{{#Wiki_filter:August 9, 2019 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant 8315 County Road 459 Steedman, MO 65077 SUBJECT: CALLAWAY UNIT 1
{{#Wiki_filter:ust 9, 2019
- INTEGRATED INSPECTION REPORT 05000483/2019002
 
==SUBJECT:==
CALLAWAY UNIT 1 - INTEGRATED INSPECTION REPORT 05000483/2019002


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On June 30, 2019 , the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant. On July 2, 2019 , the NRC inspectors discussed the results of this inspection with Mr. T. Herrmann, Site Vice President, and other members of your staff.
On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant. On July 2, 2019, the NRC inspectors discussed the results of this inspection with Mr. T. Herrmann, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.


The results of this inspection are documented in the enclosed report. The NRC inspectors did not identify any finding or violation of more than minor significance
The NRC inspectors did not identify any finding or violation of more than minor significance.
. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding
 
."
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely,
Sincerely,
/RA/ Neil F. O'Keefe, Chief Reactor Projects Branch B Docket No.: 05000483 License No
/RA/
.: NP F-30 Enclosure:
Neil F. O'Keefe, Chief Reactor Projects Branch B Docket No.: 05000483 License No.: NPF-30
 
===Enclosure:===
Inspection Report 05000483/2019002 With Attachments:
Inspection Report 05000483/2019002 With Attachments:
Documents Reviewed Request for Information Occupational Radiation Safety Inspection Request for Information Public Radiation Safety Inspection
Documents Reviewed Request for Information O
 
==Inspection Report==
Docket Number: 05000483 License Number: NPF-30 Report Number: 05000483/2019002 Enterprise Identifier: I-2019-002-0006 Licensee: Union Electric Company Facility: Callaway Plant Location: Steedman, MO 65077 Inspection Dates: April 1 to June 30, 2019 Inspectors: C. Alldredge, Senior Enforcement Specialist B. Baca, Health Physicist D. Bradley, Senior Resident Inspector R. Carrion, Senior Reactor Inspector P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, Senior Health Physicist S. Janicki, Resident Inspector J. O'Donnell, Health Physicist B. Tharakan, Senior Project Engineer D. You, Resident Inspector Approved By: Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects Enclosure


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a n integrated inspection at the Callaway Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at the Callaway Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
. List of Findings and Violations No findings or violations of more than minor significance were identified.
 
List of Findings and Violations No findings or violations of more than minor significance were identified.


Additional Tracking Items None.
Additional Tracking Items None.
3


=PLANT STATUS=
=PLANT STATUS=


Callaway began the inspection period at approximately 20 percent power with a planned shutdown in progress for the refueling outage.
Callaway began the inspection period at approximately 20 percent power with a planned shutdown in progress for the refueling outage. On April 1, 2019, the licensee shut down the reactor and commenced the planned refueling outage. On April 17, with the reactor defueled and in no Mode, safety-related bus NB01 lost power and was automatically reenergized by the associated emergency diesel generator due to a loss of the 365 kV switchyard bus (NRC Event 54005). On May 11, with the reactor in Mode 4, the licensee identified an auxiliary building door that had been blocked open through reactor Mode ascension (NRC Event 54061).


On April 1, 2019, the licensee shut down the reactor and commenced the planned refueling outage.
On May 16, the licensee commenced a reactor startup. Later that day, an automatic reactor trip occurred due to high flux in the source range (NRC Event 54069) when operators failed to block this trip when conditions called for them to do so. On May 17, the licensee commenced a reactor startup. On May 18, the licensee tripped the main turbine due to high vibrations and the reactor remained critical, by design, due to the low power level at the time of the turbine trip.


On April 17 , with the reactor defueled and in no Mode, safety
The licensee restored the main turbine to service and connected the main generator to the electric grid on May 19. The licensee reached full power on May 22 and remained at this power level through the end of the inspection period.
-related bus NB01 lost power and was automatically reenergized by the associated emergency diesel generator due to a loss of the 365 kV switchyard bus (NRC Event 54005). On May 11 , with the reactor in Mode 4, the licensee identified an auxiliary building door that had been blocked open through reactor Mode ascension (NRC Event 54061). On May 16 , the licensee commenced a reactor startup. Later that day, an automatic reactor trip occurred due to high flux in the source range (NRC Even t 54069) when operators failed to block this trip when conditions called for them to do so. On May 17 , the licensee commenced a reactor startup. On May 18 , the licensee tripped the main turbine due to high vibrations and the reactor remained critical, by design, due to the low power level at the time of the turbine trip. The licensee restored the main turbine to service and connected the main generator to the electric grid on May 19. The licensee reached full power on May 22 and remained at this power level through the end of the inspection period.


==INSPECTION SCOPES==
==INSPECTION SCOPES==
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-rm/doc-collections/insp
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
-Water Reactor Inspection Program - Operations Phase.The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP 71152, "Problem Identification and Resolution.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==


==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection     Summer Readiness Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.01|count=1}}


===Summer Readiness Sample (IP Section 03.01)===
The inspectors evaluated summer readiness of offsite and alternate alternating current (AC)power systems on June 5, 2019. The inspectors also reviewed the prioritization of efforts to restore offsite power to support Callaway, including a tour of the Ameren Transmission facility in St. Louis, for a design basis loss of offsite power event.
{{IP sample|IP=IP 71111.01|count=1}}
The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems on June 5, 2019. The inspectors also reviewed the prioritization of efforts to restore offsite power to support Callaway, including a tour of the Ameren Transmission facility in St. Louis, for a design basis loss of offsite power event.


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment     Partial Walkdown Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.04|count=4}}


===Partial Walkdown Sample (IP Section 03.01)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(4 Sample s) The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Essential service water trains A and B on April 22, 2019
: (1) Essential service water trains A and B on April 22, 2019
: (2) Emergency diesel generator train A on April 28, 2019
: (2) Emergency diesel generator train A on April 28, 2019
: (3) Residual heat removal system train B on May 8, 2019
: (3) Residual heat removal system train B on May 8, 2019
: (4) Main turbine and electro
: (4) Main turbine and electro-hydraulic control systems on June 4, 2019
-hydraulic control systems on June 4, 2019


==71111.05Q - Fire Protection==
==71111.05Q - Fire Protection   Quarterly Inspection (IP Section 03.01)==
{{IP sample|IP=IP 71111.05Q|count=5}}


Quarterly Inspection (IP Section 03.01)
The inspectors evaluated fire protection program implementation in the following selected areas:
(5 Sample s) The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Switchyard including switchyard control building, fire area S-15 on April 22, 2019
: (1) Switchyard including switchyard control building, fire area S
: (2) Spent fuel pool, bridge, and laydown area, fire area FB-1 on May 10, 2019
-15 on April 22, 2019
: (3) Control building 2016' elevation, fire areas C-13, C-15, C-17, and C-35 on May 29, 2019
: (2) Spent fuel pool, bridge, and laydown area, fire area FB
-1 on May 10, 2019
: (3) Control building 2016' elevation, fire areas C
-13, C-15, C-17, and C-35 on May 29, 2019
: (4) Spent fuel pool heat exchanger rooms and cask wash down area, fire area FB-1 on June 4, 2019
: (4) Spent fuel pool heat exchanger rooms and cask wash down area, fire area FB-1 on June 4, 2019
: (5) Emergency diesel generator train A and essential switchgear train B, fire areas D-1 and C-10 on June 20, 2019
: (5) Emergency diesel generator train A and essential switchgear train B, fire areas D-1 and C-10 on June 20, 2019


==71111.06 - Flood Protection Measures==
==71111.06 - Flood Protection Measures   Inspection Activities - Internal Flooding (IP Section 02.02a.)==
{{IP sample|IP=IP 71111.06|count=1}}


Inspection Activities
- Internal Flooding (IP Section 02.02a.)===
{{IP sample|IP=IP 71111.04|count=1}}
The inspectors evaluated internal flooding mitigation protections in the:
The inspectors evaluated internal flooding mitigation protections in the:
: (1) Control building 1974' elevation, room 3101, on May 8, 2019
: (1) Control building 1974' elevation, room 3101, on May 8, 2019


==71111.07A - Heat Sink Performance==
==71111.07A - Heat Sink Performance   Annual Review (IP Section 02.01)==
{{IP sample|IP=IP 71111.07A|count=1}}


===Annual Review (IP Section 02.01)===
{{IP sample|IP=IP 71111.07A|count=1}}
The inspectors evaluated readiness and performance of:
The inspectors evaluated readiness and performance of:
: (1) Component cooling water heat exchanger EEG01A on April 4, 2019 71111.08P  
: (1) Component cooling water heat exchanger EEG01A on April 4, 2019
- Inservice Inspection Activities (PWR)
 
PWR Inservice Inspection Activities Sample (IP Section 03.01) (1 Sample)  The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk
===71111.08P - Inservice Inspection Activities (PWR)   PWR Inservice Inspection Activities Sample (IP Section 03.01) ===
-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 8 through April 12, 2019: 03.01.a - Nondestructive Examination and Welding Activities
{{IP sample|IP=IP 71111.08|count=1}}
: (1) NDE activity type:
The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 8 through April 12, 2019:
Magnetic Particle Testing (MT)a) Pipe to flange weld (FW
03.01.a - Nondestructive Examination and Welding Activities
-01), Job #17002729, Task 180, Report 5010-19-0001, ASME Class 3   b) Pipe to crossover tee weld (FW
: (1) NDE activity type: Magnetic Particle Testing (MT)a) Pipe to flange weld (FW-01), Job #17002729, Task 180, Report 5010-19-0001, ASME Class 3 b) Pipe to crossover tee weld (FW-17), Job # 17002729, Task 500, Report 5010-19-0008, ASME Class 3 c) Pipe to elbow weld (FW-21), Job # 17002729, Task 500, Report 5010-19-0009, ASME Class 3 d) Pipe to crossover tee weld (FW-10), Job # 17002729, Task 500, Report 5010-19-0012, ASME Class 3
-17), Job # 17002729, Task 500, Report 5010 0008, ASME Class c) Pipe to elbow weld (FW
: (2) NDE activity type: Ultrasonic Testing (UT)a) RPV replacement stud 2, Report 19-000245, ASME Class1
-21), Job # 17002729, Task 500, Report 5010 0009, ASME Class 3   d) Pipe to crossover tee weld (FW
: (3) NDE activity type: Visual Testing (VT)a) Fuel transfer system tube and flange, Job #17512708, Task 510, Report 5040-19-002, ASME Class IWE (VT-1)03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities
-10), Job # 17002729, Task 500, Report 5010-19-0012, ASME Class
: (1) Penetration numbers 1 through 78, Job #13503632; no indications identified 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities
: (2) NDE activity type:
Ultrasonic Testing (UT)a) RPV replacement stud 2, Report 19-000245, ASME Class1
: (3) NDE activity type:
Visual Testing (VT)a) Fuel transfer system tube and flange, Job #17512708, Task 510, Report 5040-19-002, ASME Class IWE (VT
-1) 03.01.b - Pressurized
-Water Reactor Vessel Upper Head Penetration Examination Activities
: (1) Penetration numbers 1 through 78, Job #13503632; no indications identified 03.01.c - Pressurized
-Water Reactor Boric Acid Corrosion Control Activities
: (1) Condition Report 201800861-002, boric acid screen and evaluation
: (1) Condition Report 201800861-002, boric acid screen and evaluation
: (2) Condition Report 201801218-001, boric acid screen and evaluation
: (2) Condition Report 201801218-001, boric acid screen and evaluation
: (3) Condition Report 201801218-002, boric acid screen and evaluation 03.01.d - No steam generator tube inspections were performed this inspection period 03.01.e - The inspector s reviewed 10 condition reports associated with inservice inspection related topics and determined that the licensee was entering issues into the corrective action program and taking appropriate actions to resolve
: (3) Condition Report 201801218-002, boric acid screen and evaluation 03.01.d - No steam generator tube inspections were performed this inspection period 03.01.e - The inspectors reviewed 10 condition reports associated with inservice inspection related topics and determined that the licensee was entering issues into the corrective action program and taking appropriate actions to resolve


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance   Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)==
{{IP sample|IP=IP 71111.11Q|count=1}}


===Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)===
{{IP sample|IP=IP 71111.11Q|count=1}}
The inspectors observed and evaluated licensed operator performance in the control room during:
The inspectors observed and evaluated licensed operator performance in the control room during:
: (1) Reduced reactor coolant system inventory, including infrequently performed test or evolution (IPTE) briefs, on May 5, 2019
: (1) Reduced reactor coolant system inventory, including infrequently performed test or evolution (IPTE) briefs, on May 5, 2019
: (2) Vacuum fill of the reactor coolant system on May 6, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02)
: (2) Vacuum fill of the reactor coolant system on May 6, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1 Sample) The inspectors observed and evaluated licensed operator training in the simulator for:
The inspectors observed and evaluated licensed operator training in the simulator for:
: (1) Reactor start
: (1) Reactor start-up on May 6, 2019
-up on May 6, 2019


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness   Routine Maintenance Effectiveness Inspection (IP Section 02.01)==
{{IP sample|IP=IP 71111.12|count=1}}


===Routine Maintenance Effectiveness Inspection (IP Section 02.01)===
{{IP sample|IP=IP 71111.12|count=1}}
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Essential service water including butterfly valves on April 8, 2019   Quality Control (IP Section 02.02)
: (1) Essential service water including butterfly valves on April 8, 2019
(1 Sample) The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
 
: (1) Residual heat removal train A including hand
===Quality Control (IP Section 02.02) (1 Sample)===
-switches on June 21, 2019
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:
: (1) Residual heat removal train A including hand-switches on June 21, 2019


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control   Risk Assessment and Management Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.13|count=4}}


===Risk Assessment and Management Sample (IP Section 03.01)
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
(4 Sample s) The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Planned elevated risk during polar crane maintenance and operation on April 4, 2019
: (1) Planned elevated risk during polar crane maintenance and operation on April 4, 2019
: (2) Planned elevated risk for the train A work window on April 8, 2019
: (2) Planned elevated risk for the train A work window on April 8, 2019
: (3) Planned elevated risk during switchyard maintenance on April 2, 2019
: (3) Planned elevated risk during switchyard maintenance on April 2, 2019
: (4) Planned elevated risk for reactor power ascension and recovery of a digital turbi ne hydraulics controller on May 20, 2019
: (4) Planned elevated risk for reactor power ascension and recovery of a digital turbine hydraulics controller on May 20, 2019


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments   Operability Determination or Functionality Assessment (IP Section 02.02)==
{{IP sample|IP=IP 71111.15|count=6}}


Operability Determination or Functionality Assessment (IP Section 02.02)
The inspectors evaluated the following operability determinations and functionality assessments:
(6 Sample s) The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Dropped control rod H-8, Condition Report 201901077, on April 12, 2019
: (1) Drop ped control rod H
-8, Condition Report 201901077, on April 12, 2019
: (2) Turbine-driven auxiliary feedwater pump internal inspection results, Condition Report 201902635, on April 17, 2019
: (2) Turbine-driven auxiliary feedwater pump internal inspection results, Condition Report 201902635, on April 17, 2019
: (3) Reactor coolant motor
: (3) Reactor coolant motor-operated valve BBHV0016 stem nut wear, Condition Report 201902462, on April 18, 2019
-operated valve BBHV0016 stem nut wear, Condition Report 201902462, on April 18, 2019
: (4) Switchyard breaker MDV45 failure to close, Condition Report 201902658, on April 18, 2019
: (4) Switchyard breaker MDV45 failure to close, Condition Report 201902658, on April 18, 2019
: (5) Essential service water failure analysis for valves EFHV0065 and EFHV0066, Condition Report 201806521, on May 9, 2019
: (5) Essential service water failure analysis for valves EFHV0065 and EFHV0066, Condition Report 201806521, on May 9, 2019
: (6) Control room air conditioning unit SGK04A degraded cooling capacity, Condition Report 201904050, on May 31, 2019
: (6) Control room air conditioning unit SGK04A degraded cooling capacity, Condition Report 201904050, on May 31, 2019


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications   Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)==
{{IP sample|IP=IP 71111.18|count=1}}


Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)===
{{IP sample|IP=IP 71111.13|count=1}}
The inspectors evaluated the following permanent modification:
The inspectors evaluated the following permanent modification:
: (1) Main turbine generator governor controls, MP 08
: (1) Main turbine generator governor controls, MP 08-0027, on April 4, 2019
-0027, on April 4, 2019


==71111.19 - Post-Maintenance Testi==
==71111.19 - Post-Maintenance Testing    Post Maintenance Test Sample (IP Section 03.01)==
{{IP sample|IP=IP 71111.19|count=7}}


===ng Post Maintenance Test Sample (IP Section 03.01)
The inspectors evaluated the following post maintenance tests:
(7 Sample s) The inspectors evaluated the following post maintenance tests:
: (1) Polar crane and load cell after equipment outage on April 6, 2019
: (1) Polar crane and load cell after equipment outage on April 6, 2019
: (2) Ultimate heat sink cooling tower fans train B after equipment outage on April 12, 2019
: (2) Ultimate heat sink cooling tower fans train B after equipment outage on April 12, 2019
Line 187: Line 166:
: (7) Load shedding and emergency load sequencing train A after equipment outage on May 19, 2019
: (7) Load shedding and emergency load sequencing train A after equipment outage on May 19, 2019


==71111.20 - Refueling and Other Outage Activities==
==71111.20 - Refueling and Other Outage Activities   Refueling/Other Outage Sample (IP Section 03.01)==
 
{{IP sample|IP=IP 71111.20|count=1}}
Refueling/Other Outage Sample (IP Section 03.01)===
{{IP sample|IP=IP 71111.19|count=1}}
: (1) The inspectors evaluated refueling outage RF23 from April 1 through May 22, 2019
: (1) The inspectors evaluated refueling outage RF23 from April 1 through May 22, 2019


==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:    Inservice Testing (IP Section 03.01)==
{{IP sample|IP=IP 71111.22|count=2}}
: (1) Pressurizer power operated relief valve inservice test in Mode 4 on April 3, 2019
: (2) Component cooling water cross tie valves inservice testing on June 2, 2019 Reactor Coolant System (RCS) Leakage Detection Testing (IP Section 03.01) (1 Sample)
: (1) RCS water inventory balance surveillance post-reactor startup from Refueling Outage RF23 on June 19, 2019


===The inspectors evaluated the following surveillance tests:
===Surveillance Tests (other) (IP Section 03.01) (3 Samples)===
Inservice Testing (IP Section 03.01)
(2 Sample s)
: (1) Pressurizer power operated relief valve inservice test in Mode 4 on April 3, 2019
: (2) Component cooling water cross tie valves inservice testing on June 2, 2019 Reactor Coolant System (RCS) Leakage Detection Testing (IP Section 03.01)===
{{IP sample|IP=IP 71111.22|count=1}}
: (1) RCS water inventory balance surveillance post
-reactor startup from Refueling Outage RF23 on June 19, 2019  Surveillance Tests (other) (IP Section 03.01)
(3 Sample s)
: (1) Engineered safety features actuation systems train A on April 5, 2019
: (1) Engineered safety features actuation systems train A on April 5, 2019
: (2) Class 1E electrical equipment air conditioning system actuation and flow test on date May 11, 2019
: (2) Class 1E electrical equipment air conditioning system actuation and flow test on date May 11, 2019
: (3) Turbine-driven auxiliary feedwater pump test in Mode 3 on May 15, 2019
: (3) Turbine-driven auxiliary feedwater pump test in Mode 3 on May 15, 2019


==71114.04 - Emergency Action Level and Emergency Plan Changes==
==71114.04 - Emergency Action Level and Emergency Plan Changes   Inspection Review (IP Section 02.01-02.03)==
 
===Inspection Review (IP Section 02.01
-02.03)===
{{IP sample|IP=IP 71114.04|count=1}}
{{IP sample|IP=IP 71114.04|count=1}}
: (1) The inspectors evaluated Procedure EIP-ZZ-00101, Addendum 2, "Emergency Action Level Technical Basis Document," Revision 16, on May 1, 2019 This evaluation does not constitute NRC approval.
: (1) The inspectors evaluated Procedure EIP-ZZ-00101, Addendum 2, "Emergency Action Level Technical Basis Document," Revision 16, on May 1, 2019 This evaluation does not constitute NRC approval.


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation   Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)==
 
===Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)===
{{IP sample|IP=IP 71114.06|count=1}}
{{IP sample|IP=IP 71114.06|count=1}}
: (1) Team 4 full participation emergency response organization drill on June 6,
: (1) Team 4 full participation emergency response organization drill on June 6,
Line 223: Line 191:
==RADIATION SAFETY==
==RADIATION SAFETY==


==71124.01 - Radiological Hazard Assessment and Exposure Controls Contamination and Radioactive Material Control (IP Section 02.03)==
==71124.01 - Radiological Hazard Assessment and Exposure Controls   Contamination and Radioactive Material Control (IP Section 02.03)==
{{IP sample|IP=IP 71124.01|count=1}}


===(1 Sample) The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:
The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:
: (1) 0029GZ
: (1) 0029GZ
: (2) 3217GN
: (2) 3217GN
Line 232: Line 201:
: (5) E-083/S-13
: (5) E-083/S-13
: (6) CNP-148
: (6) CNP-148
: (7) MRC-4108 High Radiation Area and Very High Radiation Area Controls (IP Section 02.05)===
: (7) MRC-4108 High Radiation Area and Very High Radiation Area Controls (IP Section 02.05) (1 Sample)
{{IP sample|IP=IP 71124.01|count=1}}
The inspectors evaluated risk-significant high radiation area and very high radiation area controls.
The inspectors evaluated risk
 
-significant high radiation area and very high radiation area controls. Instructions to Workers (IP Section 02.02)
===Instructions to Workers (IP Section 02.02) (1 Sample)===
(1 Sample) The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas:
The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas:
Radiation work packages
Radiation work packages
: (1) R23HDDESTUD, Revision 0
: (1) R23HDDESTUD, Revision 0 - install stud tensioner hoists, deten0sion reactor vessel studs, remove reactor vessel studs, clean stud holes, lubricate stud holes, install stud hole plugs, and install guides studs/pins
- install stud tensioner hoists, deten 0sion reactor vessel studs, remove reactor vessel studs, clean stud holes, lubricate stud holes, install stud hole plugs, and install guides studs/pins
: (2) R23HDSTUD18, Revision 0 - Refuel 23 activities to remove reactor vessel stuck stud 18, including thread repairs, and inspect its stud hole; includes cutting, boring, QC/Engineering inspections, and associated cavity work (except cavity decontamination)
: (2) R23HDSTUD18, Revision 0  
: (3) R23STD18DECON, Revision 0 - RF23 upper cavity gross rinse, vacuum of seal ring, upper cavity decontamination, and reactor vessel flange cleaning to support removal of stuck reactor vessel stud 18, includes all Radiation Protection coverage and surveys
- Refuel 23 activities to remove reactor vessel stuck stud 18, including thread repairs, and inspect its stud hole; includes cutting, boring, QC/Engineering inspections, and associated cavity work (except cavity decontamination)
: (4) R23ENGHRA, Revision 0 - R23 engineering activities inside high radiation areas in all radiologically controlled areas including the reactor building
: (3) R23STD18DECON, Revision 0  
: (5) 16003707510, Revision 0 - RT new nipolet to valve weld on Valve EMV0161 Electronic alarming dosimeter alarms
- RF23 upper cavity gross rinse, vacuum of seal ring, upper cavity decontamination, and reactor vessel flange cleaning to support removal of stuck reactor vessel stud 18, includes all Radiation Protection coverage and surveys
: (4) R23ENGHRA, Revision 0  
- R23 engineering activities inside high radiation areas in all radiologically controlled areas including the reactor building
: (5) 16003707510, Revision 0  
- RT new nipolet to valve weld on Valve EMV0161 Electronic alarming dosimeter alarms
: (1) The licensee did not have an occurrence of a dosimeter alarm during the inspection period. The inspectors reviewed corrective action documents, radiation work permits and ALARA plans, as well as, interviewed workers to ensure the licensee was evaluating and controlling occupational worker exposures appropriately.
: (1) The licensee did not have an occurrence of a dosimeter alarm during the inspection period. The inspectors reviewed corrective action documents, radiation work permits and ALARA plans, as well as, interviewed workers to ensure the licensee was evaluating and controlling occupational worker exposures appropriately.


