ML19210B381: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.AEC r IEUTION FOR PART 50 DOCKET MA
{{#Wiki_filter:.
-'AL (TEMPORARY FORM)
AEC r     IEUTION FOR PART 50 DOCKET MA             '
CONTROL NO:
AL (TEMPORARY FORM)                                 CONTROL NO:       7107 s
7107" s FILE: e FROM: DATE OF DOC DATE REC'D LTR MEMO RPT OTHER"etropolitan Edison Company Reading, Penn. 19603 Mr. J.C. Miller 9-13-73 9 21-73 X TO: ORIG CC OTHER SENT AEC PDR XXX SENT LOCAL PDR XXX A. Giambusso 1 CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
FILE:
:CCC 50 50-289 DESCRIPTION:
e FROM:                                   DATE OF DOC       DATE REC'D           LTR   MEMO     RPT       OTHER "etropolitan Edison Company Reading, Penn. 19603 Mr. J.C. Miller                         9-13-73         9 21-73               X TO:                                         ORIG           CC   OTHER                 SENT AEC PDR       XXX A. Giambusso                              1 SENT LOCAL PDR XXX CLASS     UNCLASS         PROP INFO         INPUT         NO CYS REC'D                 DOCKET NO:
ENCLOSURES:
:CCC                                             50                   50-289 DESCRIPTION:                                               ENCLOSURES:
Ltr. Notorized 9-17-73 in response to a meeting Report:" Report on Containment Building with AEC 8-29-73 trans the following.......
Ltr. Notorized 9-17-73 in response to a meeting           Report:" Report on Containment Building with AEC 8-29-73 trans the following.......                 Upper Vertical Tendon Displacement During Prestress."
Upper Vertical Tendon Displacement During Prestress." (50 cys anel re c'd)
                        -                                                  (50 cys anel re c'd)
-'A C K N^ O U'^~ W~ ~ G E D PLANT NAME: Three Mile Island Unit #1 7-e/.-+,-FOR ACTION /INFOR''ATION 9-24-73.T B BUTLER (L)
PLANT NAME: Three Mile Island Unit #1                                    e/.-+
SCWENCER(L)
                                                                                          'A C K N^ O U'^~ W~ ~ G E D
ZIEANN(L)REGAN(E)W/ Copies W/7 Copies W/ Copies W/ Copies CLARK (L)STOLZ(L)DICKER (E)
                                                                ,-      7-FOR ACTION /INFOR''ATION                   9-24-73       .T B BUTLER (L)       SCWENCER(L)             ZIEANN(L)               REGAN(E)
DO NOT REMOVE W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)VASSALLO(L)
W/ Copies         W/7 Copies               W/ Copies               W/ Copies CLARK (L)
KNIGHTCN(E)
W/ Copies STOLZ(L)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)SCHDiEL(L)
W/ Copies DICKER (E)
YOUNGBLOOD(E)
W/ Copies               W/ Copies DO NOT REMOVE GOLLER(L)         VASSALLO(L)             KNIGHTCN(E)
W/ Copies W/ Copies W/ Copies W/ Copies , s INTER'TAL DISTRIBUTION
W/ Copies         W/ Copies               W/ Copies               W/ Copies KNIEL(L)           SCHDiEL(L)               YOUNGBLOOD(E)
'G FIW TECH REVIE7 DENTON A/T IND LIC ASST/AEC PDR HENDRIE GRIMES BRAID'J.N*OGC, ROCM P-506A SCHROEDER GAMMILL DIGGS (L)SALTZMAN/MUNTZING/ STAFF
W/ Copies         W/ Copies               W/ Copies               W/ Copies
/MACCARY=#'KASTNER GEARIN (L)
    ,     s                               INTER'TAL DISTRIBUTION
CASE K4IGHT BALLARD 4 0ULBOURNE (L)
        'G FIW               TECH REVIE7         DENTON                                           A/T IND
PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L)MCDONALD BOYD SHA0 MAIGRET (L)
  /AEC PDR                 HENDRIE             GRIMES             LIC ASST                      BRAID'J.N
DUBE MOORE (L)(T4R)
* OGC, ROCM P-506A       SCHROEDER           GAMMILL           DIGGS (L)                     SALTZMAN
VSTELLO ENVIRO SERVICE (L)
  /MUNTZING/ STAFF       /MACCARY             =#'KASTNER           GEARIN (L)
DEYOUNG(L)(PWR)
CASE                   K4IGHT             BALLARD         4 0ULBOURNE (L)                 PLANS GIAMBUSSO               PAWLICKI           SPANGLER           LEE (L)                       MCDONALD BOYD                   SHA0                                   MAIGRET (L)                   DUBE MOORE (L)(T4R)       VSTELLO               ENVIRO             SERVICE (L)
HOUSTCN MULLER SHEPPARD (E)
DEYOUNG(L)(PWR)         HOUSTCN             MULLER             SHEPPARD (E)                 INFO SKOVECLT (L)           NOVAK               DICKER             SMITH (L)                     C. MILES P. COLLINS             ROSS               KNIGHTON           TEETS (L)
INFO SKOVECLT (L)
IPPOLITO           YOUNGBLOOD         WADE (E)                                     j
NOVAK DICKER SMITH (L)C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)IPPOLITO YOUNGBLOOD WADE (E)/ REG OP1 e/TEDESCO REGAN WILLIAMS (E) 15 j FILE & REGICN Q LONG PROJECT LDR WILSON (L)
/ REG OP1                 e/TEDESCO             REGAN             WILLIAMS (E)               15 FILE & REGICN Q         LONG               PROJECT LDR       WILSON (L)
' MORRIS (2.)
' MORRIS (2.)               LAINAS
LAINAS/ STEELE BENAROYA HARLESS^., , VOLIFER+'/EXTERNAL DIS RI3UTION
                                                                                                        ^
/-, VI - LOCAL PDR Pivouth. Wss.
/ STEELE                     BENAROYA           HARLESS                                                   .,       ,
#1 - DTI2(AIE;NATHY)?
VOLIFER                                                                   +         '/
(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /Lar.k.
    ,                                      EXTERNAL DIS RI3UTION                                             /-
VI - NSIC(BUCHANAN) 1- R.S c hoonrak e r ,0C, GT, D-323 1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/
VI - LOCAL PDR     Pivouth. Wss.
l-W. PINNINGTON, F= E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST.
  #1 - DTI2(AIE;NATHY)?                   (1)(2)(10)-NATIONAL LAB'S                           1-PDR-SAN /Lar.k.
1-CCNSULTANT'S 1-AGMED(WALTER KCESTER
VI - NSIC(BUCHANAN)                               1- R.S c hoonrak e r ,0C, GT, D-323       1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/                           l-W. PINNINGTON, F= E-201 GT               BROOKHAVEN NAT. LAB WOODARD/"H" ST.                           1-CCNSULTANT'S                             1-AGMED(WALTER KCESTER
/10-CYSACRSHOLDING NEWMARK/8LUME/AGBABIAN EM-C-427-GT l-GERALD ULRIKSON...ORNL
/10-CYSACRSHOLDING                                       NEWMARK/8LUME/AGBABIAN                     EM-C-427-GT l-GERALD ULRIKSON...ORNL               /1-RD.. MULLER..F-309 CT 4911070 h2                           g
/1-RD.. MULLER..F-309 CT 4911070 h2 g
 
