| {{#Wiki_filter:Dustin T. Hamman Director Nuclear and Regulatory Affairs August 08, 2022 RA 22-0061 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:Dustin T. Hamman Director Nuclear and Regulatory Affairs August 08, 2022 RA 22-0061 |
| | |
| | U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555- 0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Docket No. 50-482: Revision of One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) | | Docket No. 50- 482: Revision of One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) |
| | |
| Commissioners and Staff: | | Commissioners and Staff: |
| | |
| In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan. | | In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan. |
| Specifically, one form that implements the WCGS RERP has been revised. The revised document is identified below: | | Specifically, one form that implements the WCGS RERP has been revised. The revised document is identified below: |
| Forms Effective Dates EPF 06-001-08, Rev. 3 July 11, 2022 The attached summary of the changes to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP. | | |
| | Forms Effective Dates EPF 06-001- 08, Rev. 3 July 11, 2022 |
| | |
| | The attached summary of the changes to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP. |
| | |
| This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204. | | This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204. |
| Sincerely, Dustin Hamman DTH/ | | |
| | Sincerely, |
| | |
| | Dustin Hamman DTH/ |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) cc: S. S. Lee (NRC), w/a S. A. Morris, (NRC), w/a G. E. Werner (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a | | Summary of Changes to One Form that Implements the Radiological Emergen cy Response Plan (RERP) for Wolf Creek Generating Station (WCGS) |
| | |
| | cc: S. S. Lee (NRC), w/a S. A. Morris, (NRC), w/a G. E. Werner (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a Attachment to RA 2 2-0061 Page 1 of 1 |
| | |
| | Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) |
| | : 1. Form EPF 06- 001-08, OFF-SITE COMMUNICATOR CHECKLIST, Rev. 3 |
| | |
| | Form EPF 06- 001-08 is being revised to remove the need to distinguish between normal and non-normal working hour for ERO notifications. The standardization of the TSC activation to 75 minutes negates the need to distinguish between normal and non-normal working hours. The automatic dialing system (ADS) is to be used for ERO notification at all times. |
| | |
| | This change includes two administrative changes. In the Emergency Notifications block, Coffey County was changed to Coffey County Sheriff and Westar Generation Operations was changed to Ev ergy Generation Operations. These changes are being made to be consistent with the Immediate and Follow-up Emergency Notification forms. |
|
| |
|
| Attachment to RA 22-0061 Page 1 of 1 Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
| |
| : 1. Form EPF 06-001-08, OFF-SITE COMMUNICATOR CHECKLIST, Rev. 3 Form EPF 06-001-08 is being revised to remove the need to distinguish between normal and non-normal working hour for ERO notifications. The standardization of the TSC activation to 75 minutes negates the need to distinguish between normal and non-normal working hours. The automatic dialing system (ADS) is to be used for ERO notification at all times.
| |
| This change includes two administrative changes. In the Emergency Notifications block, Coffey County was changed to Coffey County Sheriff and Westar Generation Operations was changed to Evergy Generation Operations. These changes are being made to be consistent with the Immediate and Follow-up Emergency Notification forms.
| |
| These changes do not reduce the effectiveness of the Emergency Plan.}} | | These changes do not reduce the effectiveness of the Emergency Plan.}} |
|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML22339A0022022-12-0505 December 2022 Revision of One Procedure That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML22221A2562022-08-0808 August 2022 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML21349A9162021-08-19019 August 2021 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20336A0772020-11-30030 November 2020 Operating Cor - Revision of Six Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20191A0772020-07-0808 July 2020 Revision of Three Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20149K4512020-05-28028 May 2020 Revision of Five Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML20118C3902020-04-26026 April 2020 Revision of Four Procedures and Fourteen Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML19346D6692019-12-0505 December 2019 Summary of Changes to Two Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML19247C0712019-08-29029 August 2019 Revision of One Procedure and Two Forms That Implement the Radiological Emergency Response Plan ML19238A0682019-08-15015 August 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19225C6852019-08-0101 August 2019 Errata for Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) ML19100A1322019-03-28028 March 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan (RERP) ML19036A6162019-01-30030 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML19009A0942019-01-0303 January 2019 Summary of Changes to One Procedure That Implements the Radiological Emergency Response Plan ML18344A0512018-12-0303 December 2018 Summary of Changes to Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) ML18318A3152018-11-0606 November 2018 Summary of Changes to Four Procedures and One Form That Implement the Radiological Emergency Response Plan ML18283A3252018-10-0202 October 2018 Revision of Seven Procedures and Five Forms That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML18268A1362018-09-18018 September 2018 Revision of Four Procedures and Four Forms That Implement the Radiological Emergency