Line 255: Line 219:
: (3) Pipefitters equipment boxes for the radiologically controlled area use
: (3) Pipefitters equipment boxes for the radiologically controlled area use
: (4) Radioactive material (radioactive source) storage containers
: (4) Radioactive material (radioactive source) storage containers
: (5) Radioactive material trash bags in the reactor containment building and auxiliary building Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample) The inspectors evaluated radiation worker performance and radiation protection technician proficiency.
: (5) Radioactive material trash bags in the reactor containment building and auxiliary building Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)
The inspectors evaluated radiation worker performance and radiation protection technician proficiency.


Radiological Hazard Assessment (IP Section 02.01)
===Radiological Hazard Assessment (IP Section 02.01) (1 Sample)===
(1 Sample) The inspectors evaluated radiological hazards assessments and controls. The inspectors reviewed the following:
The inspectors evaluated radiological hazards assessments and controls. The inspectors reviewed the following:
Radiological surveys
Radiological surveys
: (1) General containment
: (1) General containment
: (2) Reactor cavity
: (2) Reactor cavity
: (3) Reactor h ead
: (3) Reactor head
: (4) Inside bioshield
: (4) Inside bioshield
: (5) Incore t unnel  Risk significant radiological work activities
: (5) Incore tunnel Risk significant radiological work activities
: (1) Reactor head lift
: (1) Reactor head lift
: (2) Refuel activities
: (2) Refuel activities
: (3) Reactor head stud replacement  
: (3) Reactor head stud replacement - stuck stud 2 and 18
- stuck stud 2 and 18
: (4) Cavity decontamination
: (4) Cavity decontamination
: (5) Radiography Air sample survey records
: (5) Radiography Air sample survey records
: (1) Reactor containment building entries: 29-MAR-19-200005,7,8; and 31-Mar-19-200004, 5, 8
: (1) Reactor containment building entries: 29-MAR-19-200005,7,8; and 31-Mar-19-200004, 5, 8
: (2) Reactor containment building outage dailies
: (2) Reactor containment building outage dailies: 08-APR-19-200008,9,10; 09-APR-19-200012,13,14; and 10-APR-19-200004,5,6
: 08-APR-19-200008,9,10; 09-APR-19-200012,13,14; and 10
: (3) Reactor cavity: 08-APR-19-200023, 24; 08-APR-19-200025, 26; 09-APR-19-200003,5; 09-APR-19-200006,8; and 10-APR-19-200023, 24
-APR-19-200004,5,6
: (4) Reactor head stand O-ring cutout: 10-APR-19-200007,18
: (3) Reactor cavity: 08-APR-19-200023, 24; 08-APR-19-200025, 26; 09-APR-19-200003,5; 09
: (5) Breach of Valve BGHV8149B: 10-APR-19-200029, 34 Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)
-APR-19-200006,8; and 10
The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.
-APR-19-200023, 24
: (4) Reactor head stand O
-ring cutout: 10-APR-19-200007,18
: (5) Breach of Valve BGHV8149B: 10-APR-19-200029, 34 Radiological Hazards Control and Work Coverage (IP Section 02.04)
(1 Sample) The inspectors evaluated in
-plant radiological conditions during facility walkdowns and observation of radiological work activities.


Radiological work package for areas with airborne radioactivity
Radiological work package for areas with airborne radioactivity
: (1) There were no radiation work permits with airborne radioactivity available for review during this inspection.
: (1) There were no radiation work permits with airborne radioactivity available for review during this inspection. The inspectors reviewed radiation work permits with the highest potential for airborne radioactivity and the results for air samples taken during the inspection period.


The inspectors reviewed radiation work permits with the highest potential for airborne radioactivity and the results for air samples taken during the inspection period.
==71124.02 - Occupational ALARA Planning and Controls   Implementation of ALARA and Radiological Work Controls (IP Section 02.03)==
 
{{IP sample|IP=IP 71124.02|count=1}}
==71124.02 - Occupational ALARA Planning and Controls==


===Implementation of ALARA and Radiological Work Controls (IP Section 02.03)===
{{IP sample|IP=IP 71124.02|count=1}}
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:
The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:
: (1) RWP 16003707510, EMV0161 radiography
: (1) RWP 16003707510, EMV0161 radiography
: (2) RWP R23HDSTUD18, remove stuck stud 18
: (2) RWP R23HDSTUD18, remove stuck stud 18
: (3) RWP R23STD18DECON, RF23 Cavity Decontamination Radiation Worker Performance (IP Section 02.04)
: (3) RWP R23STD18DECON, RF23 Cavity Decontamination
(1 Sample) The inspectors evaluated radiation worker and radiation protection technician performance during general work in containment, decontamination of the vessel flange in preparation for the removal of stuck stud 2, and during the radiography of EMV0161 in the auxiliary building.


==71124.05 - Radiation Monitoring==
===Radiation Worker Performance (IP Section 02.04) (1 Sample)===
The inspectors evaluated radiation worker and radiation protection technician performance during general work in containment, decontamination of the vessel flange in preparation for the removal of stuck stud 2, and during the radiography of EMV0161 in the auxiliary building.


===Instrumentation Calibration and Testing Program (IP Section 02.02)===
==71124.05 - Radiation Monitoring Instrumentation   Calibration and Testing Program (IP Section 02.02)==
{{IP sample|IP=IP 71124.05|count=1}}
{{IP sample|IP=IP 71124.05|count=1}}
The inspectors evaluated the calibration and testing program implementation.


The inspectors reviewed the following:
The inspectors evaluated the calibration and testing program implementation. The inspectors reviewed the following:
Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
: (1) TM-4010-HP
: (1) TM-4010-HP
: (2) PM-4046-HP Failure to Meet Calibration or Source Check Acceptance Criteria
: (2) PM-4046-HP Failure to Meet Calibration or Source Check Acceptance Criteria
: (1) CRM-4190-HP Walk Downs and Observations (IP Section 02.01)
: (1) CRM-4190-HP
(1 Sample) The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.


The inspectors reviewed the following:
===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspectors reviewed the following:
Portable Survey Instruments
Portable Survey Instruments
: (1) CRM-4025-HP
: (1) CRM-4025-HP
Line 323: Line 277:
: (1) ION-4172-HP
: (1) ION-4172-HP
: (2) CRM-4115-HP
: (2) CRM-4115-HP
: (3) GMI-4178-HP Area Radiation Monitors and Continuous Air Monitors
: (3) GMI-4178-HP Area Radiation Monitors and Continuous Air Monitors
: (1) 0-EG-RE-09
: (1) 0-EG-RE-09
: (2) 0-GT-RE-33
: (2) 0-GT-RE-33
Line 329: Line 283:
: (4) 0-SD-RE-38
: (4) 0-SD-RE-38
: (5) CAM-4019-HP
: (5) CAM-4019-HP
: (6) CAM-4020-HP Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
: (6) CAM-4020-HP Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
: (1) TM-4010-HP
: (1) TM-4010-HP
: (2) PCM-4054-HP
: (2) PCM-4054-HP
: (3) PM-4046-HP
: (3) PM-4046-HP


==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment==
==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)
 
===Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02)===
{{IP sample|IP=IP 71124.06|count=1}}
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:
: (1) GH-RE-10 radwaste building unit vent functional test, June 13, 2019
: (1) GH-RE-10 radwaste building unit vent functional test, June 13, 2019
: (2) GT-RE-21A plant unit vent calibration, January 29, 2019
: (2) GT-RE-21A plant unit vent calibration, January 29, 2019
: (3) GT-RE-21B plant unit vent calibration, August 23, 2018
: (3) GT-RE-21B plant unit vent calibration, August 23, 2018
: (4) HB-RE-18 liquid radwaste discharge monitor calibration, August 21, 2018 Dose Calculations (IP Section 02.05)
: (4) HB-RE-18 liquid radwaste discharge monitor calibration, August 21, 2018 Dose Calculations (IP Section 02.05)==
(1 Sample) The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
{{IP sample|IP=IP 71124.06|count=1}}
: (1) Batch liquid radioactive release permit numbers
 
RP09-2019-L0037;0 RP09-2018-L0007;1 RP09-2017-L0028;1
The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:
: (2) Batch airborne radioactive release permits
: (1) Batch liquid radioactive release permit numbers:
RP11A-2019-G0013;1 RP13-2018-G0002;56 RP13-2017-G0006;52 The inspectors reviewed the following annual radiological effluent release reports:
* RP09-2019-L0037;0
* RP09-2018-L0007;1
* RP09-2017-L0028;1
: (2) Batch airborne radioactive release permits:
* RP11A-2019-G0013;1
* RP13-2018-G0002;56
* RP13-2017-G0006;52 The inspectors reviewed the following annual radiological effluent release reports:
: (1) 2017 Annual Radiological Effluent Release Report
: (1) 2017 Annual Radiological Effluent Release Report
: (2) 2018 Annual Radiological Effluent Release Report The inspectors also reviewed the following abnormal gaseous or liquid tank discharges:
: (2) 2018 Annual Radiological Effluent Release Report The inspectors also reviewed the following abnormal gaseous or liquid tank discharges:
: (1) None were available for review during this inspection Instrumentation and Equipment (IP Section 02.04)
: (1) None were available for review during this inspection
(1 Sample) The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
 
===Instrumentation and Equipment (IP Section 02.04) (1 Sample)===
The inspectors reviewed the following radioactive effluent discharge system surveillance test results:
: (1) Auxiliary/fuel building emergency exhaust filter adsorber Unit B, in-place leak test
: (1) Auxiliary/fuel building emergency exhaust filter adsorber Unit B, in-place leak test
: (2) Control room pressurization filter adsorber Unit B, in-place leak test
: (2) Control room pressurization filter adsorber Unit B, in-place leak test
: (3) Control room filter adsorber Unit A, in-place leak test Sampling and Analysis (IP Section 02.03)
: (3) Control room filter adsorber Unit A, in-place leak test
(1 Sample) The inspectors reviewed the following radioactive effluent sampling and analysis activities:
 
===Sampling and Analysis (IP Section 02.03) (1 Sample)===
The inspectors reviewed the following radioactive effluent sampling and analysis activities:
: (1) None were available for review during this inspection The inspectors reviewed the following effluent discharge:
: (1) None were available for review during this inspection The inspectors reviewed the following effluent discharge:
: (1) June 11, 2019 , discharge monitor tank A discharge Walk Downs and Observations (IP Section 02.01)
: (1) June 11, 2019, discharge monitor tank A discharge
(1 Sample) The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
 
===Walk Downs and Observations (IP Section 02.01) (1 Sample)===
The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:
: (1) Liquid radwaste treatment system
: (1) Liquid radwaste treatment system
: (2) Gaseous radwaste treatment system
: (2) Gaseous radwaste treatment system


==71124.07 - Radiological Environmental Monitoring Program==
==71124.07 - Radiological Environmental Monitoring Program   Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)==
 
===Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)===
{{IP sample|IP=IP 71124.07|count=1}}
{{IP sample|IP=IP 71124.07|count=1}}
The inspectors evaluated the licensee's voluntary groundwater protection initiative through review of licensee documented leaks and spills since the last inspection, groundwater sampling results, and any changes to the licensee's groundwater sampling, ground water protection initiative, and spill and leak program and procedures.


The inspectors reviewed and observed selected onsite groundwater locations as delineated in the licensee's program to ensure timely identification of inadvertent releases into the groundwater.
The inspectors evaluated the licensee's voluntary groundwater protection initiative through review of licensee documented leaks and spills since the last inspection, groundwater sampling results, and any changes to the licensee's groundwater sampling, ground water protection initiative, and spill and leak program and procedures. The inspectors reviewed and observed selected onsite groundwater locations as delineated in the licensee's program to ensure timely identification of inadvertent releases into the groundwater. The licensee had no entries of spills or leaks into their 10 CFR 50.75(g) records since the last inspection.


The licensee had no entries of spills or leaks into their 10 CFR 50.75(g) records since the last inspection.
The licensee is continuing to monitor tritium through monitoring wells MW-31, MW-34, MW-36, MW-39, MW-47, MW-58, and MW-59. In 2017, the licensee identified a peak concentration in monitoring well MW-31 of 1,688 picoCuries per liter (pCi/l) in January which decreased by the end of the year to 278 pCi/l. In 2018, monitoring well MW-58 peaked at 911 pCi/l in January and decreased to 516 pCi/l by October. The licensee reported their sampling results in each respective annual radiological environmental operating report. The licensee is continuing to monitor the tritium levels and the continued decrease through natural attenuation.


The licensee is continuing to monitor tritium through monitoring wells MW
===Site Inspection (IP Section 02.01) (1 Sample)===
-31, MW-34, MW-36, MW-39, M W-47, MW-58, and MW
The inspectors evaluated the radiological environmental monitoring program implementation:
-59. In 2017, the licensee identified a peak concentration in monitoring well MW
-31 of 1,688 picoCuries per liter (pCi/l) in January which decreased by the end of the year to 278 pCi/l. In 2018, monitoring well MW
-58 peaked at 911 pCi/l in January and decreased to 516 pCi/l by October.
 
The licensee reported their sampling results in each respective annual radiological environmental operating report.
 
The licensee is continuing to monitor the tritium levels and the continued decrease through natural attenuation.
 
Site Inspection (IP Section 02.01)
(1 Sample) The inspectors evaluated the radiological environmental monitoring program implementation:
Walkdowns, Calibrations, and Maintenance Record Review
Walkdowns, Calibrations, and Maintenance Record Review
: (1) Air sampling stations: A1, A7, A8, A9, A10, and A11
: (1) Air sampling stations: A1, A7, A8, A9, A10, and A11
: (2) Thermoluminescent dosimeter (TLD) locations: 03, 05, 06, 21, 22a, 44, 45, 46, 47, and 61
: (2) Thermoluminescent dosimeter (TLD) locations: 03, 05, 06, 21, 22a, 44, 45, 46, 47, and 61
: (3) Air sampler pump calibrations: LAS
: (3) Air sampler pump calibrations: LAS-4179, LAS-4182, and LAS-4201
-4179, LAS-4182, and LAS
-4201
: (4) Meteorological tower instrument calibrations Environmental Sample Collections and Preparation Observation
: (4) Meteorological tower instrument calibrations Environmental Sample Collections and Preparation Observation
: (1) Vegetation samples from three sample locations: V9, V11, and V16
: (1) Vegetation samples from three sample locations: V9, V11, and V16
Line 396: Line 344:
: (2) Licensee replaced older air sampling pumps with new F&J pumps
: (2) Licensee replaced older air sampling pumps with new F&J pumps
: (3) Licensee converted air sample stations from a straight line sample port to an overhanging goose neck configuration
: (3) Licensee converted air sample stations from a straight line sample port to an overhanging goose neck configuration
: (4) Missed environmental samples were evaluated for nominal equipment failures, aged equipment issues, power source issues, and sample reliability.
: (4) Missed environmental samples were evaluated for nominal equipment failures, aged equipment issues, power source issues, and sample reliability. The licensee made repairs, replaced equipment, and adjusted sampling locations to fulfill the environmental sampling program requirements. All missed and anomalous results were reported in the annual radiological environmental operating report.


The licensee made repairs, replaced equipment, and adjusted sampling locations to fulfill the environmental sampling program requirements.
Sampling Program for the Potential of Licensed Material Entering Groundwater
: (1) The inspectors reviewed data from and observed the following sampled groundwater wells: U1MW-31, U1MW-937D, U1MW-939R, U1MW-940, U1MW-941, and U1MW-GW


All missed and anomalous results were reported in the annual radiological environmental operating report. Sampling Program for the Potential of Licensed Material Entering Groundwater
==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)==
: (1) The inspectors reviewed data from and observed the following sampled groundwater wells:  U1MW-31, U1MW-937D, U1MW
{{IP sample|IP=IP 71124.08|count=1}}
-939R, U1MW-940, U1MW-941, and U1MW-GW


==71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation==
===Radioactive Material Storage (IP Section 02.01)===
{{IP sample|IP=IP 71124.08|count=1}}
The inspectors evaluated radioactive material storage in the follow areas:
The inspectors evaluated radioactive material storage in the follow areas:
: (1) Low Level Drum Storage Area (55-gallon drums)
: (1) Low Level Drum Storage Area (55-gallon drums)
Line 418: Line 362:
: (5) 9709, SLW sludge solidified waste
: (5) 9709, SLW sludge solidified waste
: (6) 9710, oily waste
: (6) 9710, oily waste
: (7) 16145, SGBD resin Radioactive Waste System Walkdown (IP Section 02.02)
: (7) 16145, SGBD resin Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)
(1 Sample) The inspectors evaluated the following radioactive waste processing systems [and processes] during plant walkdowns:
The inspectors evaluated the following radioactive waste processing systems [and processes] during plant walkdowns:
Liquid or Solid Radioactive Waste Processing Systems
Liquid or Solid Radioactive Waste Processing Systems
: (1) Self-engaging dewatering system Radioactive Waste Resin and/or Sludge Discharges Processes
: (1) Self-engaging dewatering system Radioactive Waste Resin and/or Sludge Discharges Processes
: (1) Resin handling system for spent resin and charcoal Shipment Preparation (IP Section 02.04)
: (1) Resin handling system for spent resin and charcoal
(1 Sample) The inspectors evaluated [and observed] the following radioactive material shipment preparation processes:
 
: (1) 19-021, UN2912, radioactive material, LSA-I, Class 7, resin, June 11, 2019 Shipping Records (IP Section 02.05)
===Shipment Preparation (IP Section 02.04) (1 Sample)===
(1 Sample) The inspectors evaluated the following non
The inspectors evaluated [and observed] the following radioactive material shipment preparation processes:
-excepted package shipment records:
: (1) 19-021, UN2912, radioactive material, LSA-I, Class 7, resin, June 11, 2019
 
===Shipping Records (IP Section 02.05) (1 Sample)===
The inspectors evaluated the following non-excepted package shipment records:
: (1) 17-010, UN3321, radioactive material, LSA-II, Class 7, drummed mechanical filters, June 22, 2017
: (1) 17-010, UN3321, radioactive material, LSA-II, Class 7, drummed mechanical filters, June 22, 2017
: (2) 17-012, UN3321, radioactive material, LSA-II, Class 7, dewatered resin, July 12, 2017
: (2) 17-012, UN3321, radioactive material, LSA-II, Class 7, dewatered resin, July 12, 2017
: (3) 17-061, UN2912, radioactive material, LSA-I, Class 7, dry active waste CYC 21, November 17, 2017
: (3) 17-061, UN2912, radioactive material, LSA-I, Class 7, dry active waste CYC 21, November 17, 2017
: (4) 18-001, UN3321, radioactive material, LSA-II, Class 7, dewatered resin and charcoal , January 12, 2018
: (4) 18-001, UN3321, radioactive material, LSA-II, Class 7, dewatered resin and charcoal, January 12, 2018
: (5) 18-010, UN2911, radioactive material, Excepted Package, Class 7 , instruments, April 12, 2018
: (5) 18-010, UN2911, radioactive material, Excepted Package, Class 7, instruments, April 12, 2018
: (6) 18-018, UN2911, radioactive material, Excepted Package, Class 7, instruments, September 20, 2018
: (6) 18-018, UN2911, radioactive material, Excepted Package, Class 7, instruments, September 20, 2018
: (7) 18-036, UN2912, radioactive material, LSA-I, Class 7, dry active waste , December 26, 2018
: (7) 18-036, UN2912, radioactive material, LSA-I, Class 7, dry active waste, December 26, 2018
: (8) 19-005, UN3321, radioactive material, LSA-II, Class 7, resin and charcoal, March 19, 2019 Waste Characterization and Classification (IP Section 02.03)
: (8) 19-005, UN3321, radioactive material, LSA-II, Class 7, resin and charcoal, March 19, 2019 Waste Characterization and Classification (IP Section 02.03) (1 Sample)
(1 Sample) The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:
: (1) 14Aug17-200011GEL, FBG02A BTRS Resin 2017, August 1, 2017
: (1) 14Aug17-200011GEL, FBG02A BTRS Resin 2017, August 1, 2017
: (2) 17Aug17-200011FBGD, FBG02D BTRS Resin, August 17, 2017
: (2) 17Aug17-200011FBGD, FBG02D BTRS Resin, August 17, 2017
: (3) 09MAR200018 DAW1, DAW CYCLE 22, March 8, 2018
: (3) 09MAR200018 DAW1, DAW CYCLE 22, March 8, 2018
: (4) 18APR18-200020 PV3/6, ALPS PV3/PV6 Resin, April 18, 2018
: (4) 18APR18-200020 PV3/6, ALPS PV3/PV6 Resin, April 18, 2018
: (5) 07May18-200011(PV1), ALPS PV
: (5) 07May18-200011(PV1), ALPS PV-1 Charcoal 2019, May 1, 2018
-1 C harcoa l 2019, May 1, 2018
: (6) 16AUG18-200010(PV3), ALPS PV-3 Resin, August 15, 2018
: (6) 16AUG18-200010(PV3), ALPS PV
: (7) 18Jan19-200021(PV2), ALPS PV-2 Charcoal 2019, January 15,
-3 Resin, August 15, 2018
 
: (7) 18Jan19-200021(PV2), ALPS PV
==OTHER ACTIVITIES - BASELINE==
-2 Charcoal 2019, January 15, 2019
 
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
BI02: RCS Leak Rate Sample (IP Section 02.11) ===
{{IP sample|IP=IP 71151|count=1}}
: (1) April 1, 2018 through March 31, 2019 MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (1 Sample)
: (1) April 1, 2018 through March 31, 2019


==OTHER ACTIVITIES
===MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)===
- BASELINE==
: (1) April 1, 2018 through March 31, 2019 OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
: (1) October 1, 2018, through March 31, 2019 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences
BI02:  RCS Leak Rate Sample (IP Section 02.11)
 
(1 Sample)
===Sample. (IP Section 02.16) (1 Sample)===
: (1) April 1, 2018 through March 31, 2019 MS05:  Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)
(1 Sample)
: (1) April 1, 2018 through March 31, 2019  MS08: Heat Removal Systems (IP Section 02.07)
(1 Sample)
: (1) April 1, 2018 through March 31, 2019 OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15)
(1 Sample)
: (1) October 1, 2018, through March 31, 2019 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample. (IP Section 02.16)
(1 Sample)
: (1) October 1, 2018, through March 31, 2019
: (1) October 1, 2018, through March 31, 2019


==71152 - Problem Identification and Resolution Annual Follow==
==71152 - Problem Identification and Resolution     Annual Follow-up of Selected Issues (IP Section 02.03)==
{{IP sample|IP=IP 71152|count=1}}


===-up of Selected Issues (IP Section 02.03)===
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
{{IP sample|IP=IP 71152|count=1}}
: (1) Instrument air pressure control valves on June 22, 2019
The inspectors reviewed the licensee's implementation of its corrective action program related to the following issues:
 
: (1) Instrument air pressure control valves on June 22, 2019 Semiannual Trend Review (IP Section 02.02)
===Semiannual Trend Review (IP Section 02.02) (1 Sample)===
(1 Sample) The inspectors reviewed the licensee's corrective action program for potential adverse trends in troubleshooting equipment issues when the cause of a deficiency is n o t immediately clear and for a trend in safety
The inspectors reviewed the licensees corrective action program for potential adverse trends in troubleshooting equipment issues when the cause of a deficiency is not immediately clear and for a trend in safety-related door issues on June 3, 2019.
-related door issues on June 3, 2019. 71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)
 
(1 Sample)
===71153 - Followup of Events and Notices of Enforcement Discretion     Event Followup (IP Section 03.01) ===
: (1) The inspectors evaluated essential service water valve EHV0066 valve coupling failure and the licensee's response on April 12, 2019 Personnel Performance (IP Section 03.03)
{{IP sample|IP=IP 71153|count=1}}
(2 Sample s)
: (1) The inspectors evaluated essential service water valve EHV0066 valve coupling failure and the licensees response on April 12, 2019
: (1) The inspectors evaluated an automatic reactor trip and the licensee's performance on May 17, 2019
 
: (2) The inspectors evaluated a manual turbine trip and the licensee's performance on May 18, 2019
===Personnel Performance (IP Section 03.03) (2 Samples)===
: (1) The inspectors evaluated an automatic reactor trip and the licensees performance on May 17, 2019
: (2) The inspectors evaluated a manual turbine trip and the licensees performance on May 18,


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observation
Observation: Semi-Annual Trend Review                                                   71152 The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation to identify trends that might indicate the existence of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear and for a trend in safety-related door issues.
: Semi-Annual Trend Review 71152 The inspectors reviewed the licensee's corrective action program, performance indicators, system health reports, and other documentation to identify trends that might indicate the existence of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear and for a trend in safety
-related door issues.