:%. . . .. . . .
^
._ _ _ _ _ . . _ . . . _ _ _ .___.__ __ .__- . _ . -..--^j722*ronce no rooanass METROPOLITAN EDISON COMPANY
j722 ronce no rooanass METROPOLITAN EDISON COMPANY POST OFFICE BOX 542   READING. PENNSYLVANI A 19603                                                                     TE LEPHONE 215 - 929-26o1 September 13, 1973 3',lt3//
.____.__..__..__ _ _. __
W hl Mr. A. Giambusso                                                                                                                M hdb ,[' .
_ _ . - _ _ . - _ . _ _ _ _ . .__
Y O g3 'h Deputy Director for Reactor Projects United States Atomic Energy Commission Washington, D. C. 20545
POST OFFICE BOX 542 READING. PENNSYLVANI A 19603 TE LEPHONE 215 - 929-26o1 September 13, 1973
                                                                                                                                                $ $[?
.3',lt3//W hl M hdb ,[' .Mr. A. Giambusso Y O g3 'h''Deputy Director for Reactor Projects United States Atomic Energy Commission
d g, g'.t.,9{M g!
$ $[?d g, g'.t.,9{M g!Washington, D. C.
20545"


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND NUCLEAR STATION
THREE MILE ISLAND NUCLEAR STATION                                                                                   .}   a UNIT 1 DOCKET No. 50-289                                                                                       $); 1_81 -g\
.}a$); 1_81 -g\
UNIT 1 DOCKET No. 50-289