Response Plan ML18268A1372018-09-18018 September 2018 Summary of Changes to Four Procedures and Four Forms That Implement the Wolf Creek Generating Station (WCGS) Radiological Emergency Response Plan (RERP) ML18178A1742018-06-21021 June 2018 Summary of Changes to Three Procedures That Implement Radiological Emergency Response Plan ML18093A4542018-03-22022 March 2018 Revision of One Form That Implements the Radiological Emergency Response Plan ML18026A6212018-01-0404 January 2018 Attachment to RA 18-0001, Summary of Changes to One Procedure EPP 06-006, Rev. 9A That Implements the Radiological Emergency Response Plan (RERP) ML18026A6202018-01-0404 January 2018 Transmittal of Revision 9A of EPP 06-006 Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17332A0402017-11-15015 November 2017 Summary of Changes to Five Procedures and Seven Forms That Implement Radiological Emergency Response Plan ML17137A3962017-05-0909 May 2017 Summary of Changes to a Procedure That Implements the Radiological Emergency Response Plan (RERP) ML17045A4742017-02-0909 February 2017 Revision of a Procedure That Implements the Radiological Emergency Response Plan ML16300A2112016-10-18018 October 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan (RERP) ML16263A3502016-09-13013 September 2016 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16208A1042016-07-13013 July 2016 Revision of Three Procedures and One Form That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML16139A8922016-05-0505 May 2016 Revision of Four Forms Which Implement the Radiological Emergency Response Plan ML16117A2782016-04-14014 April 2016 Revision of Two Procedures and One Form That Implement the Radiological Emergency Response Plan ML16061A0132016-02-25025 February 2016 Revision of Two Forms That Implement the Radiological Emergency Response Plan ML16020A3952016-01-14014 January 2016 Revision of a Procedure and a Form That Implement the Radiological Emergency Response Plan, Including Revision 3 to Procedure EPP 06-023 and Revision 3 to Form Epf 06-023-01 ML15357A0612015-12-10010 December 2015 Revision 14 to Form That Implements the Radiological Emergency Response Plan (Rerp), Epf 06-018-011, Technical Support Center Inventory Checklist. ML15013A2132015-01-0606 January 2015 Revision 16 to Radiological Emergency Response Plan, AP 06-002 ML0531104872005-10-28028 October 2005 Radiological Emergency Response Plant AP 06-002, Revision 7 ML0407607322004-03-10010 March 2004 Revision 6 to EPP 06-012, Dose Assessment. Corrected Copy ML0410604082004-03-0808 March 2004 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0402202942004-01-14014 January 2004 Revision 4 to EPP 06-11, Emergency Team Formation and Control, and Revision 3 to EPP 06-013, Exposure Control and Personnel Protection. ML0331802382003-11-0505 November 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures and Forms ML0328701392003-10-0303 October 2003 Radiological Emergency Response Plan Implementing Procedures and Forms ML0323704602003-08-0808 August 2003 Revised Epips, Including Epf 06-001-07, Rev. 0 and Epf 06-018-03, Rev. 3 ML0319706682003-07-0909 July 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedure & Forms ML0314304642003-05-16016 May 2003 Changes to Wolf Creek Radiological Emergency Response Plan Implementing Procedures and Forms ML0311305242003-04-17017 April 2003 Changes to Wolf Creek Generating Station - Radiological Emergency Response Plan Implementing Procedures & Forms ML0307002152003-03-0404 March 2003 Changes to Wolf Creek Generating Station Radiological Emergency Response Plan Implementing Procedures & Forms. Includes EPP 06-001, Revision 4, EPP 06-002, Revision 8, EPP 06-003, Revision 6, EPP 06-004, Revision 7, EPP 06-006, Revision 2 ML0302204832003-01-13013 January 2003 Changes to Wolf, Radiological Emergency Response Plan Implementing Procedures 2024-07-24
[Table view] Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
Dustin T. Hamman Director Nuclear and Regulatory Affairs August 08, 2022 RA 22-0061
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555- 0001
Subject:
Docket No. 50- 482: Revision of One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
Commissioners and Staff:
In accordance with 10 CFR 50.54(q)(5), WCGS is submitting a change to the emergency plan.
Specifically, one form that implements the WCGS RERP has been revised. The revised document is identified below:
Forms Effective Dates EPF 06-001- 08, Rev. 3 July 11, 2022
The attached summary of the changes to the implementing form explains that these changes do not reduce the effectiveness of the WCGS RERP.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely,
Dustin Hamman DTH/
Attachment:
Summary of Changes to One Form that Implements the Radiological Emergen cy Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
cc: S. S. Lee (NRC), w/a S. A. Morris, (NRC), w/a G. E. Werner (NRC), w/a Senior Emergency Preparedness Inspector (NRC), w/a Senior Resident Inspector (NRC), w/a Attachment to RA 2 2-0061 Page 1 of 1
Summary of Changes to One Form that Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
- 1. Form EPF 06- 001-08, OFF-SITE COMMUNICATOR CHECKLIST, Rev. 3
Form EPF 06- 001-08 is being revised to remove the need to distinguish between normal and non-normal working hour for ERO notifications. The standardization of the TSC activation to 75 minutes negates the need to distinguish between normal and non-normal working hours. The automatic dialing system (ADS) is to be used for ERO notification at all times.
This change includes two administrative changes. In the Emergency Notifications block, Coffey County was changed to Coffey County Sheriff and Westar Generation Operations was changed to Ev ergy Generation Operations. These changes are being made to be consistent with the Immediate and Follow-up Emergency Notification forms.
These changes do not reduce the effectiveness of the Emergency Plan.