The following troubleshooting examples were reviewed by the inspectors for 2019 where the licensee was unable to positively identify the cause or correct the apparent condition:
The following troubleshooting examples were reviewed by the inspectors for 2019 where the licensee was unable to positively identify the cause or correct the apparent condition:
Condition Report 201900105: The P
* Condition Report 201900105: The P-9 bistable light was found unexpectedly not lit during a routine control room walkdown. The licensee decided to make an unplanned entry into the reactor trip instrumentation technical specification based on the indication. The licensee determined there were no activities in progress that affected the indication, verified that that the P-9 bistable was in the correct state, and a lamp test confirmed the light bulb was functioning. The P-9 bistable light then spontaneously relit and the licensee exited Technical Specification 3.3.1. The licensee concluded that that the observed condition appeared to be an indication problem only but was unable to find a clear cause. The licensee later inspected and re-lamped indicator lights for this issue.
-9 bistable light was found unexpectedly not lit during a routine control room walkdown. The licensee decided to make an unplanned entry into the reactor trip instrumentation technical specification based on the indication. The licensee determined there were no activities in progress that affected the indication, verified that that the P
* Condition Report 201901077: Control rod H-8 dropped while operating control rod bank D. Extensive troubleshooting by the licensee could not determine a conclusive reason for the control rod drop. After performing an undetermined cause risk assessment per Procedure MDP-ZZ-TR001, Planning and Execution of Formal Troubleshooting Activities, the licensee recovered the rod. The licensee discussed the condition with the vendor, reviewed industry operating experience, and later performed inspections of the control rod drive mechanism during the refueling outage.
-9 bistable was in the correct state, and a lamp test confirmed the light bulb was functioning. The P-9 bistable light then spontaneously relit and the licensee exited Technical Specification 3.3.1. The licensee concluded that that the observed condition appeared to be an indication problem only but was unable to find a clear cause.


The licensee later inspected and re-lamped indicator lights for this issue.
After eliminating other possible causes, the licensee concluded that the probable cause was crud in the latching mechanism.
* Condition Report 201903494: When the train B motor-driven auxiliary feedwater pump suction check valve failed its breakaway torque checks, the licensee decided to make an unplanned entry into the auxiliary feedwater system technical specification.


Condition Report 201901077:  Control rod H
The licensee conducted an inspection of the valve's internals which did not identify an obvious cause for the increased torque required to operate the check valve. The licensee later concluded the valve packing was the cause of the increased resistance.
-8 dropped while operating control rod bank D. Extensive troubleshooting by the licensee could not determine a conclusive reason for the control rod drop. After performing an undetermined cause risk assessment per Procedure MDP-ZZ-TR001, "Planning and Execution of Formal Troubleshooting Activities," the licensee recovered the rod. The licensee discussed the condition with the vendor, reviewed industry operating experience, and later performed inspections of the control rod drive mechanism during the refueling outage. After eliminating other possible causes, the licensee concluded that the probable cause was crud in the latching mechanism.


Condition Report 201903494:  When the trai n B motor-driven auxiliary feedwater pump suction check valve failed its breakaway torque checks, the licensee decided to make an unplanned entry into the auxiliary feedwater system technical specification. The licensee conducted an inspection of the valve's internals which did not identify an obvious cause for the increased torque required to operate the check valve. The licensee later concluded the valve packing was the cause of the increased resistance. The licensee returned the check valve to service following an adjustment of the valve packing and a successful performance of the torque check. Although a clear cause was not identified, the licensee took steps to eliminate other possible causes and took corrective action to improve operating torque.
The licensee returned the check valve to service following an adjustment of the valve packing and a successful performance of the torque check. Although a clear cause was not identified, the licensee took steps to eliminate other possible causes and took corrective action to improve operating torque.


The inspectors noted that the for these three examples, the licensee conservatively declared the equipment inoperable and initiated timely actions to identify the cause of the condition. When the condition self
The inspectors noted that the for these three examples, the licensee conservatively declared the equipment inoperable and initiated timely actions to identify the cause of the condition.
-cleared or the cause could not be positively identified, the licensee ensured that they ruled out the known possible cause s and took appropriate corrective actions to try to address the problem. The inspectors verified that all issues were addressed within the scope of the corrective action program and that the completed and planned corrective actions were appropriate to correct the identified causes. The inspectors did not identify any trends or concerns that might be indicative of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear.


The inspectors also reviewed an apparent trend in problems with doors that were important to safety. After the NRC identified Green n on-cited violation 05000483/2018002-02 (ADAMS ML18221A398), an auxiliary building door that was blocked open during Mode ascension (NRC Event 54061), and damaged door seals identified by the NRC which were documented in Condition Report 201903536, the licensee wrote Condition Report 201904398 to evaluate 34 condition reports generated in 2019 for an adverse trend in door issues. The licensee recognized gaps in their staff's understanding of functions performed by doors, identifying degraded conditions (including during use), and timely resolution of the issues identified. The inspectors noted that condition reports were being appropriately generated for individual deficiencies but that programmatic issues remain to be addressed. The inspectors noted that many of the condition reports are the result of a concerted effort to identify door issues at a low threshold. The inspectors concluded that the licensee appropriately identified this trend in safety-related door issues and was acting to address the causes.
When the condition self-cleared or the cause could not be positively identified, the licensee ensured that they ruled out the known possible causes and took appropriate corrective actions to try to address the problem. The inspectors verified that all issues were addressed within the scope of the corrective action program and that the completed and planned corrective actions were appropriate to correct the identified causes. The inspectors did not identify any trends or concerns that might be indicative of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear.


Overall, the inspectors concluded that the licensee demonstrated a low threshold for issue identification and documentation in the corrective action program. The licensee applied a risk-based approach to ensure corrective actions are completed commensurate with a n issue's safety significance. The inspectors did not identify any additional trends or concerns that might be indicative of a more significant issue with safety
The inspectors also reviewed an apparent trend in problems with doors that were important to safety. After the NRC identified Green non-cited violation 05000483/2018002-02 (ADAMS ML18221A398), an auxiliary building door that was blocked open during Mode ascension (NRC Event 54061), and damaged door seals identified by the NRC which were documented in Condition Report 201903536, the licensee wrote Condition Report 201904398 to evaluate 34 condition reports generated in 2019 for an adverse trend in door issues. The licensee recognized gaps in their staffs understanding of functions performed by doors, identifying degraded conditions (including during use), and timely resolution of the issues identified. The inspectors noted that condition reports were being appropriately generated for individual deficiencies but that programmatic issues remain to be addressed. The inspectors noted that many of the condition reports are the result of a concerted effort to identify door issues at a low threshold. The inspectors concluded that the licensee appropriately identified this trend in safety-related door issues and was acting to address the causes.
-related doors.
 
Overall, the inspectors concluded that the licensee demonstrated a low threshold for issue identification and documentation in the corrective action program. The licensee applied a risk-based approach to ensure corrective actions are completed commensurate with an issues safety significance. The inspectors did not identify any additional trends or concerns that might be indicative of a more significant issue with safety-related doors.


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
 
* On July 2, 2019, the inspectors presented the integrated inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.
On July 2, 2019, the inspector s presented the integrated inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.
* On April 12, 2019, the inspectors presented the occupational radiation safety inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
 
* On April 12, 2019, the inspectors presented the inservice inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
On April 12, 2019
* On June 14, 2019, the inspectors presented the public radiation safety inspection results to Mr. B. Cox, Assistant Site Vice President and other members of the licensee staff.
, the inspector s presented the occupational radiation safety inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
 
On April 12, 2019
, the inspector s presented the inservice inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
 
On June 14, 2019
, the inspector s presented the public radiation safety inspection results to Mr. B. Cox, Assistant Site Vice President and other members of the licensee staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Procedure Type Designation
Inspection   Type           Designation       Description or Title                                 Revision or
Description or Title
Procedure                                                                                          Date
Revision or Date 71111.01 Corrective Action Documents Condition Reports
71111.01     Corrective     Condition Reports 201104350, 201900304, 201903907, 201903907
201104350, 201900304, 201903907, 201903907
Action
71111.01 Miscellaneous
Documents
ULDBD-GF-001 Miscellaneous Building HVAC
71111.01     Miscellaneous ULDBD-GF-001     Miscellaneous Building HVAC                           3
71111.01 Procedures
71111.01     Procedures     EDP-ZZ-01129     Callaway Plant Risk Assessment                       50
EDP-ZZ-01129 Callaway Plant Risk Assessment
71111.01     Procedures     ODP-ZZ-0016E     Operations Technician Watchstation Practices and     45
71111.01 Procedures
Rounds
ODP-ZZ-0016E Operations Technician Watchstation Practices and Rounds 45 71111.01 Procedures
71111.01     Procedures     PDP-ZZ-00027     Summer Readiness Program                             8
PDP-ZZ-00027 Summer Readiness Program
71111.04     Corrective     Condition Reports 201702402, 201806793, 201807138
71111.04 Corrective Action Documents Condition Reports
Action
201702402, 201806793, 201807138
Documents
71111.04 Procedures
71111.04     Procedures     OTN-EJ-00001     Residual Heat Removal System                         28
OTN-EJ-00001 Residual Heat Removal System
71111.05Q   Miscellaneous MP 16-0024       SGK05 Supplemental Fan System                         8
71111.05Q Miscellaneous
71111.05Q   Miscellaneous Various           Fire Pre-plan Manual                                 40
MP 16-0024 SGK05 Supplemental Fan System
71111.05Q   Procedures     APA-ZZ-00703     Fire Protection Operability Criteria and Surveillance 30
71111.05Q Miscellaneous
Requirements
Various Fire Pre-plan Manual
71111.05Q   Procedures     APA-ZZ-00750     Hazard Barrier Program                               44
71111.05Q Procedures
71111.06     Miscellaneous PM0900506         Walkdown of the RWST FDN and Valve House
APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance Requirements
71111.06     Miscellaneous PM1009292         Clean Debris from UHS Cooling Tower Fan Deck
71111.05Q Procedures
Drains
APA-ZZ-00750 Hazard Barrier Program
71111.06     Procedures     ESP-ZZ-01013     Maintenance Rule Structures Inspection               8
71111.06 Miscellaneous
71111.07A   Corrective     Condition Reports 201902062, 201902231, 201902396, 201902456,
PM0900506 Walkdown of the RWST FDN and Valve House
Action                          201902921
71111.06 Miscellaneous
Documents
PM1009292 Clean Debris from UHS Cooling Tower Fan Deck Drains 71111.06 Procedures
71111.07A   Work Orders                     16506165, 17513066
ESP-ZZ-01013 Maintenance Rule Structures Inspection
71111.08P   Corrective     Condition Reports 201800861, 201801218, 201804786, 201804794,
71111.07A Corrective Action Documents Condition Reports
Action                          201804816, 201901976
201902062, 201902231, 201902396, 201902456, 201902921 71111.07A Work Orders
Documents
16506165, 17513066
71111.08P   Corrective     Condition Reports 201902288
71111.08P Corrective Action Documents Condition Report
Action
201800861 , 201801218 , 201804786 , 201804794 , 201804816 , 201901976 71111.08P Corrective Action Documents Resulting from Condition Report s  201902288
Documents
Inspection Procedure Type Designation
Resulting from
Description or Title
Inspection Type         Designation           Description or Title                                   Revision or
Revision or Date Inspection
Procedure                                                                                              Date
71111.08P Engineering Evaluations
Inspection
Condition Report
71111.08P Engineering   Condition Reports    201800861-002, 201801218-001, 201801218-002
201800861-002 , 201801218-001 , 201801218-002 71111.08P Miscellaneous
Evaluations
Callaway Nuclear Plant Containment Exterior Concrete and Tendon Inspection Program
71111.08P Miscellaneous                       Callaway Nuclear Plant Containment Exterior             4
71111.08P Miscellaneous
Concrete and Tendon Inspection Program
Callaway Nuclear Plant Containment Pressure Boundary ISI Program, ASME Section XI, Subsection IWE 4 71111.08P Miscellaneous
71111.08P Miscellaneous                       Callaway Nuclear Plant Containment Pressure             4
Fourth Interval Inservice Inspection Program Plan, Fourth Interval Inservice Inspection Program Plan
Boundary ISI Program, ASME Section XI, Subsection
71111.08P Miscellaneous
IWE
71111.08P Miscellaneous                       Fourth Interval Inservice Inspection Program Plan,     0
Fourth Interval Inservice Inspection Program Plan
Fourth Interval Inservice Inspection Program Plan
71111.08P Miscellaneous
71111.08P Miscellaneous                       Fourth Interval Inservice Inspection Program Plan      1
Fourth Interval Inservice Inspection Program Plan Appendix A, Code Cases and Requests for Relief/Alternative Applied to the Fourth Interval
71111.08P  Miscellaneous                      Fourth Interval Inservice Inspection Program Plan       0
71111.08P Miscellaneous
Appendix A, Code Cases and Requests for
Fourth Interval Inservice Inspection Program Plan Appendix A, Code Cases and Requests for Relief/Alternative Applied to the Fourth Interval
Relief/Alternative Applied to the Fourth Interval
- Draft 71111.08P Miscellaneous
71111.08P Miscellaneous                       Fourth Interval Inservice Inspection Program Plan       1 - Draft
NDE Personnel Qualifications for D. Davis and W. Thomas 71111.08P Miscellaneous
Appendix A, Code Cases and Requests for
Welding Personnel Qualifications for  
Relief/Alternative Applied to the Fourth Interval
71111.08P Miscellaneous                       NDE Personnel Qualifications for D. Davis and W.
Thomas
71111.08P Miscellaneous                       Welding Personnel Qualifications for  
: [[contact::A. Carroll]],  
: [[contact::A. Carroll]],  
: [[contact::M. Collier]],  
: [[contact::M.
Collier]],  
: [[contact::R. Holliday]],  
: [[contact::R. Holliday]],  
: [[contact::A. Langkop]],  
: [[contact::A. Langkop]],  
: [[contact::D. Leeper]],  
: [[contact::D. Leeper]],  
: [[contact::J. Parker]],  
: [[contact::J. Parker]],
: [[contact::N. Rosenquist]],  
: [[contact::N. Rosenquist]],  
: [[contact::B. Thomas]],  
: [[contact::B. Thomas]],  
: [[contact::A. Weisacosky]], and C. Wood 71111.08P Miscellaneous
: [[contact::A. Weisacosky]], and C.
Relief Request I4R
Wood
-02 Relief from the Requirements of the ASME Code, Section XI, Table IWF
71111.08P Miscellaneous Relief Request I4R-   Relief from the Requirements of the ASME Code,
-2500-1 for 100 Percent Visual Examination of Class 1 Supports
Section XI, Table IWF-2500-1 for 100 Percent Visual
71111.08P Miscellaneous
Examination of Class 1 Supports
Relief Request I4R
71111.08P Miscellaneous Relief Request I4R-   Request for Alternative Applicable to the Fourth 10-
-04 Request for Alternative Applicable to the Fourth 10
Year Inspection Program Interval
-Year Inspection Program Interval
71111.08P Miscellaneous Specification C-     Inservice Inspection of the Containment Post-          13
71111.08P Miscellaneous
1003(Q)              Tensioning System and Exterior Concrete Shell
Specification
71111.08P NDE Reports   Job #13503632,       RPV Head Bare Metal Examination Summary, ASME           04/13/19
C-1003(Q) Inservice Inspection of the Containment Post
Task 500              Code Class 1
-Tensioning System and Exterior Concrete Shell
71111.08P NDE Reports   Report 5010-19-       Pipe to flange weld (FW-01), Job # 17002729, Task
71111.08P NDE Reports
0001                  180, ASME Class 3
Job #13503632, Task 500 RPV Head Bare Metal Examination Summary, ASME Code Class 1
Inspection Type       Designation         Description or Title                               Revision or
04/13/19 71111.08P NDE Reports
Procedure                                                                                      Date
Report 5010-19-0001 Pipe to flange weld (FW
71111.08P NDE Reports Report 5010-19-     Pipe to crossover tee weld (FW-17), Job # 17002729,
-01), Job # 17002729, Task 180, ASME Class 3
0008                Task 500, ASME Class 3
 
71111.08P NDE Reports Report 5010-19-     Pipe to elbow weld (FW-21), Job # 17002729, Task
Inspection Procedure Type Designation
0009                500, ASME Class 3
Description or Title
71111.08P NDE Reports Report 5010-19-     Pipe to crossover tee weld (FW-10), Job # 17002729,
Revision or Date 71111.08P NDE Reports
0012                Task 500, ASME Class 3
Report 5010
71111.08P NDE Reports Report 5040-19-     Fuel Transfer System Tube and Flange, Job #
-19-0008 Pipe to crossover tee weld (FW
2                17512708, Task 510, ASME Class IWE
-17), Job # 17002729, Task 500, ASME Class 3
71111.08P NDE Reports Report: 19-000245   Component: 2-CH-STUD-02-R2, Component               04/29/19
71111.08P NDE Reports
Description: RPV Stud #2 2nd Replacement, ASME
Report 5010
Code Class 1
-19-0009 Pipe to elbow weld (FW
71111.08P Procedures APA-ZZ-00661       Administration of Welding                           16
-21), Job # 17002729, Task 500, ASME Class 3
71111.08P Procedures APA-ZZ-00662       ASME Section XI Repair/Replacement Program         23
71111.08P NDE Reports
71111.08P Procedures EDP-ZZ-01003       Inservice Inspection Program                       31
Report 5010
71111.08P Procedures EDP-ZZ-01004       Boric Acid Corrosion Control Program               22
-19-0012 Pipe to crossover tee weld (FW
71111.08P Procedures ESP-ZZ-01012       Containment Post-Tensioning System Inspection       9
-10), Job # 17002729, Task 500, ASME Class 3
71111.08P Procedures ESP-ZZ-01016       ASME Section XI IWE Containment Pressure           8
71111.08P NDE Reports
Boundary Inspection
Report 5040
71111.08P Procedures LMT-08-PDI-UT-5     Straight Beam Ultrasonic Examination of Bolts and   0
-19-002 Fuel Transfer System Tube and Flange, Job # 17512708, Task 510, ASME Class IWE
Studs
71111.08P NDE Reports
71111.08P Procedures MDP-ZZ-LM001       Fluid Leak Management Program                       19
Report: 19
71111.08P Procedures MTW-ZZ-WP002       Welder Performance Qualification                   27
-000245 Component: 2
71111.08P Procedures MTW-ZZ-WP003       Control of Welding Filler Materials                 24
-CH-STUD-02-R2, Component Description: RPV Stud #2 2nd Replacement, ASME Code Class 1
71111.08P Procedures MTW-ZZ-WP006       Qualification of Welding Procedures                 9
04/29/19 71111.08P Procedures
71111.08P Procedures QCP-ZZ-05040       Visual Examination to ASME VT-1                     23
APA-ZZ-00661 Administration of Welding
71111.08P Procedures QCP-ZZ-05041       Visual Examination to ASME VT-2                     30
71111.08P Procedures
71111.08P Procedures QCP-ZZ-05042       Visual Examination to ASME VT-3                     21
APA-ZZ-00662 ASME Section XI Repair/Replacement Program
71111.08P Procedures QCP-ZZ-05048       Boric Acid Walkdown for RCS Pressure Boundary       14
71111.08P Procedures
71111.08P Procedures QCP-ZZ-05049       RPV Head Bare Metal Examination                     5
EDP-ZZ-01003 Inservice Inspection Program
71111.08P Self-       Self-Assessment     Material Degradation Management Plan               09/4/2014
71111.08P Procedures
Assessments 201309684-08
EDP-ZZ-01004 Boric Acid Corrosion Control Program
71111.08P Self-       Self-Assessment     ISI Program, dated 6/20/14
71111.08P Procedures
Assessments 201309684-31
ESP-ZZ-01012 Containment Post
Inspection Type       Designation         Description or Title                               Revision or
-Tensioning System Inspection
Procedure                                                                                    Date
71111.08P Procedures
71111.08P Work Orders                     17002729/180, 17002729/00, 17002729/40,
ESP-ZZ-01016 ASME Section XI IWE Containment Pressure Boundary Inspection
17992729/580
71111.08P Procedures
71111.12   Corrective Condition Reports   201902794, 201901943, 201903344, 201903353,
LMT-08-PDI-UT-5 Straight Beam Ultrasonic Examination of Bolts and Studs 0 71111.08P Procedures
Action                          201903360, 201903366, 201903372
MDP-ZZ-LM001 Fluid Leak Management Program
Documents
71111.08P Procedures
71111.12   Procedures OTG-ZZ-00002       Reactor Startup - IPTE                             61
MTW-ZZ-WP002 Welder Performance Qualification
71111.12   Procedures OTG-ZZ-00003       Plant Startup Hot Zero Power to 30% Power         64
71111.08P Procedures
71111.12   Procedures OTN-BB-00001       Reactor Coolant System - IPTE                     50
MTW-ZZ-WP003 Control of Welding Filler Materials
71111.13   Procedures ODMI 19-0002       Tuning Parameter Adjustments on Digital Controls   0
71111.08P Procedures
Post Mod Testing
MTW-ZZ-WP006 Qualification of Welding Procedures
OOA-ZZ-SSM01       Shutdown Safety Monitoring (SSM)                   9
71111.08P Procedures
71111.15   Corrective Condition Reports   201806521, 201902462, 201904050
QCP-ZZ-05040 Visual Examination to ASME VT
Action
-1 23 71111.08P Procedures
Documents
QCP-ZZ-05041 Visual Examination to ASME VT
71111.15   Procedures EDP-ZZ-01114       Motor Operated Valve Program Guide                 36
-2 30 71111.08P Procedures
71111.15   Procedures MTE-ZZ-QA006       Motor Operated Valve Analyst Guide                 10
QCP-ZZ-05042 Visual Examination to ASME VT
71111.15   Work Orders                     19002798
-3 21 71111.08P Procedures
71111.19   Corrective Condition Reports   201805239, 201902591, 201902876, 201903026,
QCP-ZZ-05048 Boric Acid Walkdown for RCS Pressure Boundary
Action                          201903553
71111.08P Procedures
Documents
QCP-ZZ-05049 RPV Head Bare Metal Examination
71111.19   Procedures OTN-MD-00001       Switchyard Breakers and Disconnects               30
71111.08P Self-Assessments
71111.19   Work Orders                     18000062, 18000065, 19001674
Self-Assessment
71111.20   Corrective Condition Reports  201903004
201309684-08 Material Degradation Management Plan
Action
09/4/2014 71111.08P Self-Assessments
Documents
Self-Assessment
71111.20   Procedures ITM-BB-L0053       BBLT0053A/B/BB Fill Vent and Calibration           1
201309684-31 ISI Program, dated 6/20/14
71111.20   Procedures OSP-BB-00007       RCS Heatup and Cooldown Limitations               14
 
