ML20237F748: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project =  
| project = TAC:52418
| stage = Request
| stage = Request
}}
}}

Latest revision as of 14:28, 19 March 2021

Forwards Application for Amend to License NPF-3,modifying License Condition 2.F.(1) & Deleting Remaining Content from App B of Environ Tech Specs.Issuance of Amend Requested by 871231
ML20237F748
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/06/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237F750 List:
References
1371, TAC-52418, NUDOCS 8708130147
Download: ML20237F748 (1)


Text

________ _ - - -

.V i

I Docket No. 50-346 TOLEDO -

License No. NPF-3 EDISON l I

Serial No.'1371 DONALD C. SHELTON vos FWedent-Nutieer (419]249-2399 August-6, 1987 United States Nuclear Regulatory Commiasion Document Control Desk Washington, D. C. 20555 )

Subject:

License Amendment Application to Delete Appendix B, Environ-mental Technical Specifications (TAC No. 52418)  :

Gentlemen:

Enclosed is an application for an Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1. This application supersedes Item No. 3 contained in Toledo Edison's letter to your office dated August 18, 1983-(Serial No. 979). Item No. 3 involved deletion of certain sections of the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix B, Environmental Technical Specifications..

The enclosed application requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License be revised to modify License Condition 2.F.(1) and delete the remaining content of the Appendix B, Environmental Technical Specifications: Table of Contents and Sections 1.0, 3.1, 4.1 and 5.1 through 5.5. All actions required to satisfy the remaining Appendix B Specifications have been completed and therefore Appendix B may be deleted.

Toledo Edison requests that this amendment be approved and issued by December 31, 1987 and effective 14 days from issuance.

This application supercedes a portion (Item No. 3) of Toledo Edison's previous submittal dated Auguat 18, 1983 (Serial No. 979). Therefore, no license application fee per 10CFR170.12(c) is required.

Very trul yours, JSL:p1f  ;

Enclosure cc: DB-1 NRC Resident Inspector d A. B. Davis, Regional Administrator (2 copies) 8 l ,

State of Ohio i

THE TOLEDO EDISON COMPANY EOISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 8700130147 870D06 PDR ADOCK 05000346 P PDR