555 Q ' Fj February 4, 1982 Robert J. Sugarman, Esq.
Sugarman and Denworth Suite 510 jM h North American Building 121 South Broad Street Philadelphia, PA 19107 In the Matter of PHILADELPHIA ELECTRIC COMPANY (Limerick Generating Station, Units 1 and 2)
Docket Nos. 50-352 and 50-353
Dear Mr. Sugarman:
This is in response to your letter to me of January 15, 1982 requesting information on the scheduling of the public " scoping" meeting referenced in Mr. Tedesco's letter to you of June 22, 1981. 'As indicated by Mr. Tedesco, the Staff does intend to hold a meeting in the vicinity of the Limerick plant to receive the views of members of the public on the environmental impacts associated with operation of the Limerick Generating Station.
These views are being sought as part of the process of preparation of the environmental impact statement ("EIS") which the Staff is required to prepare in connection with the licensing of operation of the Limerick facility. 10 C.F.R. 5 51.22, 6 51:26. This meeting is intended, in part, to afford members of the public the opportunity to comment upon the scope of the EIS, although the Commission's regulations do not presently require the Staff to undertake the " scoping" process set forth in the Council on Environmental Quality's regulations. 40 C.F.R. 9 1501.7.
This meeting is currently projected to be held some evening during the periodJjay 11-14, 1982., Since your name appears on the service list for the Limerick prMg, you will be notified of the date, time, and location of the meeting by a notice to be transmitted at least several weeks prior to the date of the meeting. That notice will also state the date, time, and location of a technical _ meeting between the Staff and Applicant to discuss preliminary Staff questions regarding the environ-cental impacts of facility operation. Members of the public will be welcome to attend that meeting as well, but only in an observer role.
~
I RECKEVKD 7
0tM Y FEB 9 1932 L.G. H._1 .1
- ) ?
If you have any further questions regarding this process, please do not j hesitate to contact me.
l Sincerely, l
i
//..%w4 l Steph n H. Lewis j Counsel for f4RC Staff cc:
Lawrence Brenner, Esq., Chairman Dr. Richard F. Cole Dr. Peter A. Morris Mr. Frank R. Romano Judith A. Dorsey, Esq.
Mr. Edward G. Bauer, Jr.
Troy B. Conner, Jr., Esq.
Mark J. Wetterhahn, Esq.
Mr. Marvin I. Lewis James M. ?!eill, Esq.
Joseph H. White III Environmental Coalition on fluclear Power Themas Gerusky Fent.sylvania Emergency Management Agency John Shniper Robert L. Anthony Alan J. !! ogee W. Wilson Goode William A. Lochstet Charles W. Elliott, Esq.
Walter W. Cohen Robert W. Adler Steven P. Hershey, Esq.
Donald S. Bronstein, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Board Panel Docketing and Service Section i
] (j3 N p/
(f l [t>R88Cgg 1
y ,,,(f( ,g UNITcD STATES NUCLEAR REGULATORY COMMISSION Ld&ds
- . ' //,. C WASWNGTON, D. C. 20555 / -
i '
May 6,1982 l
Robert J. Sugarman, Esq.
Sugarman and Denworth Suite 510 florth American Building 121 South Broad Street Philadelphia, PA 19107 In the Matter of PHILADELPHIA ELECTRIC COMPANY (Linerick Generating Station, Units 1 and 2)
Docket Nos. 50-352 and 50-353
Dear Mr. Sugarman:
In a February 14, 1982 letter I advised you that a meeting for the receipt of public input to the environmental impact statement to be prepared by the 14RC Staff regarding operation of the Limerick Generating Station was then scheduled for some evening during the period May 11-14, 1982, as part of the f4RC Staff's environmental site visit. The environnental site visit and public neeting have since been deferred until the late summer or early fall of 1982.
Since the Draf t Environmental Statement (DES) is not scheduled for issuance until May 1983, a late summer or early fall meeting will afford the Staff ample opportunity to take into account the comments of members of the public offered at the meeting in preparing the DES.
As indicated in my previous response, all persons and organizations on the service list for this proceeding will receive advance notification of the date and location of the public meeting. If I can be of any further assistance regarding this matter, please do not hesitate to contact ne.
Sincerely, Yb LO./A. NYk f Stephen H. Lewis Counsel for NRC Staff cc: see next page p1M
, d, (G'
~,. +. e:.., s (';
(m)
"' L3 t
'T@e @y%s m '
[$
cc:
3 Lawrence Brenner, Esq., Chairman Dr. Richard F. Cole Dr. Peter A. Morris Mr. Frank R. Romano Judith A. Dorsey, Esq.
Mr. Edward G. Bauer, Jr.
Troy B. Conner, Jr. , Esq.
Mark J. Wetterhahn, Esq.
Mr. Marvin I. Lewis James M. Neill, Esq.
Joseph H. White, III Dr. Judith H. Johnsrud Thomas Gerusky, Director Dir. , PA. Emer. Man. Agency John Shniper Robert L. Anthony Alan J. Nogee W. Wilson Goode William A. lochstet Charles W. Elliott, Esq.
Walter W. Cohen Robert W. Adler Steven P. Hershey, Esq.
Donald S. Bronstein, Esq.
Atomic Safety and Licensing Board Atomic Safety and Licensing Appeal Panel Secreta ry i
l i