71111.20   Procedures OTA-RK-00018       Annunciator Response Procedure MCB Panel RK018     4
Inspection Procedure Type Designation
71111.22   Corrective Condition Reports   201902874, 201902927, 201903657, 201903953,
Description or Title
Action                          201904075, 201904191
Revision or Date 71111.08P Work Orders
Documents
17002729/180 , 17002729/00 , 17002729/40 , 17992729/580
71111.22   Procedures OSP-AL-P0002       Turbine Driven Aux Feedwater Pump Inservice Test - 80
71111.12 Corrective Action Documents Condition Reports
Group B
201902794, 201901943, 201903344, 201903353, 201903360, 201903366, 201903372
71111.22   Procedures OSP-BB-00009       RCS Inventory Balance                             38
71111.12 Procedures
Inspection Type         Designation         Description or Title                                 Revision or
OTG-ZZ-00002 Reactor Startup  
Procedure                                                                                          Date
- IPTE 61 71111.12 Procedures
71111.22   Procedures   OSP-BB-V002A       PORV Inservice Test                                   14
OTG-ZZ-00003 Plant Startup Hot Zero Power to 30% Power
71111.22   Work Orders                       17001333, 17001334, 17003817, 17512419,
71111.12 Procedures
17512680, 17513093, 17514041, 17514487,
OTN-BB-00001 Reactor Coolant System  
19507557, 19507663, 19507685, 19507835
- IPTE 50 71111.13 Procedures
71124.01   Corrective   Condition Reports  201900315, 201900883, 201900908, 201900930,
ODMI 19-0002 Tuning Parameter Adjustments on Digital Controls Post Mod Testing
Action                            201901021, 201901659, 201901908, 201901995
OOA-ZZ-SSM01 Shutdown Safety Monitoring (SSM)
Documents
71111.15 Corrective Action Documents Condition Reports
71124.01   Miscellaneous Air Sample Log     Various Air Sample Logs                               01/16/2019
201806521, 201902462, 201904050
                                                                                                  -
71111.15 Procedures
EDP-ZZ-01114 Motor Operated Valve Program Guide
71111.15 Procedures
MTE-ZZ-QA006 Motor Operated Valve Analyst Guide
71111.15 Work Orders
19002798  71111.19 Corrective Action Documents Condition Reports
201805239, 201902591, 201902876, 201903026, 201903553 71111.19 Procedures
OTN-MD-00001 Switchyard Breakers and Disconnects
71111.19 Work Orders
18000062, 18000065, 19001674
71111.20 Corrective Action Documents Condition Reports
201903004  71111.20 Procedures
ITM-BB-L0053 BBLT0053A/B/BB Fill Vent and Calibration
71111.20 Procedures
OSP-BB-00007 RCS Heatup and Cooldown Limitations
71111.20 Procedures
OTA-RK-00018 Annunciator Response Procedure MCB Panel RK018
71111.22 Corrective Action Documents Condition Reports
201902874, 201902927, 201903657, 201903953, 201904075, 201904191
71111.22 Procedures
OSP-AL-P0002 Turbine Driven Aux Feedwater Pump Inservice Test  
- Group B 80 71111.22 Procedures
OSP-BB-00009 RCS Inventory Balance
Inspection Procedure Type Designation
Description or Title
Revision or Date 71111.22 Procedures
OSP-BB-V002A PORV Inservice Test
71111.22 Work Orders
17001333, 17001334, 17003817, 17512419, 17512680, 17513093, 17514041, 17514487, 19507557, 19507663, 19507685, 19507835
71124.01 Corrective Action Documents Condition Reports  201900315, 201900883, 201900908, 201900930, 201901021, 201901659, 201901908, 2019
01995  71124.01 Miscellaneous
Air Sample Log
Various Air Sample Logs
01/16/2019  
- 04/10/2019
71124.01 Miscellaneous
PM1002835 Non-Special Nuclear Material RAM Stored in the Spent Fuel Pool
71124.01 Miscellaneous
Source Leak Checks Various Source Leak Checks
01/18/2017
- 01/25/2019
71124.01 Procedures
APA-ZZ-01000 Callaway Energy Center Radiation Protection Program 046 71124.01 Procedures
APA-ZZ-01000 , Appendix A
Control of Radioactive Material 22 71124.01 Procedures
APA-ZZ-01004 Radiological Work Standards
71124.01 Procedures
HDP-ZZ-01200 Radiation Work Permits
71124.01 Procedures
HDP-ZZ-01500 Radiological Postings
71124.01 Procedures
HDP-ZZ-03000 Radiological Survey Program 47 71124.01 Procedures
HDP-ZZ-06000 Contamination Control and Alpha Monitoring Program
71124.01 Procedures
HSP-ZZ-00001 Radioactive Sealed Source Leak Check Surveillance
71124.01 Procedures
HTP-ZZ-01203 Radiological Area Access Control
71124.01 Procedures
HTP-ZZ-02005 Handling of Radioactive Material
71124.01 Procedures
HTP-ZZ-06001 High Radiation / Locked High Radiation / Very High Radiation Area Access
71124.01 Procedures
HTP-ZZ-06028 Radiological Controls for Pools that Contain or Store Spent Fuel
71124.01 Procedures
HTP-ZZ-06042 Industrial Radiography Using a Radioactive Source
71124.01 Radiation Surveys CA-M-20190401-10 RB2000I Mode 3 Survey
04/10/2019
71124.01 Radiation
CA-M-20190402-24 R23 RB Lower Cavity Blind Flange Removal
04/02/2019
 
Inspection Procedure Type Designation
Description or Title
Revision or Date Surveys 71124.01 Radiation Surveys CA-M-20190402-31 RB2023I Regen HX Post Shielding Survey
04/02/2019
71124.01 Radiation Surveys CA-M-20190404-31 RB2023I Scaffold Build to BG1E0126
04/04/2019
71124.01 Radiation Surveys CA-M-20190406-09 RBHead - Reactor Head Lift
04/06/2019
71124.01 Radiation Surveys CA-M-20190408-05 RB-2000-I G/A Five Days After CRUD Burst
04/08/2019
71124.01 Radiation Surveys CA-M-20190408-25 Reactor Vessel Head (On Stand)
04/06/2019
71124.01 Radiation Surveys CA-M-20190410-26 Gross Cavity Decon
04/10/2019
04/10/2019
71124.01 Radiation Surveys CA-M-20190410-27 Rx Shield Plate Install Post Survey
71124.01   Miscellaneous PM1002835          Non-Special Nuclear Material RAM Stored in the
04/10/2019
Spent Fuel Pool
71124.01 Radiation Work Permits (RWPs)
71124.01  Miscellaneous Source Leak        Various Source Leak Checks                            01/18/2017 -
R23ENGHRA RF23 Engineering Activities Inside High Radiation
Checks                                                                    01/25/2019
Areas in all RCA Areas Including the Reactor Building.
71124.01  Procedures    APA-ZZ-01000        Callaway Energy Center Radiation Protection          046
71124.01 Radiation Work Permits (RWPs)
Program
R23FUEL RF23 Offload Reactor, Perform FOSAR, Perform Reactor Reload, Core Mapping, Insert Shuffle, Pool Mapping, B5B Moves, and Miscellaneous Support Activities.
71124.01  Procedures    APA-ZZ-01000,      Control of Radioactive Material                      22
71124.01 Radiation Work Permits (RWPs)
Appendix A
R23HDDESSTUD
71124.01  Procedures    APA-ZZ-01004        Radiological Work Standards                          31
RF23 Install Stud Tensioner Hoists, Detension Reactor Vessel Studs, Remove Reactor Vessel Studs, Clean Stud Holes, Lubricate Stud Holes, Install Stud Hole Plugs, and Install Guides Studs/Pins. 0 71124.01 Radiation Work Permits (RWPs)
71124.01  Procedures    HDP-ZZ-01200        Radiation Work Permits                                33
R23HDSTUD18
71124.01  Procedures    HDP-ZZ-01500        Radiological Postings                                48
RF23 Activities to Remove Reactor Vessel Stuck Stud 18, Including Thread Repairs, and Inspect Its Stud Hole. Includes Cutting, Boring, QC/Engineering Inspections, and Associated Cavity Work (Except Cavity Decontamination).
71124.01  Procedures    HDP-ZZ-03000        Radiological Survey Program                          47
71124.01 Radiation Work Permits (RWPs)
71124.01  Procedures    HDP-ZZ-06000        Contamination Control and Alpha Monitoring Program    24
R23RCPCHANGE
71124.01  Procedures    HSP-ZZ-00001        Radioactive Sealed Source Leak Check Surveillance    15
RF23 Motor Change on A Reactor Coolant Pump and Associated Tasks.
71124.01  Procedures    HTP-ZZ-01203        Radiological Area Access Control                      57
71124.01 Radiation Work Permits (RWPs)
71124.01  Procedures    HTP-ZZ-02005        Handling of Radioactive Material                      49
R23STD18DECON
71124.01  Procedures    HTP-ZZ-06001        High Radiation / Locked High Radiation / Very High    51
RF23 Upper Cavity Gross Rinse, Vacuum of Seal Ring, Upper Cavity Decontamination, and RV Flange
Radiation Area Access
Inspection Procedure Type Designation
71124.01  Procedures    HTP-ZZ-06028        Radiological Controls for Pools that Contain or Store 9
Description or Title
Spent Fuel
Revision or Date Cleaning to Support Removal of
71124.01  Procedures    HTP-ZZ-06042        Industrial Radiography Using a Radioactive Source    14
Stuck RV Stud #18. Includes all RP Coverage and Surveys. 71124.01 Self-Assessments
71124.01  Radiation    CA-M-20190401-10    RB2000I Mode 3 Survey                                04/10/2019
AP18006 Nuclear Oversight Audit of Radiological and Non Radiological Environmental Monitoring Programs
Surveys
06/13/2018
71124.01  Radiation    CA-M-20190402-24    R23 RB Lower Cavity Blind Flange Removal              04/02/2019
71124.02 Corrective Action Documents Condition Reports 2018-02443, 2018
Inspection Type          Designation        Description or Title                                    Revision or
-02930, 2018
Procedure                                                                                            Date
-02953, 2018
Surveys
-04531, 2018-04758, 2018
71124.01  Radiation      CA-M-20190402-31  RB2023I Regen HX Post Shielding Survey                  04/02/2019
-04903, 2018
Surveys
-05952, 2018
71124.01  Radiation      CA-M-20190404-31  RB2023I Scaffold Build to BG1E0126                      04/04/2019
-06019, 2018-06973, 2019
Surveys
-00904, 2019-00908, 2019
71124.01  Radiation      CA-M-20190406-09  RBHead - Reactor Head Lift                              04/06/2019
-00998, 2019-01277, 2019
Surveys
-01355 71124.02 Miscellaneous
71124.01  Radiation     CA-M-20190408-05  RB-2000-I G/A Five Days After CRUD Burst                04/08/2019
RF23 Plant ALARA Review Committee (PARC) Meeting 01/24/2019
Surveys
71124.02 Miscellaneous
71124.01  Radiation      CA-M-20190408-25  Reactor Vessel Head (On Stand)                          04/06/2019
RT Examination of 1" SCH 80 Pipe Weld in Room 113 of Aux Building Shot Plan
Surveys
04/09/2019
71124.01  Radiation      CA-M-20190410-26  Gross Cavity Decon                                      04/10/2019
71124.02 Miscellaneous
Surveys
Powering into the Future  
71124.01  Radiation      CA-M-20190410-27   Rx Shield Plate Install Post Survey                     04/10/2019
- Callaway Refuel 23 Daily News Flyer
Surveys
04/08/2019  
71124.01   Radiation Work R23ENGHRA         RF23 Engineering Activities Inside High Radiation       0
- 04/11/2019
Permits (RWPs)                    Areas in all RCA Areas Including the Reactor Building.
71124.02 Miscellaneous
71124.01   Radiation Work R23FUEL           RF23 Offload Reactor, Perform FOSAR, Perform           0
Refuel 23 Outage Update & Shiftly SOM Turnover
Permits (RWPs)                    Reactor Reload, Core Mapping, Insert Shuffle, Pool
04/08/2019  
Mapping, B5B Moves, and Miscellaneous Support
- 04/11/2019
Activities.
71124.02 Miscellaneous
71124.01   Radiation Work R23HDDESSTUD       RF23 Install Stud Tensioner Hoists, Detension           0
Callaway Radiation Protection Current Log
Permits (RWPs)                    Reactor Vessel Studs, Remove Reactor Vessel Studs,
Clean Stud Holes, Lubricate Stud Holes,
Install Stud Hole Plugs, and Install Guides Studs/Pins.
71124.01   Radiation Work R23HDSTUD18       RF23 Activities to Remove Reactor Vessel Stuck Stud     0
Permits (RWPs)                    18, Including Thread Repairs, and Inspect Its Stud
Hole. Includes Cutting,
Boring, QC/Engineering Inspections, and Associated
Cavity Work (Except Cavity Decontamination).
71124.01   Radiation Work R23RCPCHANGE       RF23 Motor Change on A Reactor Coolant Pump and         0
Permits (RWPs)                    Associated Tasks.
71124.01   Radiation Work R23STD18DECON     RF23 Upper Cavity Gross Rinse, Vacuum of Seal           0
Permits (RWPs)                    Ring, Upper Cavity Decontamination, and RV Flange
Inspection Type         Designation         Description or Title                               Revision or
Procedure                                                                                        Date
Cleaning to Support Removal of
Stuck RV Stud #18. Includes all RP Coverage and
Surveys.
71124.01   Self-         AP18006             Nuclear Oversight Audit of Radiological and Non     06/13/2018
Assessments                      Radiological Environmental Monitoring Programs
71124.02   Corrective   Condition Reports   2018-02443, 2018-02930, 2018-02953, 2018-04531,
Action                            2018-04758, 2018-04903, 2018-05952, 2018-06019,
Documents                        2018-06973, 2019-00904, 2019-00908, 2019-00998,
2019-01277, 2019-01355
71124.02   Miscellaneous                     RF23 Plant ALARA Review Committee (PARC)           01/24/2019
Meeting
71124.02   Miscellaneous                     RT Examination of 1" SCH 80 Pipe Weld in Room 113   04/09/2019
of Aux Building Shot Plan
71124.02   Miscellaneous                     Powering into the Future - Callaway Refuel 23 Daily 04/08/2019 -
News Flyer                                          04/11/2019
71124.02   Miscellaneous                     Refuel 23 Outage Update & Shiftly SOM Turnover     04/08/2019 -
04/11/2019
04/11/2019
71124.02 Miscellaneous
71124.02   Miscellaneous                     Callaway Radiation Protection Current Log          04/11/2019
CA2943 Radiography Checklist  
71124.02  Miscellaneous CA2943             Radiography Checklist - Radioactive Source         04/09/2019
- Radioactive Source
71124.02   Miscellaneous Reactor Vessel     01/31/2019
04/09/2019
Stuck Stud
71124.02 Miscellaneous
Removal Project
Reactor Vessel Stuck Stud Removal Project
71124.02   Procedures   APA-ZZ-01000       Callaway Energy Center Radiation Protection         45
01/31/2019
Program
71124.02 Procedures
71124.02   Procedures   APA-ZZ-01001       Callaway Plant ALARA Plant                         27
APA-ZZ-01000 Callaway Energy Center Radiation Protection Program 45 71124.02 Procedures
71124.02   Procedures   APA-ZZ-01004       Radiological Work Standards                         31
APA-ZZ-01001 Callaway Plant ALARA Plant
71124.02   Procedures   HDP-ZZ-01100       ALARA Planning and Review                           24
71124.02 Procedures
71124.02   Procedures   HDP-ZZ-01200       Radiation Work Permits                             33
APA-ZZ-01004 Radiological Work Standards
71124.02   Procedures   HDP-ZZ-01500       Radiological Postings                               48
71124.02 Procedures
71124.02   Procedures   HDP-ZZ-06000       Contamination Control and Alpha Monitoring Program 24
HDP-ZZ-01100 ALARA Planning and Review
71124.02   Procedures   HTP-ZZ-01101       Administrative Controls for Radiation Shielding     26
71124.02 Procedures
71124.02   Procedures   HTP-ZZ-01104       Hot Spot Trending Program                           6
HDP-ZZ-01200 Radiation Work Permits
71124.02   Procedures   HTP-ZZ-01203       Radiological Area Access Control                   57
71124.02 Procedures
71124.02   Procedures   HTP-ZZ-06001       High Radiation/Locked High Radiation/Very High     51
HDP-ZZ-01500 Radiological Postings
Inspection Type           Designation       Description or Title                             Revision or
71124.02 Procedures
Procedure                                                                                      Date
HDP-ZZ-06000 Contamination Control and Alpha Monitoring Program
Radiation Area Access
71124.02 Procedures
71124.02   Procedures     HTP-ZZ-06042       Industrial Radiography Using A Radioactive Source 14
HTP-ZZ-01101 Administrative Controls for Radiation Shielding
71124.02   Radiation     CA-M-20190402-14   SJ Sample & Boronometer / PASS Rooms             04/02/2019
71124.02 Procedures
Surveys
HTP-ZZ-01104 Hot Spot Trending Program
71124.02   Radiation     CA-M-20190402-17   Access Pit                                       04/02/2019
71124.02 Procedures
Surveys
HTP-ZZ-01203 Radiological Area Access Control
71124.02   Radiation     CA-M-20190405-23   RB-2090 RF Stud Rack Survey Update 18501154.500   04/05/2019
71124.02 Procedures
Surveys
HTP-ZZ-06001 High Radiation/Locked High Radiation/Very High
71124.02   Radiation     CA-M-20190405-31   RB2047 General Area - Routine Survey             04/05/2019
Inspection Procedure Type Designation
Surveys
Description or Title
71124.02   Radiation     CA-M-20190405-33   RB2068 General Area Routine                       04/05/2019
Revision or Date Radiation Area Access
Surveys
71124.02 Procedures
71124.02   Radiation     CA-M-20190408-19   Safety Injection Pump Room A                     04/08/2019
HTP-ZZ-06042 Industrial Radiography Using A Radioactive Source
Surveys
71124.02 Radiation Surveys CA-M-20190402-14 SJ Sample & Boron
71124.02   Radiation     CA-M-20190408-32   RB2026' General Area Routine                     04/08/2019
ometer / PASS Rooms
Surveys
04/02/2019
71124.02   Radiation     CA-M-20190408-5   RB-2000-I G/A Five Days After CRUD Burst         04/08/2019
71124.02 Radiation Surveys CA-M-20190402-17 Access Pit
Surveys
04/02/2019
71124.02   Radiation     CA-M-20190410-26   Gross Cavity Decontamination                     04/10/2019
71124.02 Radiation Surveys CA-M-20190405-23 RB-2090 RF Stud Rack Survey Update 18501154.500
Surveys
04/05/2019
71124.02   Radiation     CA-M-20190410-27   Rx Shield Plate Install Post Survey               04/10/2019
71124.02 Radiation Surveys CA-M-20190405-31 RB2047 General Area  
Surveys
- Routine Survey
71124.02   Radiation Work 16003707510        EMV0161 Radiography                              0
04/05/2019
Permits (RWPs)
71124.02 Radiation Surveys CA-M-20190405-33 RB2068 General Area Routine 04/05/2019
71124.02   Radiation Work 18500671139       RF23 Scaffold to BGV0449                         0
71124.02 Radiation Surveys CA-M-20190408-19 Safety Injection Pump Room A
Permits (RWPs)
04/08/2019
71124.02  Radiation Work R23HDDESTUD       Detension Reactor Vessel Studs                   0
71124.02 Radiation Surveys CA-M-20190408-32 RB2026' General Area Routine
Permits (RWPs)
04/08/2019
71124.02   Radiation Work R23HDRESTUD       Install Reactor Vessel Studs                     0
71124.02 Radiation Surveys CA-M-20190408-5 RB-2000-I G/A Five Days After CRUD Burst
Permits (RWPs)
04/08/2019
71124.02   Radiation Work R23HDSTUD18       Remove Stuck Stud 18                             0
71124.02 Radiation Surveys CA-M-20190410-26 Gross Cavity Decontamination
Permits (RWPs)
04/10/2019
71124.02   Radiation Work R23STD18DECON      RF23 Cavity Decontamination                      0
71124.02 Radiation Surveys CA-M-20190410-27 Rx Shield Plate Install Post Survey
Permits (RWPs)
04/10/2019
Inspection Type         Designation     Description or Title                             Revision or
71124.02 Radiation Work Permits (RWPs)
Procedure                                                                                Date
16003707510
71124.02   Self-       201820044-064   NRC Pre Inspection Self-Assessment: Rad Safety   06/14/2018
EMV0161 Radiography
Assessments                  ALARA Planning and Occupational Dose Assessment
71124.02 Radiation Work Permits (RWPs)
71124.02   Self-       AP19001         Nuclear Oversight Audit of Radiation Protection   03/27/2019
18500671139
Assessments
RF23 Scaffold to BGV0449
71124.05   Calculations HPCI-05-03     Evaluate Plant Radioactivity Mixture (Set Points) 2/22/2005
71124.02 Radiation Work Permits (RWPs)
71124.05   Calculations HPCI-1403       Use of PM-12 for Passive Monitoring               12/11/2018
R23HDDESTUD
71124.05   Calibration 16503276-500   SD-RE-024 Reactor Coolant Sample Room             3/16/2018
Detension Reactor Vessel Studs
Records
71124.02 Radiation Work Permits (RWPs)
71124.05   Calibration 16513022-500   EG-RE-009 CCW HX A Inlet                         5/7/2018
R23HDRESTUD
Records
Install Reactor Vessel Studs
71124.05   Calibration 17504995-500   SD-RE-038 Spent Fuel Pool Area Rad High           10/22/2018
71124.02 Radiation Work Permits (RWPs)
Records
R23HDSTUD18
71124.05   Calibration 17506055-500   SD-RE-012 Aux Bldg. Corridor Basement Hi         6/11/2019
Remove Stuck Stud 18
Records
71124.02 Radiation Work Permits (RWPs)
71124.05   Calibration 17506056-500   SD-RE-015 Aux Bldg. Corridor Basement Hi         6/11/2019
R23STD18DECON
Records
RF23 Cavity Decontamination
71124.05   Calibration 17508210-500   GT-RE-059 CTMT High Range (Electronics           1/17/2019
Inspection Procedure Type Designation
Records                      Calibration)
Description or Title
71124.05   Calibration 17510146-500   GT-RE-033 CTMT Purge                             2/8/2019
Revision or Date 71124.02 Self-Assessments
Records
201820044-064 NRC Pre Inspection Self
71124.05   Calibration 17512545-500   GT-RE-059 CTMT High Range (Isotopic Calibration) 4/10/2019
-Assessment: Rad Safety ALARA Planning and Occupational Dose Assessment
Records
06/14/2018
71124.05   Calibration CAM-4019-HP     Calibration Certificate (PING-1A)                 6/28/2018
71124.02 Self-Assessments
Records
AP19001 Nuclear Oversight Audit of Radiation Protection
71124.05   Calibration CAM-4020-HP     Calibration Certificate (PING-1A)                 2/27/2019
03/27/2019
Records
71124.05 Calculations
71124.05   Calibration CAM-4045-HP     Calibration Certificate (Eberline AMS-4)         12/10/2018
HPCI-05-03 Evaluate Plant Radioactivity Mixture (Set Points)
Records
2/22/2005 71124.05 Calculations
71124.05   Calibration CRM-4023-HP     Calibration Certificate (Ludlum Model 2000)       3/5/2019
HPCI-1403 Use of PM-12 for Passive Monitoring
Records
2/11/2018
71124.05   Calibration CRM-4026-HP     Calibration Certificate (Ludlum Model 2000)       8/21/2018
71124.05 Calibration Records 16503276-500 SD-RE-024 Reactor Coolant Sample Room
Records
3/16/2018 71124.05 Calibration Records 16513022-500 EG-RE-009 CCW HX A Inlet
71124.05   Calibration CRM-4089-HP     Calibration Certificate (Ludlum Model 177)       1/26/2019
5/7/2018 71124.05 Calibration Records 17504995-500 SD-RE-038 Spent Fuel Pool Area Rad High
Records
10/22/2018
Inspection Type         Designation         Description or Title                                   Revision or
71124.05 Calibration Records 17506055-500 SD-RE-012 Aux Bldg. Corridor Basement Hi
Procedure                                                                                            Date
6/11/2019 71124.05 Calibration Records 17506056-500 SD-RE-015 Aux Bldg. Corridor Basement Hi
71124.05   Calibration   CRM-4134-HP         Calibration Certificate (Ludlum Model 177)             2/6/2019
6/11/2019 71124.05 Calibration Records 17508210-500 GT-RE-059 CTMT High Range (Electronics Calibration)
Records
1/17/2019 71124.05 Calibration Records 17510146-500 GT-RE-033 CTMT Purge
71124.05   Calibration   GPC-4003-HP         Instrument Calibration / Verification (Tennelec)       11/4/2007
2/8/2019 71124.05 Calibration Records 17512545-500 GT-RE-059 CTMT High Range (Isotopic Calibration)
Records
4/10/2019 71124.05 Calibration Records CAM-4019-HP Calibration Certificate (PING
71124.05   Calibration   GSS-4220-HP         Instrument Calibration / Verification (Ortec - Detector 3/21/2019
-1A) 6/28/2018 71124.05 Calibration Records CAM-4020-HP Calibration Certificate (PING
Records                          2)
-1A) 2/27/2019 71124.05 Calibration Records CAM-4045-HP Calibration Certificate (Eberline AMS
71124.05   Calibration   LAS-4198-HP         Calibration Certificate (Radeco Model HD-29A)           1/28/2019
-4) 12/10/2018
Records
71124.05 Calibration Records CRM-4023-HP Calibration Certificate (Ludlum Model 2000)
71124.05   Calibration   LSC-4004-HP         Instrument Calibration / Verification (Perkin-Elmer)   4/25/2018
3/5/2019 71124.05 Calibration Records CRM-4026-HP Calibration Certificate (Ludlum Model 2000)
Records
8/21/2018 71124.05 Calibration Records CRM-4089-HP Calibration Certificate (Ludlum Model 177)
71124.05   Calibration   PCM-4054-HP         Calibration Certificate (PCM-12)                       8/28/2018
1/26/2019
Records
Inspection Procedure Type Designation
71124.05   Calibration   PM-4046-HP         Calibration Certificate (PM-12)                         8/28/2018
Description or Title
Records
Revision or Date 71124.05 Calibration Records CRM-4134-HP Calibration Certificate (Ludlum Model 177)
71124.05   Calibration   TM-4010-HP         Calibration Certificate (SAM-12)                       3/31/2019
2/6/2019 71124.05 Calibration Records GPC-4003-HP Instrument Calibration / Verification (Tennelec)
Records
11/4/2007 71124.05 Calibration Records GSS-4220-HP Instrument Calibration / Verification (Ortec  
71124.05   Corrective   Condition Reports   201703216, 201707720, 201800120, 201801122,
- Detector 2) 3/21/2019 71124.05 Calibration Records LAS-4198-HP Calibration Certificate (Radeco Model HD
Action                            201805869, 201805975, 201900857, 201901599,
-29A) 1/28/2019 71124.05 Calibration Records LSC-4004-HP Instrument Calibration / Verification (Perkin
Documents                        201902538, 201903111
-Elmer) 4/25/2018 71124.05 Calibration Records PCM-4054-HP Calibration Certificate (PCM
71124.05   Miscellaneous                     Area Radiation Monitor Calibration Data                 6/11/2019
-12) 8/28/2018 71124.05 Calibration Records PM-4046-HP Calibration Certificate (PM
71124.05   Miscellaneous                     Calibration of Xradin Ion Chamber A3, A4, & A6         3/23/2018
-12) 8/28/2018 71124.05 Calibration Records TM-4010-HP Calibration Certificate (SAM
71124.05   Procedures   APA-ZZ-00014       Conduct of Operations - Radiation Protection           25
-12) 3/31/2019 71124.05 Corrective Action Documents Condition Report
71124.05   Procedures   HDP-ZZ-04000       Radiation Protection Instrumentation Program           29
s   201703216, 201707720, 201800120, 201801122, 201805869, 201805975, 201900857, 201901599, 201902538, 201903111 71124.05 Miscellaneous
71124.05   Procedures   HDP-ZZ-04700       Count Room and Whole Body Counter Quality Control       22
Area Radiation Monitor Calibration Data
Program
6/11/2019 71124.05 Miscellaneous
71124.05   Procedures   HSP-ZZ-00014       Rad Monitor Non-Functionality                           26
Calibration of Xradin Ion Chamber A3, A4, & A6
71124.05   Procedures   HTP-SD-06033       Control of Area Radiation Monitor Alarm Setpoints       6
3/23/2018 71124.05 Procedures
71124.05   Procedures   HTP-ZZ-04101-DTI- Ludlum Model 177 Frisker Calibration                     5
APA-ZZ-00014 Conduct of Operations  
M177-Cal
- Radiation Protection
71124.05   Procedures   HTP-ZZ-04102-DTI- Eberline RO-2 Survey Meter Calibration                   2
71124.05 Procedures
RO2-CAL
HDP-ZZ-04000 Radiation Protection Instrumentation Program
71124.05   Procedures   HTP-ZZ-04150       Operations of the GA Process Monitor System             54
71124.05 Procedures
71124.05   Procedures   HTP-ZZ-04167-DTI- Thermo RadEye Neutron Survey Meter Calibration           0
HDP-ZZ-04700 Count Room and Whole Body Counter Quality Control Program 22 71124.05 Procedures
Thermo-Radeye
HSP-ZZ-00014 Rad Monitor Non
Inspection Type         Designation         Description or Title                                 Revision or
-Functionality
Procedure                                                                                        Date
71124.05 Procedures
NL-Cal
HTP-SD-06033 Control of Area Radiation Monitor Alarm Setpoints
71124.05   Procedures   HTP-ZZ-04176-DTI-   Thermo Fisher Model SAM-12 Small Articles Monitor   5
71124.05 Procedures
SAM12-Cal          Calibration
HTP-ZZ-04101-DTI-M177-Cal Ludlum Model 177 Frisker Calibration
71124.05   Procedures   HTP-ZZ-04178-DTI-   Rotem Telepole Survey Meter Calibration             10
71124.05 Procedures
Telepole-Cal
HTP-ZZ-04102-DTI-RO2-CAL Eberline RO
71124.05   Procedures   HTP-ZZ-06020       Count Room Analytic and Quality Control Calculations 24
-2 Survey Meter Calibration
and Methods
71124.05 Procedures
71124.05   Procedures   HTP-ZZ-07010       Alternate Method for Obtaining CHARMS Reading       8
HTP-ZZ-04150 Operations of the GA Process Monitor System
71124.05   Procedures   ISL-GT-00R59       CTMT High Range Area Rad Monitor Loop Calibration   22
71124.05 Procedures
71124.05   Procedures   ITL-SD-00R00       Eberline Area Radiation Monitors                     9
HTP-ZZ-04167-DTI-Thermo-Radeye Thermo RadEye Neutron Survey Meter Calibration
71124.05   Radiation   CA-M-20190327-19   NS-1 Neutron Source - Quarterly Routine             3/27/2019
Inspection Procedure Type Designation
Surveys
Description or Title
71124.05   Self-       201807096-         Instrument Program and Pre-NRC Inspection           3/28/2019
Revision or Date NL-Cal 71124.05 Procedures
Assessments  010/201900029-
HTP-ZZ-04176-DTI-SAM12-Cal Thermo Fisher Model SAM-12 Small Articles Monitor Calibration
036
71124.05 Procedures
71124.05   Self-       AP19001             Nuclear Oversight Audit of Radiation Protection     3/27/2019
HTP-ZZ-04178-DTI-Telepole-Cal Rotem Telepole Survey Meter Calibration
Assessments
71124.05 Procedures
71124.06   Calculations RP09-2017-         Batch Liquid Radioactive Release Permit             07/28/2017
HTP-ZZ-06020 Count Room Analytic and Quality Control Calculations and Methods
L0028;1
71124.05 Procedures
71124.06   Calculations RP09-2018-         Batch Liquid Radioactive Release Permit             02/01/2018
HTP-ZZ-07010 Alternate Method for Obtaining CHARMS Reading
L0007;1
71124.05 Procedures
71124.06   Calculations RP09-2019-         Batch Liquid Radioactive Release Permit             06/11/2019
ISL-GT-00R59 CTMT High Range Area Rad Monitor Loop Calibration
L0037;0
71124.05 Procedures
71124.06   Calculations RP11A-2019-         Batch Airborne Radioactive Release Permit           02/17/2019
ITL-SD-00R00 Eberline Area Radiation Monitors
G0013;1
71124.05 Radiation Surveys CA-M-20190327-19 NS-1 Neutron Source  
71124.06   Calculations RP13-2017-         Continuous Airborne Radioactive Release Permit       12/07/2017
- Quarterly Routine
G0006;52
3/27/2019 71124.05 Self-Assessments
71124.06   Calculations RP13-2018-         Continuous Airborne Radioactive Release Permit       12/20/2018
201807096-010/201900029
G0002;56
-036 Instrument Program and Pre
71124.06   Calibration Job 12504965.500   RW Bldg Disch Line Process Rad Mon Loop Cal         08/21/2018
-NRC Inspection
Records
3/28/2019 71124.05 Self-Assessments
71124.06   Calibration Job 17502388.500   Ctmt Bld Air Exg Plenum (Unit Vent) Rad Xmt         08/23/2018
AP19001 Nuclear Oversight Audit of Radiation Protection
Records
3/27/2019 71124.06 Calculations
Inspection Type         Designation       Description or Title                               Revision or
RP09-2017-L0028;1 Batch Liquid Radioactive Release Permit
Procedure                                                                                      Date
07/28/2017
71124.06   Corrective   Condition Report   201703216, 201703232, 201703516, 201800052,
71124.06 Calculations
Action                          201800125, 201801122, 201801301, 201802268,
RP09-2018-L0007;1 Batch Liquid Radioactive Release Permit
Documents                        201802267, 201802407, 201802547, 201803062,
2/01/2018
201803391, 201805008, 201805070, 201805144,
71124.06 Calculations
201805978, 201805987, 201805989, 201806167,
RP09-2019-L0037;0 Batch Liquid Radioactive Release Permit
201900239, 201900348, 201900353, 201900438
06/11/2019
71124.06   Miscellaneous                   Callaway Energy Center 2017 Annual Radioactive
71124.06 Calculations
Effluent Release Report
RP11A-2019-G0013;1 Batch Airborne Radioactive Release Permit
71124.06   Miscellaneous                   Callaway Energy Center 2018 Draft Annual
2/17/2019
Radioactive Effluent Release Report
71124.06 Calculations
71124.06   Miscellaneous Job 15510527       FGG02A In-Place Bypass Leakage Test                 03/10/2017
RP13-2017-G0006;52 Continuous Airborne Radioactive Release Permit
71124.06   Miscellaneous Job 16509259       FGK02B In-Place Bypass Leakage Test                 05/31/2018
2/07/2017
71124.06   Miscellaneous Job 17503239       FGE01 In-Place Bypass Leakage Test                 07/16/2018
71124.06 Calculations
71124.06   Procedures   HSP-ZZ-00002       Radioactive Liquid Effluent Concentration           21
RP13-2018-G0002;56 Continuous Airborne Radioactive Release Permit
71124.06   Procedures   HSP-ZZ-00003       Dose Assessments from Liquid Effluents             11
2/20/2018
71124.06   Procedures   HSP-ZZ-00004       Projected Dose from Liquid Waste                   16
71124.06 Calibration Records Job 12504965.500
71124.06   Procedures   HTP-ZZ-02006       Liquid Radwaste Release Permit (Batch)             93
RW Bldg Disch Line Process Rad Mon Loop Cal
71124.06   Procedures   HTP-ZZ-02006       Liquid Radwaste Release Permit (Batch)             93
08/21/2018
71124.06   Procedures   HTP-ZZ-02007       Gaseous Radwaste Release Permit (Gas Decay         48
71124.06 Calibration Records Job 17502388.500
Tank)
Ctmt Bld Air Exg
71124.06   Procedures   HTP-ZZ-02008       Gaseous Radwaste Release Permit (Auxiliary/Fuel     30
Plenum (Unit Vent) Rad Xmt
Building Ventilation)
08/23/2018
71124.06   Procedures   HTP-ZZ-02009       Gaseous Radwaste Release Permit (Radwaste           29
 
