ML17045A474: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


==Subject:==
==Subject:==
Docket No. 50-482: Revision of a Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Gentlemen:
Docket No. 50-482: Revision of a Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Gentlemen:
One procedure that implements the WCGS RERP has been revised.
One procedure that implements the WCGS RERP has been revised. The revised document is identified below: Procedure EPP 06-009, Rev. 11 Effective Date January 24, 2017 The attached summary of the changes to the implementing procedure explains that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments.
The revised document is identified below: Procedure EPP 06-009, Rev. 11 Effective Date January 24, 2017 The attached summary of the changes to the implementing procedure explains that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments.
If you have any questions concerning this matter, please contact me at (620) 364-4204.
If you have any questions concerning this matter, please contact me at (620) 364-4204.
CRH/rlt  
CRH/rlt  
Line 28: Line 26:
==Attachment:==
==Attachment:==


Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) cc: K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a N. H. Taylor (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Attachment to RA 17-0008 Page 1 of 1 Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) 1. Procedure EPP 06-009, "Drill and Exercise Requirements,"
Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) cc: K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a N. H. Taylor (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Attachment to RA 17-0008 Page 1 of 1 Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) 1. Procedure EPP 06-009, "Drill and Exercise Requirements," Rev. 11 This revision provides enhanced guidance for scenario package development and for drill and exercise critique participation.
Rev. 11 This revision provides enhanced guidance for scenario package development and for drill and exercise critique participation.
Step 7.3.4.7 was added so scenario conduct information will be included in each specific scenario section, instead of being included in the narrative summary for a scenario.
Step 7.3.4.7 was added so scenario conduct information will be included in each specific scenario  
: section, instead of being included in the narrative summary for a scenario.
Step 7.5.1 was changed to document that drill, exercise and emergency critiques involve all participants, controllers and evaluators.
Step 7.5.1 was changed to document that drill, exercise and emergency critiques involve all participants, controllers and evaluators.
Because the established critique process and the required content of drill and exercise scenarios did not change, these changes did not reduce the effectiveness of the WCGS RERP. Additional editorial changes were made throughout this procedure to improve consistency in terminology and to comply with station procedure writing requirements.}}
Because the established critique process and the required content of drill and exercise scenarios did not change, these changes did not reduce the effectiveness of the WCGS RERP. Additional editorial changes were made throughout this procedure to improve consistency in terminology and to comply with station procedure writing requirements.}}

Revision as of 00:14, 8 July 2018

Wolf Creek - Revision of a Procedure That Implements the Radiological Emergency Response Plan
ML17045A474
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 02/09/2017
From: Hafenstine C R
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 17-0008
Download: ML17045A474 (2)


Text

i:* Cynthia R. Hafenstine Manager Regulatory Affairs U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 February 9, 2017 RA 17-0008

Subject:

Docket No. 50-482: Revision of a Procedure that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Gentlemen:

One procedure that implements the WCGS RERP has been revised. The revised document is identified below: Procedure EPP 06-009, Rev. 11 Effective Date January 24, 2017 The attached summary of the changes to the implementing procedure explains that these changes do not reduce the effectiveness of the WCGS RERP. This letter contains no commitments.

If you have any questions concerning this matter, please contact me at (620) 364-4204.

CRH/rlt

Attachment:

Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) cc: K. M. Kennedy (NRC), w/a B. K. Singal (NRC), w/a N. H. Taylor (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET Attachment to RA 17-0008 Page 1 of 1 Summary of Changes to One Procedure That Implements the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) 1. Procedure EPP 06-009, "Drill and Exercise Requirements," Rev. 11 This revision provides enhanced guidance for scenario package development and for drill and exercise critique participation.

Step 7.3.4.7 was added so scenario conduct information will be included in each specific scenario section, instead of being included in the narrative summary for a scenario.

Step 7.5.1 was changed to document that drill, exercise and emergency critiques involve all participants, controllers and evaluators.

Because the established critique process and the required content of drill and exercise scenarios did not change, these changes did not reduce the effectiveness of the WCGS RERP. Additional editorial changes were made throughout this procedure to improve consistency in terminology and to comply with station procedure writing requirements.