==Dear Mr. Giambusso:==
==Dear Mr. Giambusso:==


Enclosed please find fif ty (50) copies of our report entitled" Report on Containment Building Upper Vertical Tendon Displacement During Prestress." This report was prepared as a result of a meeting on this subject with members of the AEC Staff on August 29, 1973 at the Three Mile Island site. During this meeting members of the AEC Staff examined first hand the upper tendon bearing plates and sur-rounding concrete.
Enclosed please find fif ty (50) copies of our report entitled
The report describes the results of our investigation. There is no substantive evidence that any of the upper vertical tendon bearing plates have receded into the concrete. On the contrary, all evidence indicates that the concrete under these bearing plates is sound.Therefore, we are not planning to remove any of the upper vertical tendon bearing plates and are concluding our investigaticn as outlined in the enclosed report.
                    " Report on Containment Building Upper Vertical Tendon Displacement During Prestress." This report was prepared as a result of a meeting on this subject with members of the AEC Staff on August 29, 1973 at the Three Mile Island site. During this meeting members of the AEC Staff examined first hand the upper tendon bearing plates and sur-rounding concrete.
\\8 0%Very truly yours,$ NP_-y~A k N c, g,g'''e*'': 1584 322 h J. G. Miller d/g 6 Vice President kd CC: Mr. W. A. Verrochi p~r  
The report describes the results of our investigation. There is no substantive evidence that any of the upper vertical tendon bearing plates have receded into the concrete. On the contrary, all evidence indicates that the concrete under these bearing plates is sound.
.METROPOLITAN EDISON COMPANY JERSEY CENTRAL P0b'ER & LIGHT COMPA'iY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT 1 Application For Class 104b Utilization Facility Operating License DOCKET No. 50-289 Applicant submits by this document fif ty (50) copies of a report entitled " Report on Containment Building Upper Vertical
Therefore, we are not planning to remove any of the upper vertical tendon bearing plates and are concluding our investigaticn as outlined in the enclosed report.
-Tendon Displacement During Prestress" for Metropolitan Edison Three Mile Island Nuclear Station Unit 1.
                                          \\8                   0                                   Very truly yours,
" METROPOLITAN EDISON COMPANY ATTEST:-,_3 gy -",^_.''f R Secretary Vice President f fl.day of/.2 ' W a^ 1973.
                                    $ NP y                                                             _
Sworn to and subscribed before me this !7
A g,g k                                   N
.lw< !mt'.'C[wK ,'r'.v.Notary Public
                                                                                                            ~
.... il , $ '
c,                           ''
=,.'-F584 323}}
e*                                                                 ''
d          h 6                                                J. G. Miller                                     1584 322 Vice President
                                        /g kd CC:   Mr. W. A. Verrochi p
                                                                                                                                                      ~r
 
METROPOLITAN EDISON COMPANY JERSEY CENTRAL P0b'ER & LIGHT COMPA'iY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT 1 Application For Class 104b Utilization Facility Operating License DOCKET No. 50-289 Applicant submits by this document fif ty (50) copies of a report entitled " Report on Containment Building Upper Vertical                       -
Tendon Displacement During Prestress" for Metropolitan Edison Three Mile Island Nuclear Station Unit 1.
METROPOLITAN EDISON COMPANY ATTEST:
        ,     'f  _3                   gy -     ",^     R Secretary                             Vice President f         f            l Sworn to and subscribed before me this !7          day of/.2 ' W a^ 1973.
lw< !mt'.     .
v.
r'
                                                                        'C[wK Notary Public
                                                =                      . il , $ '
F584 323}}

Latest revision as of 04:41, 2 February 2020

Forwards Rept on Containment Bldg Upper Vertical Tendon Displacement During Prestress.,Prepared Subsequent to 730829 Meeting W/Aec at TMI-1 Site.Concrete Under Bearing Plates Sound.No Intention to Remove Plates.W/O Encl
ML19210B381
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/13/1973
From: John Miller
METROPOLITAN EDISON CO.
To: Giambusso A
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7911070703
Download: ML19210B381 (3)


Text

.

AEC r IEUTION FOR PART 50 DOCKET MA '

AL (TEMPORARY FORM) CONTROL NO: 7107 s

FILE:

e FROM: DATE OF DOC DATE REC'D LTR MEMO RPT OTHER "etropolitan Edison Company Reading, Penn. 19603 Mr. J.C. Miller 9-13-73 9 21-73 X TO: ORIG CC OTHER SENT AEC PDR XXX A. Giambusso 1 SENT LOCAL PDR XXX CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

CCC 50 50-289 DESCRIPTION: ENCLOSURES:

Ltr. Notorized 9-17-73 in response to a meeting Report:" Report on Containment Building with AEC 8-29-73 trans the following....... Upper Vertical Tendon Displacement During Prestress."