Building Ventilation)
Inspection Procedure Type Designation
71124.06   Procedures   HTP-ZZ-03006       Use of Airborne Sampling Cart                       32
Description or Title
71124.06   Procedures   ISF-GH-0R10B       RW Building Exhaust Discharge Radiation Detector   32
Revision or Date 71124.06 Corrective Action Documents Condition Report
71124.06   Self-                           Nuclear Oversight Audit of Radiological and Non-    06/13/2018
201703216, 201703232 , 201703516 , 201800052 , 201800125 , 201801122 , 201801301 , 201802268 , 201802267 , 201802407 , 201802547 , 201803062 , 201803391 , 201805008 , 201805070 , 201805144 , 201805978 , 201805987 , 201805989 , 201806167 , 201900239 , 201900348 , 201900353 , 201900438
Assessments                      Radiological Environmental Monitoring Programs, AP
71124.06 Miscellaneous
18006
Callaway Energy Center 2017 Annual Radioactive Effluent Release Report
71124.06   Self-                           Nuclear Oversight Audit of Radiation Protection     03/27/2019
71124.06 Miscellaneous
Assessments                      AP19001
Callaway Energy Center
71124.07   Calculations HPCI 1092         Evaluation of the 2018 Annual Land Use Census       1
2018 Draft Annual Radioactive Effluent Release Report
71124.07   Calculations HPCI 18-01         Evaluation of the 2017 Annual Land Use Census       0
71124.06 Miscellaneous
71124.07   Calculations HPCI-1503         Calculation of Long- Term Meteorological Dispersion 1
Job 15510527
Inspection Type           Designation         Description or Title                               Revision or
FGG02A In-Place Bypass Leakage Test
Procedure                                                                                        Date
03/10/2017
Parameters
71124.06 Miscellaneous
71124.07   Calculations   HPCI-1506           Evaluation of Air Sampler Locations with Respect to 1
Job 16509259
the Recalculated Dispersion Parameters
FGK02B In-Place Bypass Leakage Test
71124.07   Calibration   Job 18504263       RD01-Primary Meteorological Tower Loop A           10/24/2018
05/31/2018
Records
71124.06 Miscellaneous
71124.07   Calibration   Job 18504272       RD01-Primary Meteorological Tower Loop B           10/25/2018
Job 17503239 FGE01 In-Place Bypass Leakage Test
Records
07/16/2018
71124.07   Calibration   Job 18511186       RD01-Primary Meteorological Tower Loop A           03/29/2019
71124.06 Procedures
Records
HSP-ZZ-00002 Radioactive Liquid Effluent Concentration
71124.07   Calibration   Job 18511189       RD01-Primary Meteorological Tower Loop B           03/25/2019
71124.06 Procedures
Records
HSP-ZZ-00003 Dose Assessments from Liquid Effluents
71124.07   Calibration   LAS-4179           Low volume Air Sampler Serial Number 10216         11/09/18
71124.06 Procedures
Records
HSP-ZZ-00004 Projected Dose from Liquid Waste
71124.07   Calibration   LAS-4182           Low Volume Air Sampler Serial Number 8977           07/20/2018
71124.06 Procedures
Records
HTP-ZZ-02006 Liquid Radwaste Release Permit (Batch)
71124.07   Calibration   LAS-4201           Low Volume Air Sampler Serial Number 8975           01/31/2019
71124.06 Procedures
Records
HTP-ZZ-02006 Liquid Radwaste Release Permit (Batch)
71124.07   Corrective     Condition Reports   201700071, 201700835, 201701864, 201702166,
71124.06 Procedures
Action                            201702981, 201703331, 201703581, 201705266,
HTP-ZZ-02007 Gaseous Radwaste Release Permit (Gas Decay Tank) 48 71124.06 Procedures
Documents                          201705398, 201705399, 201705403, 201705417,
HTP-ZZ-02008 Gaseous Radwaste Release Permit (Auxiliary/Fuel Building Ventilation)
201706786, 201706793, 201706794, 201801634,
71124.06 Procedures
201801736, 201801950, 201802361, 201803357,
HTP-ZZ-02009 Gaseous Radwaste Release Permit (Radwaste Building Ventilation)
201900612, 201900937, 201901217, 201902100
71124.06 Procedures
71124.07   Corrective     Condition Reports  201904252
HTP-ZZ-03006 Use of Airborne Sampling Cart
Action
71124.06 Procedures
Documents
ISF-GH-0R10B RW Building Exhaust Discharge Radiation Detector
Resulting from
71124.06 Self-Assessments
Inspection
Nuclear Oversight Audit of Radiological and Non
71124.07   Miscellaneous                     Environmental Dosimetry Company - Annual Quality   03/07/2018
-Radiological Environmental Monitoring Programs, AP
Assurance Status Report: January - December 2017
18006 06/13/20 18 71124.06 Self-Assessments
71124.07   Miscellaneous                     Environmental Dosimetry Company - Annual Quality   03/12/2019
Nuclear Oversight Audit of Radiation Protection AP19001 03/27/2019
Assurance Status Report: January - December 2018
71124.07 Calculations
71124.07   Miscellaneous AP18006             Nuclear Oversight Audit of Radiological and Non     06/13/2018
HPCI 1092 Evaluation of the 2018 Annual Land Use Census
Radiological Environmental Monitoring Programs
71124.07 Calculations
Inspection Type         Designation       Description or Title                               Revision or
HPCI 18-01 Evaluation of the 2017 Annual Land Use Census 0 71124.07 Calculations
Procedure                                                                                      Date
HPCI-1503 Calculation of Long
71124.07   Miscellaneous AP19001           Nuclear Oversight Audit of Radiation Protection     03/27/2019
- Term Meteorological Dispersion
71124.07   Miscellaneous APA-ZZ-01003       Off-Site Dose Calculation Manual                   23
Inspection Procedure Type Designation
71124.07   Miscellaneous AREOR             Annual Radiological Environmental Operating Report:
Description or Title
January 1- December 31, 2017
Revision or Date Parameters
71124.07   Miscellaneous AREOR             Annual Radiological Environmental Operating Report:
71124.07 Calculations
January 1- December 31, 2018
HPCI-1506 Evaluation of Air Sampler Locations with Respect to the Recalculated Dispersion Parameters
71124.07   Miscellaneous NAQA-17-0038       Audit Report 17-007 for the Audit of Environmental 09/01/2017
71124.07 Calibration Records Job 18504263
Dosimetry Company
RD01-Primary Meteorological Tower Loop A
71124.07   Procedures   HDP-ZZ-07000       Radiological Environmental Monitoring Program and   9
10/24/2018
Groundwater Protection Initiative
71124.07 Calibration Records Job 18504272
71124.07   Procedures   HTP-ZZ-04123-DTI- F&J DF-1T Low Volume Air Sampler Calibration         8
RD01-Primary Meteorological Tower Loop B
F&J-DF1T-CAL
10/25/2018
71124.07   Procedures   HTP-ZZ-07001-DTI- Collection and Shipping of Environmental Crop       7
71124.07 Calibration Records Job 18511186
Crop-Sampling      Samples
RD01-Primary Meteorological Tower Loop A
71124.07   Procedures   HTP-ZZ-07001-DTI- Collection and Shipping of Environmental Water       11
03/29/2019
Water-Sampling    Samples
71124.07 Calibration Records Job 18511189
71124.07   Procedures   HTP-ZZ-07101-DTI- REMP Sample Locations and Analysis Schedule         32
RD01-Primary Meteorological Tower Loop B
REMP-SMPL-
03/25/2019
SCHED
71124.07 Calibration Records LAS-4179 Low volume Air Sampler Serial Number 10216
71124.07   Procedures   HTP-ZZ-07103-RP- Evaluation and Reporting of REMP Data                 2
11/09/18 71124.07 Calibration Records LAS-4182 Low Volume Air Sampler Serial Number 8977
DTI-REMP-
07/20/2018
DATAEVAL
71124.07 Calibration Records LAS-4201 Low Volume Air Sampler Seri
71124.07   Procedures   ISL-RD-RD01A       Meteorological Monitoring Instruments - Elevator A 15
al Number 8975
Loop Calibration
01/31/2019
71124.07   Procedures   ISL-RD-RD01B       Meteorological Monitoring Instruments - Elevator B 10
71124.07 Corrective Action Documents Condition Report
Loop Calibration
s   201700071, 201700835, 201701864, 201702166, 201702981, 201703331, 201703581, 201705266, 201705398, 201705399, 201705403, 201705417, 201706786, 201706793, 201706794, 201801634, 201801736, 201801950, 201802361, 201803357, 201900612, 201900937, 201901217, 201902100 71124.07 Corrective Action Documents Resulting from Inspection
71124.07   Procedures   RP-DTI-ENVIRON- Environmental TLD Locations                            5
Condition Report
TLD LOCATIONS
s  201904252  71124.07 Miscellaneous
71124.07   Procedures   RP-DTI-           Response to Spills or Leaks of Radioactive Material 10
Environmental Dosimetry Company  
ENVIRONMENTAL- into Groundwater
- Annual Quality Assurance Status Report: January  
SPILLRESP
- December 2017
71124.08   Corrective   Condition Report   201701008, 201702081, 201704005, 201706627,
03/07/2018
Action                          201804430, 201804447, 201806969, 201900861,
71124.07 Miscellaneous
Documents                        201900930, 201901038, 201902796, 201904190
Environmental Dosimetry Company  
Inspection Type         Designation       Description or Title                               Revision or
- Annual Quality Assurance Status Report: January  
Procedure                                                                                      Date
- December 2018
71124.08   Miscellaneous                   Callaway Final Safety Analysis Report (FSAR) -     06/01/2018
03/12/2019
Chapter 11.4
71124.07 Miscellaneous
71124.08   Miscellaneous                   2018 RAM and Radwaste Shipping Log                 2018
AP18006 Nuclear Oversight Audit of Radiological and Non Radiological Environmental Monitoring Programs
71124.08   Miscellaneous                   Callaway Energy Center 2018 Annual Radioactive     2018
06/13/2018
Effluent Release Report
 
71124.08   Miscellaneous                   Callaway Energy Center 2017 Annual Radioactive     2017
Inspection Procedure Type Designation
Effluent Release Report
Description or Title
71124.08   Miscellaneous                   2017 RAM and Radwaste Shipping Log                 2017
Revision or Date 71124.07 Miscellaneous
71124.08   Procedures   APA-ZZ-01011       Process Control Program                             14
AP19001 Nuclear Oversight Audit of Radiation Protection
71124.08   Procedures   HTP-HC-09002       10 CFR 61 Sampling Program                         4
03/27/2019
71124.08   Procedures   HTP-ZZ-02005       Handling of Radioactive Material                   49
71124.07 Miscellaneous
71124.08   Procedures   HTP-ZZ-09003       Shipment of Radioactive Wastes                     6
APA-ZZ-01003 Off-Site Dose Calculation Manual
71124.08   Procedures   RDP-ZZ-00200       Radwaste Operational Guidelines                     21
71124.07 Miscellaneous
71124.08   Procedures   RTN-HC-01900       On-Site Storage Container Handling Procedure       6
AREOR Annual Radiological Environmental Operating Report: January 1- December 31, 2017
71124.08   Procedures   RTS-HC-00310       Primary Resin Sluice To Bulk Waste Disposal Station 47
71124.07 Miscellaneous
71124.08   Procedures   RTS-HC-00350       Primary Spent Resin Storage Tank Transfer To Bulk   14
AREOR Annual Radiological Environmental Operating Report: January 1- December 31, 2018
Waste Disposal Station
71124.07 Miscellaneous
71124.08   Procedures   RTS-ZZ-CH040       Handling of Transport Cask Model 14-215H           12
NAQA-17-0038 Audit Report 17
71124.08   Procedures   RTS-ZZ-CH050       Handling Procedure for CNS 8-120A Transport Cask   5
-007 for the Audit of Environmental Dosimetry Company
71124.08   Radiation     CA-M-20190409-24   RWY-4 & RWY-3 Radwaste Yard Plant (North &         04/09/2019
09/01/2017
Surveys                          South)
71124.07 Procedures
71124.08   Radiation     CA-M-20190415-05   7228 Drywaste Compactor Area - Quarterly Routine   04/14/2019
HDP-ZZ-07000 Radiological Environmental Monitoring Program and Groundwater Protection Initiative
Surveys
71124.07 Procedures
71124.08   Radiation     CA-M-20190421-24   7225 Quarterly Routine Survey - Low Level Drum     04/21/2019
HTP-ZZ-04123-DTI-F&J-DF1T-CAL F&J DF-1T Low Volume Air Sampler Calibration
Surveys                          Storage Area
71124.07 Procedures
71124.08   Radiation     CA-M-20190524-02   RSS-1 Characterization - Resin Liner #PO661751-16   05/24/2019
HTP-ZZ-07001-DTI-Crop-Sampling Collection and Shipping of Environmental Crop Samples 7 71124.07 Procedures
Surveys
HTP-ZZ-07001-DTI-Water-Sampling Collection and Shipping of Environmental Water Samples 11 71124.07 Procedures
71124.08   Self-                           EPRI Solid Radioactive Waste Program Assessment     07/14/2017
HTP-ZZ-07101-DTI-REMP-SMPL-SCHED REMP Sample Locations and Analysis Schedule
Assessments                      at Ameren Callaway Nuclear Power Plant
71124.07 Procedures
71124.08   Self-         201900029-035     Simple Self-Assessment: Shipping Program           05/02/2019
HTP-ZZ-07103-RP-DTI-REMP-DATAEVAL Evaluation and Reporting of REMP Data
Assessments
71124.07 Procedures
71124.08   Self-         AP19001           Ameren Nuclear Oversight Audit of Radiation         03/27/2019
ISL-RD-RD01A Meteorological Monitoring Instruments  
Assessments                      Protection
- Elevator A Loop Calibration
71124.08   Shipping     17-010             UN3321, RAM, LSA-11, Class 7 (Drummed               06/22/2017
71124.07 Procedures
Inspection Type       Designation         Description or Title                             Revision or
ISL-RD-RD01B Meteorological Monitoring Instruments  
Procedure                                                                                  Date
- Elevator B Loop Calibration
Records                       Mechanical Filters)
71124.07 Procedures
71124.08   Shipping   17-012             UN3321, RAM, LSA-II, Class 7 (Dewatered Resin)   07/12/2017
RP-DTI-ENVIRON-TLD LOCATIONS
Records
Environmental TLD Locations
71124.08   Shipping   17-061             UN2912, RAM, LSA-I, Class 7 (Dry Active Waste     11/17/2017
71124.07 Procedures
Records                        Cycle 21)
RP-DTI-ENVIRONMENTAL
71124.08   Shipping   18-001             UN3321, RAM, LSA-II, Class 7 (Dewatered Resin and 01/12/2018
-SPILLRESP Response to Spills or Leaks of Radioactive Material into Groundwater
Records                        Charcoal)
71124.08 Corrective Action Documents Condition Report
71124.08   Shipping   18-010             UN2911, RAM, Excepted Package, Class 7           04/12/2018
01701008, 201702081 , 201704005 , 201706627 , 201804430 , 201804447 , 201806969 , 201900861 , 201900930 , 201901038 , 201902796 , 201904190
Records                        (Instruments)
Inspection Procedure Type Designation
71124.08   Shipping   18-018             UN2911, RAM, Excepted Package, Class 7           09/20/2018
Description or Title
Records                        (Instruments)
Revision or Date 71124.08 Miscellaneous
71124.08   Shipping   18-036             UN2912, RAM, LSA-I, Class 7 (Dry Active Waste)   12/26/2018
Callaway Final Safety Analysis Report (FSAR)  
Records
- Chapter 11.4 06/01/2018
71124.08   Shipping   19-005             UN3321, RAM, LSA-II, Class 7 (Resin and Charcoal) 03/19/2019
71124.08 Miscellaneous
Records
2018 RAM and Radwaste Shipping Log
71124.08   Shipping   19-021             UN2912, RAM, LSA-I, Class 7 (Resin)               06/11/2019
2018 71124.08 Miscellaneous
Records
Callaway Energy Center 2018 Annual Radioactive Effluent Release Report
71153     Corrective Condition Reports   201901943, 201903787, 201903832
2018 71124.08 Miscellaneous
Action
Callaway Energy Center 2017 Annual Radioactive Effluent Release Report
Documents
2017 71124.08 Miscellaneous
2017 RAM and Radwaste Shipping Log
2017 71124.08 Procedures
APA-ZZ-01011 Process Control Program
71124.08 Procedures
HTP-HC-09002 10 CFR 61 Sampling Program
71124.08 Procedures
HTP-ZZ-02005 Handling of Radioactive Material
71124.08 Procedures
HTP-ZZ-09003 Shipment of Radioactive Wastes
71124.08 Procedures
RDP-ZZ-00200 Radwaste Operational Guidelines
71124.08 Procedures
RTN-HC-01900 On-Site Storage Container Handling Procedure
71124.08 Procedures
RTS-HC-00310 Primary Resin Sluice To Bulk Waste Disposal Station
71124.08 Procedures
RTS-HC-00350 Primary Spent Resin Storage Tank Transfer To Bulk Waste Disposal Station
71124.08 Procedures
RTS-ZZ-CH040 Handling of Transport Cask Model 14
-215H 12 71124.08 Procedures
RTS-ZZ-CH050 Handling Procedure for CNS 8
-120A Transport Cask
71124.08 Radiation Surveys CA-M-20190409-24 RWY-4 & RWY-3 Radwaste Yard Plant (North & South) 04/09/2019
71124.08 Radiation Surveys CA-M-20190415-05 7228 Drywaste Compactor Area  
- Quarterly Routine
04/14/2019
71124.08 Radiation Surveys CA-M-20190421-24 7225 Quarterly Routine Survey  
- Low Level Drum Storage Area
04/21/2019
71124.08 Radiation Surveys CA-M-20190524-02 RSS-1 Characterization  
- Resin Liner #PO661751
-16 05/24/2019
71124.08 Self-Assessments
EPRI Solid Radioactive Waste Program Assessment at Ameren Callaway Nuclear Power Plant
07/14/2017
71124.08 Self-Assessments
201900029-035 Simple Self
-Assessment: Shipping Program 05/02/2019
71124.08 Self-Assessments
AP19001 Ameren Nuclear Oversight Audit of Radiation Protection
03/27/2019
71124.08 Shipping 17-010 UN3321, RAM, LSA
-11, Class 7 (Drummed 06/22/2017
 
Inspection Procedure Type Designation
Description or Title
Revision or Date Records Mechanical Filters)
71124.08 Shipping Records 17-012 UN3321, RAM, LSA
-II, Class 7 (Dewatered Resin)
07/12/2017
71124.08 Shipping Records 17-061 UN2912, RAM, LSA
-I, Class 7 (Dry Active Waste Cycle 21) 11/17/2017
71124.08 Shipping Records 18-001 UN3321, RAM, LSA
-II, Class 7 (Dewatered Resin and Charcoal) 01/12/2018 71124.08 Shipping Records 18-010 UN2911, RAM, Excepted Package, Class 7 (Instruments)
04/12/2018
71124.08 Shipping Records 18-018 UN2911, RAM, Excepted Package, Class 7 (Instruments)
09/20/2018
71124.08 Shipping Records 18-036 UN2912, RAM, LSA-I, Class 7 (Dry Active Waste)
2/26/2018
71124.08 Shipping Records 19-005 UN3321, RAM, LSA
-II, Class 7 (Resin and Charcoal)
03/19/2019
71124.08 Shipping Records 19-021 UN2912, RAM, LSA
-I, Class 7 (Resin)
06/11/2019
71153 Corrective Action Documents Condition Reports
201901943, 201903787, 201903832
 
The following items are requested for the
The following items are requested for the
Occupational
Occupational Radiation Safety Inspection
Radiation Safety Inspection
at Callaway
at Callaway   Dates of Inspection: 04/08/2019
Dates of Inspection: 04/08/2019 to 04/12/2019
to 04/12/2019
Integrated Report 2019002
Integrated Report 2019002 Inspection areas are listed in the attachments below.
Inspection areas are listed in the attachments below.
Please provide the requested information on or before Monday, March 25, 2019
Please provide the requested information on or before Monday, March 25, 2019.
. Please submit this information using the same lettering system as below.
Please submit this information using the same lettering system as below. For example, all
For example, all contacts and phone numbers for Inspection Procedure 71124.0
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
should be in a file/folder titled  
1-A, applicable organization charts in file/folder 1-B, etc.
"1-A," applicable organization charts in file/folder "
The information should be provided in electronic format or a secure document management
1-B," etc. The information should be provided in electronic format or a secure document management service. If information is placed on ims.certrec.com, please ensure the inspection exit date
service. If information is placed on ims.certrec.com, please ensure the inspection exit date
entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the
entered is at least 30 days later than the onsite inspection dates, so the inspectors will have
report. In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
access to the information while writing the report.
If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
In addition to the corrective action document lists provided for each inspection procedure listed
If you have any questions or comments, please contact
below, please provide updated lists of corrective action documents at the entrance meeting.
Natasha Greene at 817
The dates for these lists should range from the end dates of the original lists to the day of the
-200-1154 or via
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
e-mail at Natasha.Greene@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.
This letter does not contain new or amended information collection requirements subject
: [[contact::S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget]], control number 3150
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
-0011.
collection requirements were approved by the Office of Management and Budget,
1. Radiological Hazard Assessment and Exposure Controls (71124.01) and Performance Indicator Verification (71151)
control number 3150-0011.
Date of Last Inspection:
1. Radiological Hazard Assessment and Exposure Controls (71124.01) and
November 5, 2018
Performance Indicator Verification (71151)
Date of Last Inspection:         November 5, 2018
A. List of contacts and telephone numbers for the Radiation Protection Organization Staff
A. List of contacts and telephone numbers for the Radiation Protection Organization Staff
and Technicians, as well as the Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell numbers are appropriate, then please include them as well.
and Technicians, as well as the Licensing/Regulatory Affairs staff. Please include area
B. Applicable organization charts
code and prefix. If work cell numbers are appropriate, then please include them as well.
including position or job titles. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
B. Applicable organization charts including position or job titles. Please include as
: [[contact::C. Copies of audits]], self
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
-assessments, LARs, and LERs written since the last inspection date , related to this inspection area
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
D. Procedure indexes for the radiation protection procedures
: [[contact::C. Copies of audits]], self-assessments, LARs, and LERs written since the last inspection
and other related disciplines.
date, related to this inspection area
E. Please provide procedures related to the following
D. Procedure indexes for the radiation protection procedures and other related disciplines.
areas noted below. Additional
E. Please provide procedures related to the following areas noted below. Additional
procedures may be requested by number
procedures may be requested by number after the inspector reviews the procedure
after the inspector reviews the procedure indexes. 1. Radiation Protection Program
indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations, if not included in #1.
2. Radiation Protection Conduct of Operations, if not included in #1.
3. Personnel Dosimetry
3. Personnel Dosimetry
Line 1,248: Line 1,072:
8. Radioactive Source Inventory and Control
8. Radioactive Source Inventory and Control
9. Fuel Pool Inventory Access and Control
9. Fuel Pool Inventory Access and Control
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
committed to relative to this program. Please include the revision and/or date for the
G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) since the last inspection date.
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) since the last inspection date.
1. Initiated by the radiation protection organization
1. Initiated by the radiation protection organization
2. Assigned to the radiation protection organization
2. Assigned to the radiation protection organization
NOTE: The se lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.)
NOTE: These lists should include a description of the condition that provides sufficient
and the search criteria used. Please provide in document formats
detail that the inspectors can ascertain the regulatory impact, the significance
which are "sortable" and "searchable" so that inspector
level assigned to the condition, the status of the action (e.g., open, working,
s can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
closed, etc.) and the search criteria used. Please provide in document formats
H. List of radiologically significant work activities scheduled to be conducted during the inspection period
which are sortable and searchable so that inspectors can quickly and
. (If the inspection is scheduled during an outage, please also include a list of work activities greater than 1 rem, scheduled during the outage with the dose
efficiently determine appropriate sampling and perform word searches, as
estimate for the work activity.) Please include the radiological risk assigned to each activity.  
needed. (Excel spreadsheets are the preferred format.) If codes are used,
: [[contact::I. Provide a summary of any changes to plant operation that have resulted or could result in a significant new radiological hazard. For each change]], please provide the assessment conducted on the potential impact and any monitoring done to evaluate it.
please provide a legend for each column where a code is used.
J. List of active radiation work permits
H. List of radiologically significant work activities scheduled to be conducted during the
and those specifically planned for the on
inspection period. (If the inspection is scheduled during an outage, please also include a
-site inspection week.
list of work activities greater than 1 rem, scheduled during the outage with the dose
K. Please provide a list of air samples taken to verify engineering controls and a separate list for breathing air samples in airborne radiation areas or high contamination work areas. Please include the RWP the breathing air sampling supports.
estimate for the work activity.) Please include the radiological risk assigned to each
: [[contact::L. Please provide the current radioactive source inventory ]], listing all radioactive sources
activity.
that are required to be leak tested. Indicate which sources are deemed 10 CFR Part 20, Appendix E, Category 1 or Category 2. Please indicate the radioisotope, initial and current activity (w/assay date), and storage location for each applicable source.
I. Provide a summary of any changes to plant operation that have resulted or could result
M. The last two leak test results for all required/applicable radioactive sources that have failed its leak test within the last two years. Provide any applicable condition reports.
in a significant new radiological hazard. For each change, please provide the
N. A list of all
assessment conducted on the potential impact and any monitoring done to evaluate it.
non-fuel items stored in the spent fuel pools, and if
J. List of active radiation work permits and those specifically planned for the on-site
available, their appropriate dose rates (Contact / @ 30cm)
inspection week.
O. A list of radiological controlled area entries greater than 100 millirem
K. Please provide a list of air samples taken to verify engineering controls and a separate
, since the last inspection date. The list should include the date of entry, some form of worker identification, the radiation work permit used by the worker, dose accrued by the worker, and the electronic dosimeter dose alarm set
list for breathing air samples in airborne radiation areas or high contamination work
-point used during the entry (for Occupational Radiation Safety Performance Indicator verification in accordance with IP
areas. Please include the RWP the breathing air sampling supports.
71151).  
: [[contact::L. Please provide the current radioactive source inventory]], listing all radioactive sources
: [[contact::P. A list describing VHRAs and TS HRAs (> 1 rem/hour) that are current and historical. Include their current status]], locations, and control measures.
that are required to be leak tested. Indicate which sources are deemed 10 CFR Part 20,
Q. Temporary effluent monitor locations and calibrations (AMS
Appendix E, Category 1 or Category 2. Please indicate the radioisotope, initial and
-4) used to monitor normally closed doors or off
current activity (w/assay date), and storage location for each applicable source.
-normal release points (e.g., equipment hatch or turbine heater bay doors). Include any CRs associated with this monitoring or instrumentation.
M. The last two leak test results for all required/applicable radioactive sources that have
failed its leak test within the last two years. Provide any applicable condition reports.
: [[contact::N. A list of all non-fuel items stored in the spent fuel pools]], and if available, their appropriate
dose rates (Contact / @ 30cm)
: [[contact::O. A list of radiological controlled area entries greater than 100 millirem]], since the last
inspection date. The list should include the date of entry, some form of worker
identification, the radiation work permit used by the worker, dose accrued by the worker,
and the electronic dosimeter dose alarm set-point used during the entry (for
Occupational Radiation Safety Performance Indicator verification in accordance with IP
71151).
P. A list describing VHRAs and TS HRAs (> 1 rem/hour) that are current and historical.
Include their current status, locations, and control measures.
Q. Temporary effluent monitor locations and calibrations (AMS-4) used to monitor normally
closed doors or off-normal release points (e.g., equipment hatch or turbine heater bay
doors). Include any CRs associated with this monitoring or instrumentation.
2. Occupational ALARA Planning and Controls (71124.02)
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:
Date of Last Inspection:         May 21, 2018
May 21, 2018
: [[contact::A. List of contacts and telephone numbers for ALARA program personnel]], as well as the
A. List of contacts
Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell
and telephone numbers for ALARA program personnel, as well as the Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell numbers are appropriate, then please include them as well.
numbers are appropriate, then please include them as well.
B. Applicable organization charts
B. Applicable organization charts including position or job titles. Please include as
including position or job titles. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
: [[contact::C. Copies of audits]], self
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
-assessments, LARs, and LERs, written since the date of last inspection, focusing on ALARA
: [[contact::C. Copies of audits]], self-assessments, LARs, and LERs, written since the date of last
D. Procedure index for ALARA Program
inspection, focusing on ALARA
procedures
D. Procedure index for ALARA Program procedures and other related disciplines.
and other related disciplines.
E. Please provide specific procedures related to the following areas noted below.
 