- (50 cys anel re c'd)

PLANT NAME: Three Mile Island Unit #1 e/.-+

'A C K N^ O U'^~ W~ ~ G E D

,- 7-FOR ACTION /INFORATION 9-24-73 .T B BUTLER (L) SCWENCER(L) ZIEANN(L) REGAN(E)

W/ Copies W/7 Copies W/ Copies W/ Copies CLARK (L)

W/ Copies STOLZ(L)

W/ Copies DICKER (E)

W/ Copies W/ Copies DO NOT REMOVE GOLLER(L) VASSALLO(L) KNIGHTCN(E)

W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L) SCHDiEL(L) YOUNGBLOOD(E)

W/ Copies W/ Copies W/ Copies W/ Copies

, s INTER'TAL DISTRIBUTION

'G FIW TECH REVIE7 DENTON A/T IND

/AEC PDR HENDRIE GRIMES LIC ASST BRAID'J.N

  • OGC, ROCM P-506A SCHROEDER GAMMILL DIGGS (L) SALTZMAN

/MUNTZING/ STAFF /MACCARY =#'KASTNER GEARIN (L)

CASE K4IGHT BALLARD 4 0ULBOURNE (L) PLANS GIAMBUSSO PAWLICKI SPANGLER LEE (L) MCDONALD BOYD SHA0 MAIGRET (L) DUBE MOORE (L)(T4R) VSTELLO ENVIRO SERVICE (L)

DEYOUNG(L)(PWR) HOUSTCN MULLER SHEPPARD (E) INFO SKOVECLT (L) NOVAK DICKER SMITH (L) C. MILES P. COLLINS ROSS KNIGHTON TEETS (L)

IPPOLITO YOUNGBLOOD WADE (E) j

/ REG OP1 e/TEDESCO REGAN WILLIAMS (E) 15 FILE & REGICN Q LONG PROJECT LDR WILSON (L)

' MORRIS (2.) LAINAS

^

/ STEELE BENAROYA HARLESS ., ,

VOLIFER + '/

, EXTERNAL DIS RI3UTION /-

VI - LOCAL PDR Pivouth. Wss.

  1. 1 - DTI2(AIE;NATHY)? (1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /Lar.k.

VI - NSIC(BUCHANAN) 1- R.S c hoonrak e r ,0C, GT, D-323 1-GERALD LELLCUCHE 1 - ASLB(YORE /SAYRE/ l-W. PINNINGTON, F= E-201 GT BROOKHAVEN NAT. LAB WOODARD/"H" ST. 1-CCNSULTANT'S 1-AGMED(WALTER KCESTER

/10-CYSACRSHOLDING NEWMARK/8LUME/AGBABIAN EM-C-427-GT l-GERALD ULRIKSON...ORNL /1-RD.. MULLER..F-309 CT 4911070 h2 g

^

j722 ronce no rooanass METROPOLITAN EDISON COMPANY POST OFFICE BOX 542 READING. PENNSYLVANI A 19603 TE LEPHONE 215 - 929-26o1 September 13, 1973 3',lt3//

W hl Mr. A. Giambusso M hdb ,[' .

Y O g3 'h Deputy Director for Reactor Projects United States Atomic Energy Commission Washington, D. C. 20545

$ $[?

d g, g'.t.,9{M g!

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION .} a UNIT 1 DOCKET No. 50-289 $); 1_81 -g\

Dear Mr. Giambusso:

Enclosed please find fif ty (50) copies of our report entitled

" Report on Containment Building Upper Vertical Tendon Displacement During Prestress." This report was prepared as a result of a meeting on this subject with members of the AEC Staff on August 29, 1973 at the Three Mile Island site. During this meeting members of the AEC Staff examined first hand the upper tendon bearing plates and sur-rounding concrete.

The report describes the results of our investigation. There is no substantive evidence that any of the upper vertical tendon bearing plates have receded into the concrete. On the contrary, all evidence indicates that the concrete under these bearing plates is sound.

Therefore, we are not planning to remove any of the upper vertical tendon bearing plates and are concluding our investigaticn as outlined in the enclosed report.

\\8 0 Very truly yours,

$ NP y _

A g,g k N

~

c,

e*

d h 6 J. G. Miller 1584 322 Vice President

/g kd CC: Mr. W. A. Verrochi p

~r

METROPOLITAN EDISON COMPANY JERSEY CENTRAL P0b'ER & LIGHT COMPA'iY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION UNIT 1 Application For Class 104b Utilization Facility Operating License DOCKET No. 50-289 Applicant submits by this document fif ty (50) copies of a report entitled " Report on Containment Building Upper Vertical -

Tendon Displacement During Prestress" for Metropolitan Edison Three Mile Island Nuclear Station Unit 1.

METROPOLITAN EDISON COMPANY ATTEST:

, 'f _3 gy - ",^ R Secretary Vice President f f l Sworn to and subscribed before me this !7 day of/.2 ' W a^ 1973.

lw< !mt'. .

v.

r'

'C[wK Notary Public

= . il , $ '

F584 323