Additional Specific Procedures may be requested by number after the inspector reviews
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number
the procedure indexes.
after the inspector reviews the procedure indexes.
1. ALARA Program
1. ALARA Program
2. ALARA Planning
2. ALARA Planning
Line 1,299: Line 1,138:
4. ALARA Committee
4. ALARA Committee
5. Radiation Work Permit Preparation
5. Radiation Work Permit Preparation
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
: [[contact::G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of last inspection]], related to the ALARA program, including exceeding RWP Dose Estimates.
committed to relative to this program. Please include the revision and/or date for the
NOTE: The se lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.)
commitment and where this may be located in your current licensing basis documents.
and the search criteria used. Please provide in document formats
G. Please provide a summary list of corrective action documents (including corporate and
which are "sortable" and "searchable" so that inspector
sub-tiered systems) written since the date of last inspection, related to the ALARA
s can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
program, including exceeding RWP Dose Estimates.
: [[contact::H. List of work activities (RWPs) greater than 1 rem]], since date of last inspection , including the original dose estimate
NOTE: These lists should include a description of the condition that provides sufficient
s and actual doses accrued. (Excel format preferred)
detail that the inspectors can ascertain the regulatory impact, the significance
. Please provide all revisions/changes, as well as any related RWPs that support the work activity.
level assigned to the condition, the status of the action (e.g., open, working,
: [[contact::I. List of active work activities (RWPs) that will be in use while we are onsite]], including the dose and dose rate settings, and if available, the planned dose. Include planning documents and surveys. Include radiological risk assessments and proposed control measures.  
closed, etc.) and the search criteria used. Please provide in document formats
: [[contact::J. Site dose totals for the past 3 years (based on dose of record). Also provide the current year-to-date (YTD) collective radiation exposure (CRE). In addition]], please provide another document that separates the online and outage doses for the past 3 years.
which are sortable and searchable so that inspectors can quickly and
: [[contact::K. Most recent assessment of your isotopic mix]], including the hard
efficiently determine appropriate sampling and perform word searches, as
-to-detect radionuclides and alpha hazards. Include a list of new and historical exposure issues (radiological source term or high exposure areas/activities).
needed. (Excel spreadsheets are the preferred format.) If codes are used,
: [[contact::L. If available]], provide a copy of the lessons learned from the most recently completed outage for each unit. Include a summary list of any associated corrective action documents and the current status of any corrective actions assigned.
please provide a legend for each column where a code is used.
M. Please provide the methods/reports that are in your process to meet the requirements of 10 CFR 20.1101(c) for periodic review of your RP program.
: [[contact::H. List of work activities (RWPs) greater than 1 rem]], since date of last inspection,
including the original dose estimates and actual doses accrued. (Excel format
preferred). Please provide all revisions/changes, as well as any related RWPs that
support the work activity.
: [[contact::I. List of active work activities (RWPs) that will be in use while we are onsite]], including the
dose and dose rate settings, and if available, the planned dose. Include planning
documents and surveys. Include radiological risk assessments and proposed control
measures.
J. Site dose totals for the past 3 years (based on dose of record). Also provide the current
year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide
another document that separates the online and outage doses for the past 3 years.
: [[contact::K. Most recent assessment of your isotopic mix]], including the hard-to-detect radionuclides
and alpha hazards. Include a list of new and historical exposure issues (radiological
source term or high exposure areas/activities).
: [[contact::L. If available]], provide a copy of the lessons learned from the most recently completed
outage for each unit. Include a summary list of any associated corrective action
documents and the current status of any corrective actions assigned.
M. Please provide the methods/reports that are in your process to meet the requirements of
CFR 20.1101(c) for periodic review of your RP program.
N. Current exposure trends (BRAC dose rates and/or source term information).
N. Current exposure trends (BRAC dose rates and/or source term information).
The following items are requested for the
The following items are requested for the
Public Radiation Safety Inspection
Public Radiation Safety Inspection
at Callaway   Dates of Inspection: 06/10/2019
at Callaway
to 06/14/2019
Dates of Inspection: 06/10/2019 to 06/14/2019
Integrated Report 2019002 Inspection areas are listed in the attachments below.
Integrated Report 2019002
Please provide the requested information on or before Friday, May 24, 2019
Inspection areas are listed in the attachments below.
. Please submit this information using th
Please provide the requested information on or before Friday, May 24, 2019.
e same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0
Please submit this information using the same lettering system as below. For example, all
should be in a file/folder titled  
contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled
"5-A," applicable organization charts in file/folder "
5-A, applicable organization charts in file/folder 5-B, etc.
5-B," etc. The information should be provided in electronic format or a secure document management service. If information is placed on a secured document management system, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
The information should be provided in electronic format or a secure document management
In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for
service. If information is placed on a secured document management system, please ensure
these lists should range from the end dates of the original lists to the day of the entrance meeting.
the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the
If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
inspectors will have access to the information while writing the report.
If you have any questions or comments, please contact Natasha Greene at 817
In addition to the corrective action document lists provided for each inspection procedure listed
-200-1154 or via
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via
e-mail at Natasha.Greene@nrc.gov.
e-mail at Natasha.Greene@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.
This letter does not contain new or amended information collection requirements subject
: [[contact::S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget]], control number 3
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
150-0011.
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
5. Radiation Monitoring Instrumentation (71124.05)
5. Radiation Monitoring Instrumentation (71124.05)
Date of Last Inspection:
Date of Last Inspection:         February 27, 2017
February 27, 2017
A. List of contacts and telephone numbers for the following areas below. Please include
A. List of contacts and telephone numbers for the following areas
area code and prefix. If work cell numbers are appropriate, then please include them as
below. Please include area code and prefix. If work cell numbers are appropriate, then please include them as well. 1. Process monitor calibration
well.
(Include Chemistry, Systems Engineering and I&C, as applicable)
1. Process monitor calibration (Include Chemistry, Systems Engineering and I&C, as
2. Radiation protection instrument calibration
applicable)
(Portable and Stationary)
2. Radiation protection instrument calibration (Portable and Stationary)
3. Installed instrument calibrations
3. Installed instrument calibrations (Include Systems Engineering and I&C)
(Include Systems Engineering and I&C)
4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as
4. Count room and Laboratory instrument calibrations
applicable)
(Include RP and Chemistry, as applicable)
5. EP contacts for Equipment Important to Emergency Response/Preparedness
5. EP contacts for Equipment Important to Emergency Response/Preparedness (EITER) 6. Licensing/Regulatory Affairs
      (EITER)
: [[contact::B. Applicable organization charts]], including position or job titles. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
6. Licensing/Regulatory Affairs
: [[contact::C. Copies of audits]], self
: [[contact::B. Applicable organization charts]], including position or job titles. Please include as
-assessments, vendor or NUPIC audits for contractor support , LARs, and LERs, performed since the date of the last inspection
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
, related to:
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
1. Portable Radiation instruments: Area radiation monitors, portable continuous air monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational air sampling), electronic dosimeters, teledosimetry
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits for contractor support,
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel contamination monitors, or whole body counters
LARs, and LERs, performed since the date of the last inspection, related to:
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors (non-effluent), criticality monitors, accident monitors
1. Portable Radiation instruments: Area radiation monitors, portable continuous air
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents): Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench
monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational
-top counters
air sampling), electronic dosimeters, teledosimetry
D. Procedure index
2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel
es for radiation protection procedures
contamination monitors, or whole body counters
and other related disciplines.
3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors
1. Calibration, use
      (non-effluent), criticality monitors, accident monitors
, and operation of continuous air monitors, portable survey instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):
2. Calibration use and operation of portal monitors, small article monitors, personnel contamination monitors, and whole body counters
Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters
3. Calibration of installed area radiation monitors, process monitors, criticality monitors, and accident monitors 4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)
D. Procedure indexes for radiation protection procedures and other related disciplines.
(include bench top counters here)
1. Calibration, use, and operation of continuous air monitors, portable survey
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as appropriate.
instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry
E. Please provide specific procedures related to
2. Calibration use and operation of portal monitors, small article monitors, personnel
the following areas
contamination monitors, and whole body counters
noted below. Additional
3. Calibration of installed area radiation monitors, process monitors, criticality monitors,
procedures may be requested by number
and accident monitors
after the inspector reviews the
4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)
      (include bench top counters here)
NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as
appropriate.
E. Please provide specific procedures related to the following areas noted below.
Additional procedures may be requested by number after the inspector reviews the
procedure index.
procedure index.
1. Calibration of portable ion chambers
1. Calibration of portable ion chambers
2. Calibration of Friskers
2. Calibration of Friskers
3. Calibration of telescoping high range instruments
3. Calibration of telescoping high range instruments
4. Calibration
4. Calibration of portable neutron instruments
of portable neutron instruments
5. Calibration of SAMs
5. Calibration of SAMs
6. Whole body counter calibration
6. Whole body counter calibration
7. Laboratory instrumentation quality control
7. Laboratory instrumentation quality control
8. Calibration of Containment/Drywell high range radiation monitor
8. Calibration of Containment/Drywell high range radiation monitor
F. Please provide a list of NRC Regulatory Guides and NUREGs that
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
committed to relative to this program. Please include the revision and/or date for the
: [[contact::G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of the last inspection ]], related to the following programs: 1. Area radiation monitors, continuous air monitors, portable survey instruments, electronic dosimeters, and teledosimetr
commitment and where this may be located in your current licensing basis documents.
2. Portal monitors, small article monitors, personnel contamination monitors, and whole body counters
G. Please provide a summary list of corrective action documents (including corporate and
3. Installed radiation monitors
sub-tiered systems) written since the date of the last inspection, related to the following
, criticality monitors, accident range monitors
programs:
1. Area radiation monitors, continuous air monitors, portable survey instruments,
electronic dosimeters, and teledosimetry
2. Portal monitors, small article monitors, personnel contamination monitors, and whole
body counters
3. Installed radiation monitors, criticality monitors, accident range monitors
4. Count room radiation instruments
4. Count room radiation instruments
NOTE: The se lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.)
NOTE: These lists should include a description of the condition that provides
and the search criteria used. Please provide in document formats which are "sortable" and "searchable" so that inspector
sufficient detail that the inspectors can ascertain the regulatory impact, the
s can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
significance level assigned to the condition, the status of the action (e.g., open,
H. State the required calibration frequency and provide the most recent
working, closed, etc.) and the search criteria used. Please provide in document
calibration data for the whole body counter
formats which are sortable and searchable so that inspectors can quickly and
s, at least one portable survey instrument, one area radiation monitor, one air sampler, one continuous air monitor, and one drywell/containment high
efficiently determine appropriate sampling and perform word searches, as
-range monitor.
needed. (Excel spreadsheets are the preferred format.) If codes are used,
: [[contact::I. Provide a list of any scheduled calibrations]], while we are onsite, for the instrumentation noted in request above, in 5
please provide a legend for each column where a code is used.
-I. J. Provide the alarm set point values for the portal and personnel contamination monitors in operation. K. Radiation Monitoring System health report for the previous 12 months
H. State the required calibration frequency and provide the most recent calibration data for
: [[contact::L. Provide the following lists of instruments to include make]], model, identifier (S/N or plant ID), and location:
the whole body counters, at least one portable survey instrument, one area radiation
1. Portable radiation instruments currently in use
monitor, one air sampler, one continuous air monitor, and one drywell/containment high-
(for EADs just make, model, and quantity).
range monitor.
: [[contact::I. Provide a list of any scheduled calibrations]], while we are onsite, for the instrumentation
noted in request above, in 5-I.
J. Provide the alarm set point values for the portal and personnel contamination monitors in
operation.
K. Radiation Monitoring System health report for the previous 12 months
: [[contact::L. Provide the following lists of instruments to include make]], model, identifier (S/N or plant
ID), and location:
1. Portable radiation instruments currently in use (for EADs just make, model, and
quantity).
2. Stationary radiation instruments currently in use.
2. Stationary radiation instruments currently in use.
3. Installed Radiation monitors
3. Installed Radiation monitors
a. Area radiation monitors and
a. Area radiation monitors and
b. Process radiation monitors.
b. Process radiation monitors.
(Include their instrumentation designator, function and calibration procedure number and title.) Please indicate which, if any, detectors have been replaced within the past 2 years (since the last inspection).
              (Include their instrumentation designator, function and calibration procedure
number and title.) Please indicate which, if any, detectors have been
replaced within the past 2 years (since the last inspection).
c. Radiation instrumentation abandoned in place.
c. Radiation instrumentation abandoned in place.
d. Radiation instrumentation covered
d. Radiation instrumentation covered by the maintenance rule.
by the maintenance rule.
: [[contact::M. Provide a list of sources used routinely for source check of portable]], stationary, and
: [[contact::M. Provide a list of sources used routinely for source check of portable]], stationary, and installed radiation monitoring instruments.
installed radiation monitoring instruments.
N. Provide the NIST traceability and calibration or verification of the primary sources for instrument calibration and the procedures used to achieve this.
N. Provide the NIST traceability and calibration or verification of the primary sources for
instrument calibration and the procedures used to achieve this.
6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)
Date of Last Inspection:
Date of Last Inspection:       February 27, 2017
February 27, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
: [[contact::A. List of contacts and telephone numbers for the following areas. Please include area code and prefix. If work cell numbers are appropriate]], then please include them as well.
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Radiological effluent control
1. Radiological effluent control (liquid & gaseous) and reporting
(liquid & gaseous) and reporting  
        (RP, Chemistry, RW, Ops, etc.)
(RP, Chemistry, RW, Ops, etc.)
2. Effluent Monitor calibration (liquid and gaseous) and maintenance
2. Effluent Monitor calibration (liquid and gaseous) and maintenance  
        (RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)
3. Engineered safety feature air cleaning systems for effluent release
3. Engineered safety feature air cleaning systems
        (Systems Engineering, I&C, Maintenance, etc.)
for effluent release  
(Systems Engineering, I&C, Maintenance, etc.)
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
B. Applicable organization charts including position or job titles
B. Applicable organization charts including position or job titles for the above individuals
for the above individuals and also for their supportive Management. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
and also for their supportive Management. Please include as appropriate for your site,
: [[contact::C. Copies of audits]], self
Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency
-assessments, vendor or NUPIC audits of contractor support, and LERs written since the date of the last inspection , related to:
Protection. (Recent pictures are appreciated.)
1. Radioactive effluents
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits of contractor support, and
and effluent radiation monitors
LERs written since the date of the last inspection, related to:
1. Radioactive effluents and effluent radiation monitors
2. Engineered Safety Feature Air cleaning systems
2. Engineered Safety Feature Air cleaning systems
D. Procedure indexes for the following areas
D. Procedure indexes for the following areas and related disciplines.
and related disciplines.
1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)
1. Radioactive effluents
2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for
and effluent radiation monitors (to include the flow monitors)
effluents)
2. Engineered Safety Feature Air cleaning systems
E. Please provide specific procedures related to the following areas noted below.
(both TS and no
Additional procedures may be requested by number after the inspector reviews the
n-TS systems for effluents)
procedure indexes.
E. Please provide specific procedures related to the following areas
1. Sampling and analysis of radioactive effluents
noted below. Additional
2. Effluent monitor setpoint determination
procedures may be requested by number
after the inspector reviews the procedure indexes.  
 
1. Sampling and analysis of radioactive effluen
ts 2. Effluent monitor setpoint determination
3. Generating radioactive effluent release permits
3. Generating radioactive effluent release permits
4. Effluent Monitor Calibrations (Include associated flow monitors)
4. Effluent Monitor Calibrations (Include associated flow monitors)
5. Laboratory instrumentation quality control
5. Laboratory instrumentation quality control
6. In-place testing of HEPA filters and charcoal adsorbers
6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust
for TS effluent exhaust systems and other effluent air
systems and other effluent air-cleaning systems, but not breathing air systems
-cleaning systems, but not breathing air systems
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
committed to relative to this program. Please include the revision and/or date for the
G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of the last inspection
commitment and where this may be located in your current licensing basis documents.
, associated with:
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, associated with:
1. Radioactive effluents
1. Radioactive effluents
2. Effluent radiation monitors
2. Effluent radiation monitors (include associated effluent flow monitors)
(include associated effluent flow monitors)
3. Engineered Safety Feature Air cleaning systems (effluents, not breathing air)
3. Engineered Safety Feature Air cleaning systems
NOTE: These lists should include a description of the condition that provides
(effluents, not breathing air)
sufficient detail that the inspectors can ascertain the regulatory impact, the
NOTE: The se lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.)
significance level assigned to the condition, the status of the action (e.g., open,
and the search criteria used. Please provide in document formats which are "sortable" and "searchable" so that inspector
working, closed, etc.) and the search criteria used. Please provide in document
s can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
formats which are sortable and searchable so that inspectors can quickly and
efficiently determine appropriate sampling and perform word searches, as
needed. (Excel spreadsheets are the preferred format.) If codes are used,
please provide a legend for each column where a code is used.
H. Annual Radioactive Effluent Release Reports for the latest two calendar years
H. Annual Radioactive Effluent Release Reports for the latest two calendar years
I. Current revision of the Offsite Dose Calculation Manual
: [[contact::I. Current revision of the Offsite Dose Calculation Manual (or other name]], but include all
(or other name, but include all parts for effluents) and any changes made since the last inspection.
parts for effluents) and any changes made since the last inspection.
J. The inter-laboratory comparison results for laboratory quality control performance of effluent sample analysis
J. The inter-laboratory comparison results for laboratory quality control performance of
for the latest two calendar years
effluent sample analysis for the latest two calendar years
K. Effluent sampling schedule for the week of the inspection
K. Effluent sampling schedule for the week of the inspection
: [[contact::L. Provide the last three annual trends of vent/stack effluent flow rates]], by chart or table.
: [[contact::L. Provide the last three annual trends of vent/stack effluent flow rates]], by chart or table.
M. Operations department
M. Operations department (or other responsible dept.) log records for effluent monitors
(or other responsible dept.) log records for effluent monitors removed from service or out of service
removed from service or out of service or a list of the same and compensatory actions
or a list of the same and compensatory actions taken during the out of service condition.
taken during the out of service condition.
N. List ing or log of liquid and gaseous release permits since the date of the last inspection
N. Listing or log of liquid and gaseous release permits since the date of the last inspection
O. A list of the technical specification
O. A list of the technical specification-required air cleaning systems with the two most
-required air cleaning systems with the two most recent surveillance test dates of in
recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal
-place filter testing (of HEPA filters and charcoal adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers associated with the surveillances
adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers
(and their system number/name).
associated with the surveillances (and their system number/name).
: [[contact::P. System Health Report for radiation monitoring instrumentation. Also]], please provide a specific list of all effluent radiation monitors that were considered inoperable for 7 days or more since the date of the last inspection
: [[contact::P. System Health Report for radiation monitoring instrumentation. Also]], please provide a
. If applicable, please provide the relative Special Report and condition report(s).
specific list of all effluent radiation monitors that were considered inoperable for 7 days
If not covered by maintenance rule, please provide rationale.
or more since the date of the last inspection. If applicable, please provide the relative
Q. A list of significant changes made to the
Special Report and condition report(s). If not covered by maintenance rule, please
gaseous and
provide rationale.
liquid effluent process monitoring
Q. A list of significant changes made to the gaseous and liquid effluent process monitoring
system since
system since the date of the last inspection. If applicable, please provide the
the date of the last inspection
corresponding UFSAR section in which this change was documented.
. If applicable, please provide the corresponding UFSAR section in which this change was documented.
R. A list of any occurrence in which a non-radioactive system was contaminated by a
R. A list of any occurrence in which a non
radioactive system since the date of the last inspection. Please include any relevant
-radioactive system was contaminated by a radioactive system
condition report(s).
since the date of the
last inspection
. Please include any relevant condition report(s).
S. Current Part 61 analyses for hard to detect radionuclides
S. Current Part 61 analyses for hard to detect radionuclides
T. Latest Land Use Census (coordinate with 71124.07)
T. Latest Land Use Census (coordinate with 71124.07)
U. Effluent based procedures for EALs or EOPs.
U. Effluent based procedures for EALs or EOPs.
7. Radiological Environmental Monitoring Program (71124.07)
7. Radiological Environmental Monitoring Program (71124.07)
Date of Last Inspection:
Date of Last Inspection:           February 27, 2017
February 27, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
: [[contact::A. List of contacts and telephone numbers for the following areas. Please include area code and prefix. If work cell numbers are appropriate]], then please include them as we
code and prefix. If work cell numbers are appropriate, then please include them as well.
ll. 1. Radiological environmental monitoring
1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)
(RP, Chemistry, I&C, etc.)
2. Meteorological monitoring (RP, Chemistry, EP, I&C, System Engineering, etc.)
2. Meteorological monitoring
(RP, Chemistry, EP, I&C, System Engineering, etc.)
3. Maintenance and calibration of the above equipment
3. Maintenance and calibration of the above equipment
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
: [[contact::B. Applicable organization charts including position or job titles. Please include as appropriate for your site]], Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
B. Applicable organization charts including position or job titles. Please include as
: [[contact::C. Copies of audits]], self
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
-assessments, vendor or NUPIC audits of contractor support, and LERs written since the date of the last inspection , related to:
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
1. Radiological environmental monitoring program (including contractor environmental laboratory audits, if used to perform environmental program functions) 2. Environmental TLD processing facility
: [[contact::C. Copies of audits]], self-assessments, vendor or NUPIC audits of contractor support, and
LERs written since the date of the last inspection, related to:
1. Radiological environmental monitoring program (including contractor environmental
laboratory audits, if used to perform environmental program functions)
2. Environmental TLD processing facility
3. Meteorological monitoring program
3. Meteorological monitoring program
D. Procedure index for the following areas
D. Procedure index for the following areas and other related disciplines.
and other related disciplines.
1. Radiological environmental monitoring program
1. Radiological environmental monitoring program
2. Meteorological monitoring program
2. Meteorological monitoring program
3. Maintenance and calibration of related instrumentation, including the meteorological tower
3. Maintenance and calibration of related instrumentation, including the meteorological
E. Please provide specific procedures related to the following areas
tower
noted below. Additional
E. Please provide specific procedures related to the following areas noted below.
procedures may be requested by number
Additional procedures may be requested by number after the inspector reviews the
after the inspector reviews the procedure indexes. 1. Sampling, collection and preparation of environmental samples
procedure indexes.
2. Sample analysis (if performed onsite) 3. Laboratory instrumentation quality control
1. Sampling, collection and preparation of environmental samples
2. Sample analysis (if performed onsite)
3. Laboratory instrumentation quality control
4. Meteorological Tower sensor calibrations
4. Meteorological Tower sensor calibrations
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
G. Please provide a
committed to relative to this program. Please include the revision and/or date for the
summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of the last inspection , related to the following programs: 1. Radiological environmental monitoring
commitment and where this may be located in your current licensing basis documents.
(include TLDs and air sample pumps or their infrastructure)
G. Please provide a summary list of corrective action documents (including corporate and
2. Meteorological monitoring
sub-tiered systems) written since the date of the last inspection, related to the following
(include Met Tower sensors and support equipment)
programs:
These lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the
1. Radiological environmental monitoring (include TLDs and air sample pumps or their
significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.) and the search criteria used. Please provide in document formats which are "sortable" and "searchable" so that inspectors can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
infrastructure)
H. Copies of the two
2. Meteorological monitoring (include Met Tower sensors and support equipment)
most recent calibration packages for the meteorological tower instruments
These lists should include a description of the condition that provides sufficient
I. Copies of the Annual Radiological Environmental Operating Report
detail that the inspectors can ascertain the regulatory impact, the significance
s and Land Use Census for the latest two calendar years, and current revision of the Offsite Dose Calculation Manual. Please include any supportive
level assigned to the condition, the status of the action (e.g., open, working,
documentation for the changes made to the ODCM since the last inspection.
closed, etc.) and the search criteria used. Please provide in document formats
J. Copy of the environmental laboratory
which are sortable and searchable so that inspectors can quickly and
's inter-laboratory comparison program results for the latest two calendar years
efficiently determine appropriate sampling and perform word searches, as
, if not included in the Annual Radiological Environmental Operating Report K. Data from the environmental laboratory documenting the analytical detection sensitivities for the various environmental sample media (i
needed. (Excel spreadsheets are the preferred format.) If codes are used,
.e., air, water, soil, vegetation, and milk)
please provide a legend for each column where a code is used.
L. Quality Assurance audits (e.g.
H. Copies of the two most recent calibration packages for the meteorological tower
, NUPIC) for contracted
instruments
services
I. Copies of the Annual Radiological Environmental Operating Reports and Land Use
: [[contact::M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most recent monitoring results for each monitoring well per the GPI. Provide a separate list of any missed samples]], as applicable.
Census for the latest two calendar years, and current revision of the Offsite Dose
 
Calculation Manual. Please include any supportive documentation for the changes
N. Technical requirements manual or licensee controlled specifications which list the meteorological instruments
made to the ODCM since the last inspection.
' calibration requirements
J. Copy of the environmental laboratorys inter-laboratory comparison program results for
: [[contact::O. If applicable]], per NEI 07
the latest two calendar years, if not included in the Annual Radiological Environmental
-07, provide any reports that document any spills/leaks to groundwater since the date of the last inspection. Please indicate what external communications were made regarding each spill/leak.
Operating Report
P. Provide any new entries into 10 CFR 50.75(g) files since
K. Data from the environmental laboratory documenting the analytical detection sensitivities
the date of the last inspection.
for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)
: [[contact::Q. Please identify your three highest X/Q (chi/Q) and/or D/Q sectors]], as currently used in the selection of your required REMP sampling locations. If these are different values from your most recent meteorological assessment, please provide that assessment and indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also indicate your noted predominant
: [[contact::L. Quality Assurance audits (e.g.]], NUPIC) for contracted services
and least prevalent
M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most
wind direction/sector, as used in your REMP analysis.
recent monitoring results for each monitoring well per the GPI. Provide a separate list of
R. Provide the height of the highest effluent release point. Please indicate if the height accounts for plant grade elevation. Please also provide the most probable
any missed samples, as applicable.
atmospheric release height, if different
N. Technical requirements manual or licensee controlled specifications which list the
from the highest effluent release point.
meteorological instruments calibration requirements
: [[contact::S. Please provide a schedule of any planned REMP sampling activities while we]], the NRC, are scheduled to be onsite performing this inspection.
: [[contact::O. If applicable]], per NEI 07-07, provide any reports that document any spills/leaks to
8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage, and Transportation (71124.08)
groundwater since the date of the last inspection. Please indicate what external
Date of Last Inspection:
communications were made regarding each spill/leak.
February 27, 2017
P. Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.
: [[contact::A. List of contacts and telephone numbers for the following areas. Please include area code and prefix. If work cell numbers are appropriate]], then please include them as well.
: [[contact::Q. Please identify your three highest X/Q (chi/Q) and/or D/Q sectors]], as currently used in
1. Solid Radioactive waste processing
the selection of your required REMP sampling locations. If these are different values
(RP, Chemistry, Ops, Maintenance, I&C, Engineering, etc.)
from your most recent meteorological assessment, please provide that assessment and
2. Transportation of radioactive material/waste
indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also
(RP, Maintenance, Ops, Security, Chemistry, etc.)
indicate your noted predominant and least prevalent wind direction/sector, as used in
3. personnel involved in solid radwaste processing, transferring, and transportation of radioactive waste/materials)
your REMP analysis.
R. Provide the height of the highest effluent release point. Please indicate if the height
accounts for plant grade elevation. Please also provide the most probable atmospheric
release height, if different from the highest effluent release point.
: [[contact::S. Please provide a schedule of any planned REMP sampling activities while we]], the NRC,
are scheduled to be onsite performing this inspection.
8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,
and Transportation (71124.08)
Date of Last Inspection:       February 27, 2017
A. List of contacts and telephone numbers for the following areas. Please include area
code and prefix. If work cell numbers are appropriate, then please include them as well.
1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,
Engineering, etc.)
2. Transportation of radioactive material/waste (RP, Maintenance, Ops, Security,
Chemistry, etc.)
3. personnel involved in solid radwaste processing, transferring, and transportation of
radioactive waste/materials)
4. Licensing/Regulatory Affairs
4. Licensing/Regulatory Affairs
: [[contact::B. Applicable organization charts including position or job titles. Please include as appropriate for your site]], Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency Protection. (Recent pictures are appreciated.)
B. Applicable organization charts including position or job titles. Please include as
: [[contact::C. Copies of audits]], department self
appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
-assessments, and LERs written since the date of the last inspection, related to:
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
: [[contact::C. Copies of audits]], department self-assessments, and LERs written since the date of the
last inspection, related to:
1. Solid radioactive waste management
1. Solid radioactive waste management
2. Radioactive material/waste transportation program
2. Radioactive material/waste transportation program
D. Procedure index for the following areas
D. Procedure index for the following areas and other related disciplines.
and other related disciplines.
1. Solid radioactive waste management
1. Solid radioactive waste management
2. Radioactive material/waste transportation
2. Radioactive material/waste transportation
E. Please provide specific procedures related to the following areas
E. Please provide specific procedures related to the following areas noted below.
noted below. Additional
Additional procedures may be requested by number after the inspector reviews the
procedures may be requested by number
procedure indexes.
after the inspector reviews the procedure indexes.
1. Process control program and any changes made since the last inspection
1. Process control program
and any changes made since the last inspection
2. Solid and liquid radioactive waste processing
2. Solid and liquid radioactive waste processing
3. Waste stream sampling and analysis
3. Waste stream sampling and analysis
4. Waste characterization and classification
4. Waste characterization and classification
5. Radioactive material/waste packaging & shipping   F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
5. Radioactive material/waste packaging & shipping
G. Please provide a
F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently
summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of the last inspection, related to:
committed to relative to this program. Please include the revision and/or date for the
commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and
sub-tiered systems) written since the date of the last inspection, related to:
1. Solid radioactive waste
1. Solid radioactive waste
2. Transportation of radioactive material/waste
2. Transportation of radioactive material/waste
NOTE: These lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level
NOTE: These lists should include a description of the condition that provides
assigned to the condition, the status of the action (e.g., open, working, closed, etc.) and the search criteria used. Please provide in document formats which are "sortable" and "searchable" so that inspectors can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
sufficient detail that the inspectors can ascertain the regulatory impact, the
H. Copies of training lesson plans for 49
significance level assigned to the condition, the status of the action (e.g., open,
CFR 172 , Subpart H, for radwaste processing, packaging, and shipping
working, closed, etc.) and the search criteria used. Please provide in document
: [[contact::I. Provide a summary list or log of radioactive material and radioactive waste shipments for the two most recent calendar years]], in addition to the current calendar year.
formats which are sortable and searchable so that inspectors can quickly and
J. Please provide at least two different radioactive waste stream sample analys
efficiently determine appropriate sampling and perform word searches, as
is results and resulting scaling factors for the latest two calendar years.
needed. (Excel spreadsheets are the preferred format.) If codes are used,
K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the items stored in each facility
please provide a legend for each column where a code is used.
with the most recent dose rates/surveys.
: [[contact::H. Copies of training lesson plans for 49 CFR 172]], Subpart H, for radwaste processing,
: [[contact::L. A list of any significant (e.g.]], DAW, resins, Type B or greater) radioactive shipments that will be completed during our onsite inspection period. If available, please provide the applicable shipping manifests/waste characterizations and most recent surveys for each shipment. M. A list of significant changes made to the liquid or solid radwaste processing systems
packaging, and shipping
since the date of the last inspection
I. Provide a summary list or log of radioactive material and radioactive waste shipments for
. If applicable, please provide the corresponding UFSAR section in which this change was documented.
the two most recent calendar years, in addition to the current calendar year.
Provide any supportive documentation for the changes made or have it
J. Please provide at least two different radioactive waste stream sample analysis results
readily available for review.
and resulting scaling factors for the latest two calendar years.
 
K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the
N. List of radioactive waste processing systems or equipment abandoned in place since the last inspection.
items stored in each facility with the most recent dose rates/surveys.
O. Please provide a schedule of radioactive material or waste processing or shipment activities during the inspection
: [[contact::L. A list of any significant (e.g.]], DAW, resins, Type B or greater) radioactive shipments that
week. Please indicate the current storage location of the stored RAM or waste prepared for shipment, as well as any supportive surveys of its measured dose rates. If available, please indicate its current stated waste class.
will be completed during our onsite inspection period. If available, please provide the
applicable shipping manifests/waste characterizations and most recent surveys for each
shipment.
M. A list of significant changes made to the liquid or solid radwaste processing systems
since the date of the last inspection. If applicable, please provide the corresponding
UFSAR section in which this change was documented. Provide any supportive
documentation for the changes made or have it readily available for review.
N. List of radioactive waste processing systems or equipment abandoned in place since the
last inspection.
O. Please provide a schedule of radioactive material or waste processing or shipment
activities during the inspection week. Please indicate the current storage location of the
stored RAM or waste prepared for shipment, as well as any supportive surveys of its
measured dose rates. If available, please indicate its current stated waste class.
A3-10
}}
}}

Latest revision as of 10:37, 18 December 2019

Integrated Inspection Report 05000483/2019002
ML19221B450
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/09/2019
From: O'Keefe N
NRC/RGN-IV/DNMS/NMSB-B
To: Diya F
Ameren Missouri
References
IR 2019002
Download: ML19221B450 (51)


Text

ust 9, 2019

SUBJECT:

CALLAWAY UNIT 1 - INTEGRATED INSPECTION REPORT 05000483/2019002

Dear Mr. Diya:

On June 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Callaway Plant. On July 2, 2019, the NRC inspectors discussed the results of this inspection with Mr. T. Herrmann, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil F. O'Keefe, Chief Reactor Projects Branch B Docket No.: 05000483 License No.: NPF-30

Enclosure:

Inspection Report 05000483/2019002 With Attachments:

Documents Reviewed Request for Information O

Inspection Report

Docket Number: 05000483 License Number: NPF-30 Report Number: 05000483/2019002 Enterprise Identifier: I-2019-002-0006 Licensee: Union Electric Company Facility: Callaway Plant Location: Steedman, MO 65077 Inspection Dates: April 1 to June 30, 2019 Inspectors: C. Alldredge, Senior Enforcement Specialist B. Baca, Health Physicist D. Bradley, Senior Resident Inspector R. Carrion, Senior Reactor Inspector P. Elkmann, Senior Emergency Preparedness Inspector N. Greene, Senior Health Physicist S. Janicki, Resident Inspector J. O'Donnell, Health Physicist B. Tharakan, Senior Project Engineer D. You, Resident Inspector Approved By: Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at the Callaway Plant in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

PLANT STATUS

Callaway began the inspection period at approximately 20 percent power with a planned shutdown in progress for the refueling outage. On April 1, 2019, the licensee shut down the reactor and commenced the planned refueling outage. On April 17, with the reactor defueled and in no Mode, safety-related bus NB01 lost power and was automatically reenergized by the associated emergency diesel generator due to a loss of the 365 kV switchyard bus (NRC Event 54005). On May 11, with the reactor in Mode 4, the licensee identified an auxiliary building door that had been blocked open through reactor Mode ascension (NRC Event 54061).

On May 16, the licensee commenced a reactor startup. Later that day, an automatic reactor trip occurred due to high flux in the source range (NRC Event 54069) when operators failed to block this trip when conditions called for them to do so. On May 17, the licensee commenced a reactor startup. On May 18, the licensee tripped the main turbine due to high vibrations and the reactor remained critical, by design, due to the low power level at the time of the turbine trip.

The licensee restored the main turbine to service and connected the main generator to the electric grid on May 19. The licensee reached full power on May 22 and remained at this power level through the end of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection Summer Readiness Sample (IP Section 03.01)

The inspectors evaluated summer readiness of offsite and alternate alternating current (AC)power systems on June 5, 2019. The inspectors also reviewed the prioritization of efforts to restore offsite power to support Callaway, including a tour of the Ameren Transmission facility in St. Louis, for a design basis loss of offsite power event.

71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Essential service water trains A and B on April 22, 2019
(2) Emergency diesel generator train A on April 28, 2019
(3) Residual heat removal system train B on May 8, 2019
(4) Main turbine and electro-hydraulic control systems on June 4, 2019

71111.05Q - Fire Protection Quarterly Inspection (IP Section 03.01)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Switchyard including switchyard control building, fire area S-15 on April 22, 2019
(2) Spent fuel pool, bridge, and laydown area, fire area FB-1 on May 10, 2019
(3) Control building 2016' elevation, fire areas C-13, C-15, C-17, and C-35 on May 29, 2019
(4) Spent fuel pool heat exchanger rooms and cask wash down area, fire area FB-1 on June 4, 2019
(5) Emergency diesel generator train A and essential switchgear train B, fire areas D-1 and C-10 on June 20, 2019

71111.06 - Flood Protection Measures Inspection Activities - Internal Flooding (IP Section 02.02a.)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Control building 1974' elevation, room 3101, on May 8, 2019

71111.07A - Heat Sink Performance Annual Review (IP Section 02.01)

The inspectors evaluated readiness and performance of:

(1) Component cooling water heat exchanger EEG01A on April 4, 2019

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 8 through April 12, 2019:

03.01.a - Nondestructive Examination and Welding Activities

(1) NDE activity type: Magnetic Particle Testing (MT)a) Pipe to flange weld (FW-01), Job #17002729, Task 180, Report 5010-19-0001, ASME Class 3 b) Pipe to crossover tee weld (FW-17), Job # 17002729, Task 500, Report 5010-19-0008, ASME Class 3 c) Pipe to elbow weld (FW-21), Job # 17002729, Task 500, Report 5010-19-0009, ASME Class 3 d) Pipe to crossover tee weld (FW-10), Job # 17002729, Task 500, Report 5010-19-0012, ASME Class 3
(2) NDE activity type: Ultrasonic Testing (UT)a) RPV replacement stud 2, Report 19-000245, ASME Class1
(3) NDE activity type: Visual Testing (VT)a) Fuel transfer system tube and flange, Job #17512708, Task 510, Report 5040-19-002, ASME Class IWE (VT-1)03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities
(1) Penetration numbers 1 through 78, Job #13503632; no indications identified 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities
(1) Condition Report 201800861-002, boric acid screen and evaluation
(2) Condition Report 201801218-001, boric acid screen and evaluation
(3) Condition Report 201801218-002, boric acid screen and evaluation 03.01.d - No steam generator tube inspections were performed this inspection period 03.01.e - The inspectors reviewed 10 condition reports associated with inservice inspection related topics and determined that the licensee was entering issues into the corrective action program and taking appropriate actions to resolve

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)

The inspectors observed and evaluated licensed operator performance in the control room during:

(1) Reduced reactor coolant system inventory, including infrequently performed test or evolution (IPTE) briefs, on May 5, 2019
(2) Vacuum fill of the reactor coolant system on May 6, 2019 Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

The inspectors observed and evaluated licensed operator training in the simulator for:

(1) Reactor start-up on May 6, 2019

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness Inspection (IP Section 02.01)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Essential service water including butterfly valves on April 8, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) Residual heat removal train A including hand-switches on June 21, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Planned elevated risk during polar crane maintenance and operation on April 4, 2019
(2) Planned elevated risk for the train A work window on April 8, 2019
(3) Planned elevated risk during switchyard maintenance on April 2, 2019
(4) Planned elevated risk for reactor power ascension and recovery of a digital turbine hydraulics controller on May 20, 2019

71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 02.02)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Dropped control rod H-8, Condition Report 201901077, on April 12, 2019
(2) Turbine-driven auxiliary feedwater pump internal inspection results, Condition Report 201902635, on April 17, 2019
(3) Reactor coolant motor-operated valve BBHV0016 stem nut wear, Condition Report 201902462, on April 18, 2019
(4) Switchyard breaker MDV45 failure to close, Condition Report 201902658, on April 18, 2019
(5) Essential service water failure analysis for valves EFHV0065 and EFHV0066, Condition Report 201806521, on May 9, 2019
(6) Control room air conditioning unit SGK04A degraded cooling capacity, Condition Report 201904050, on May 31, 2019

71111.18 - Plant Modifications Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)

The inspectors evaluated the following permanent modification:

(1) Main turbine generator governor controls, MP 08-0027, on April 4, 2019

71111.19 - Post-Maintenance Testing Post Maintenance Test Sample (IP Section 03.01)

The inspectors evaluated the following post maintenance tests:

(1) Polar crane and load cell after equipment outage on April 6, 2019
(2) Ultimate heat sink cooling tower fans train B after equipment outage on April 12, 2019
(3) Essential service water modification MP 17-0006 on April 16, 2019
(4) 36 kV circuit breaker MDV55 after modification on April 22, 2019
(5) Main feedwater regulating valves AEFCV0510 and AEFCV0530 after equipment outage on May 5, 2019
(6) 125 Vdc battery NK11 after replacement on May 13, 2019
(7) Load shedding and emergency load sequencing train A after equipment outage on May 19, 2019

71111.20 - Refueling and Other Outage Activities Refueling/Other Outage Sample (IP Section 03.01)

(1) The inspectors evaluated refueling outage RF23 from April 1 through May 22, 2019

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Inservice Testing (IP Section 03.01)

(1) Pressurizer power operated relief valve inservice test in Mode 4 on April 3, 2019
(2) Component cooling water cross tie valves inservice testing on June 2, 2019 Reactor Coolant System (RCS) Leakage Detection Testing (IP Section 03.01) (1 Sample)
(1) RCS water inventory balance surveillance post-reactor startup from Refueling Outage RF23 on June 19, 2019

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Engineered safety features actuation systems train A on April 5, 2019
(2) Class 1E electrical equipment air conditioning system actuation and flow test on date May 11, 2019
(3) Turbine-driven auxiliary feedwater pump test in Mode 3 on May 15, 2019

71114.04 - Emergency Action Level and Emergency Plan Changes Inspection Review (IP Section 02.01-02.03)

(1) The inspectors evaluated Procedure EIP-ZZ-00101, Addendum 2, "Emergency Action Level Technical Basis Document," Revision 16, on May 1, 2019 This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)

(1) Team 4 full participation emergency response organization drill on June 6,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls Contamination and Radioactive Material Control (IP Section 02.03)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material. The inspectors verified the following sealed sources are accounted for and are intact:

(1) 0029GZ
(2) 3217GN
(3)81-616
(4) 0819GG/4660
(5) E-083/S-13
(6) CNP-148
(7) MRC-4108 High Radiation Area and Very High Radiation Area Controls (IP Section 02.05) (1 Sample)

The inspectors evaluated risk-significant high radiation area and very high radiation area controls.

Instructions to Workers (IP Section 02.02) (1 Sample)

The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas:

Radiation work packages

(1) R23HDDESTUD, Revision 0 - install stud tensioner hoists, deten0sion reactor vessel studs, remove reactor vessel studs, clean stud holes, lubricate stud holes, install stud hole plugs, and install guides studs/pins
(2) R23HDSTUD18, Revision 0 - Refuel 23 activities to remove reactor vessel stuck stud 18, including thread repairs, and inspect its stud hole; includes cutting, boring, QC/Engineering inspections, and associated cavity work (except cavity decontamination)
(3) R23STD18DECON, Revision 0 - RF23 upper cavity gross rinse, vacuum of seal ring, upper cavity decontamination, and reactor vessel flange cleaning to support removal of stuck reactor vessel stud 18, includes all Radiation Protection coverage and surveys
(4) R23ENGHRA, Revision 0 - R23 engineering activities inside high radiation areas in all radiologically controlled areas including the reactor building
(5) 16003707510, Revision 0 - RT new nipolet to valve weld on Valve EMV0161 Electronic alarming dosimeter alarms
(1) The licensee did not have an occurrence of a dosimeter alarm during the inspection period. The inspectors reviewed corrective action documents, radiation work permits and ALARA plans, as well as, interviewed workers to ensure the licensee was evaluating and controlling occupational worker exposures appropriately.

Labeling of containers

(1) Framatome core offloading/reloading and stuck stud removal equipment boxes
(2) Westinghouse fuel assembly inspection equipment boxes
(3) Pipefitters equipment boxes for the radiologically controlled area use
(4) Radioactive material (radioactive source) storage containers
(5) Radioactive material trash bags in the reactor containment building and auxiliary building Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 02.06) (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician proficiency.

Radiological Hazard Assessment (IP Section 02.01) (1 Sample)

The inspectors evaluated radiological hazards assessments and controls. The inspectors reviewed the following:

Radiological surveys

(1) General containment
(2) Reactor cavity
(3) Reactor head
(4) Inside bioshield
(5) Incore tunnel Risk significant radiological work activities
(1) Reactor head lift
(2) Refuel activities
(3) Reactor head stud replacement - stuck stud 2 and 18
(4) Cavity decontamination
(5) Radiography Air sample survey records
(1) Reactor containment building entries: 29-MAR-19-200005,7,8; and 31-Mar-19-200004, 5, 8
(2) Reactor containment building outage dailies: 08-APR-19-200008,9,10; 09-APR-19-200012,13,14; and 10-APR-19-200004,5,6
(3) Reactor cavity: 08-APR-19-200023, 24; 08-APR-19-200025, 26; 09-APR-19-200003,5; 09-APR-19-200006,8; and 10-APR-19-200023, 24
(4) Reactor head stand O-ring cutout: 10-APR-19-200007,18
(5) Breach of Valve BGHV8149B: 10-APR-19-200029, 34 Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Sample)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

Radiological work package for areas with airborne radioactivity

(1) There were no radiation work permits with airborne radioactivity available for review during this inspection. The inspectors reviewed radiation work permits with the highest potential for airborne radioactivity and the results for air samples taken during the inspection period.

71124.02 - Occupational ALARA Planning and Controls Implementation of ALARA and Radiological Work Controls (IP Section 02.03)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the following activities:

(1) RWP 16003707510, EMV0161 radiography
(2) RWP R23HDSTUD18, remove stuck stud 18
(3) RWP R23STD18DECON, RF23 Cavity Decontamination

Radiation Worker Performance (IP Section 02.04) (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance during general work in containment, decontamination of the vessel flange in preparation for the removal of stuck stud 2, and during the radiography of EMV0161 in the auxiliary building.

71124.05 - Radiation Monitoring Instrumentation Calibration and Testing Program (IP Section 02.02)

The inspectors evaluated the calibration and testing program implementation. The inspectors reviewed the following:

Alarm Setpoint and Calibration Method Check of Personnel Contamination Monitors, Portal Monitors and Small Article Monitors

(1) TM-4010-HP
(2) PM-4046-HP Failure to Meet Calibration or Source Check Acceptance Criteria
(1) CRM-4190-HP

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns. The inspectors reviewed the following:

Portable Survey Instruments

(1) CRM-4025-HP
(2) CRM-4087-HP
(3) CRM-4134-HP
(4) CRM-4023-HP
(5) CRM-4089-HP
(6) ION-4174-HP
(7) GMI-4178-HP Source Check Demonstration
(1) ION-4172-HP
(2) CRM-4115-HP
(3) GMI-4178-HP Area Radiation Monitors and Continuous Air Monitors
(1) 0-EG-RE-09
(2) 0-GT-RE-33
(3) 0-SD-RE-24
(4) 0-SD-RE-38
(5) CAM-4019-HP
(6) CAM-4020-HP Personnel Contamination Monitors, Portal Monitors and Small Article Monitors
(1) TM-4010-HP
(2) PCM-4054-HP
(3) PM-4046-HP

==71124.06 - Radioactive Gaseous and Liquid Effluent Treatment Calibration and Testing Program (Process & Effluent Monitors) (IP Section 02.02) (1 Sample)

The inspectors reviewed the following gaseous and liquid effluent monitor instrument calibrations and tests:

(1) GH-RE-10 radwaste building unit vent functional test, June 13, 2019
(2) GT-RE-21A plant unit vent calibration, January 29, 2019
(3) GT-RE-21B plant unit vent calibration, August 23, 2018
(4) HB-RE-18 liquid radwaste discharge monitor calibration, August 21, 2018 Dose Calculations (IP Section 02.05)==

The inspectors reviewed the following liquid and gaseous discharge permits to evaluate public dose calculations:

(1) Batch liquid radioactive release permit numbers:
  • RP09-2019-L0037;0
  • RP09-2018-L0007;1
  • RP09-2017-L0028;1
(2) Batch airborne radioactive release permits:
  • RP11A-2019-G0013;1
  • RP13-2018-G0002;56
(1) 2017 Annual Radiological Effluent Release Report
(2) 2018 Annual Radiological Effluent Release Report The inspectors also reviewed the following abnormal gaseous or liquid tank discharges:
(1) None were available for review during this inspection

Instrumentation and Equipment (IP Section 02.04) (1 Sample)

The inspectors reviewed the following radioactive effluent discharge system surveillance test results:

(1) Auxiliary/fuel building emergency exhaust filter adsorber Unit B, in-place leak test
(2) Control room pressurization filter adsorber Unit B, in-place leak test
(3) Control room filter adsorber Unit A, in-place leak test

Sampling and Analysis (IP Section 02.03) (1 Sample)

The inspectors reviewed the following radioactive effluent sampling and analysis activities:

(1) None were available for review during this inspection The inspectors reviewed the following effluent discharge:
(1) June 11, 2019, discharge monitor tank A discharge

Walk Downs and Observations (IP Section 02.01) (1 Sample)

The inspectors walked down the following gaseous and liquid radioactive effluent monitoring and filtered ventilation systems to assess the material condition and verify proper alignment according to plant design:

(1) Liquid radwaste treatment system
(2) Gaseous radwaste treatment system

71124.07 - Radiological Environmental Monitoring Program Groundwater Protection Initiative (GPI) Implementation (IP Section 02.02)

The inspectors evaluated the licensee's voluntary groundwater protection initiative through review of licensee documented leaks and spills since the last inspection, groundwater sampling results, and any changes to the licensee's groundwater sampling, ground water protection initiative, and spill and leak program and procedures. The inspectors reviewed and observed selected onsite groundwater locations as delineated in the licensee's program to ensure timely identification of inadvertent releases into the groundwater. The licensee had no entries of spills or leaks into their 10 CFR 50.75(g) records since the last inspection.

The licensee is continuing to monitor tritium through monitoring wells MW-31, MW-34, MW-36, MW-39, MW-47, MW-58, and MW-59. In 2017, the licensee identified a peak concentration in monitoring well MW-31 of 1,688 picoCuries per liter (pCi/l) in January which decreased by the end of the year to 278 pCi/l. In 2018, monitoring well MW-58 peaked at 911 pCi/l in January and decreased to 516 pCi/l by October. The licensee reported their sampling results in each respective annual radiological environmental operating report. The licensee is continuing to monitor the tritium levels and the continued decrease through natural attenuation.

Site Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the radiological environmental monitoring program implementation:

Walkdowns, Calibrations, and Maintenance Record Review

(1) Air sampling stations: A1, A7, A8, A9, A10, and A11
(2) Thermoluminescent dosimeter (TLD) locations: 03, 05, 06, 21, 22a, 44, 45, 46, 47, and 61
(3) Air sampler pump calibrations: LAS-4179, LAS-4182, and LAS-4201
(4) Meteorological tower instrument calibrations Environmental Sample Collections and Preparation Observation
(1) Vegetation samples from three sample locations: V9, V11, and V16
(2) Surface water grab samples from S01 and S02 locations Licensee Actions in Response to Missed Sample, Inoperable Sampler, Lost TLD or Anomalous Measurement
(1) Licensee instituted compensatory sampling for selected surface water sampling locations (S01 and S02) due to flooding conditions
(2) Licensee replaced older air sampling pumps with new F&J pumps
(3) Licensee converted air sample stations from a straight line sample port to an overhanging goose neck configuration
(4) Missed environmental samples were evaluated for nominal equipment failures, aged equipment issues, power source issues, and sample reliability. The licensee made repairs, replaced equipment, and adjusted sampling locations to fulfill the environmental sampling program requirements. All missed and anomalous results were reported in the annual radiological environmental operating report.

Sampling Program for the Potential of Licensed Material Entering Groundwater

(1) The inspectors reviewed data from and observed the following sampled groundwater wells: U1MW-31, U1MW-937D, U1MW-939R, U1MW-940, U1MW-941, and U1MW-GW

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Radioactive Material Storage (IP Section 02.01)

The inspectors evaluated radioactive material storage in the follow areas:

(1) Low Level Drum Storage Area (55-gallon drums)
(2) Radwaste north yard
(3) Radwaste south yard The inspectors performed a container check (e.g., swelling, leakage and deformation) on the following containers:
(1) 9563, sludge oil solidified waste
(2) 9673, solidified waste
(3) 9677, solidified waste
(4) 9687, solidified waste
(5) 9709, SLW sludge solidified waste
(6) 9710, oily waste
(7) 16145, SGBD resin Radioactive Waste System Walkdown (IP Section 02.02) (1 Sample)

The inspectors evaluated the following radioactive waste processing systems [and processes] during plant walkdowns:

Liquid or Solid Radioactive Waste Processing Systems

(1) Self-engaging dewatering system Radioactive Waste Resin and/or Sludge Discharges Processes
(1) Resin handling system for spent resin and charcoal

Shipment Preparation (IP Section 02.04) (1 Sample)

The inspectors evaluated [and observed] the following radioactive material shipment preparation processes:

(1)19-021, UN2912, radioactive material, LSA-I, Class 7, resin, June 11, 2019

Shipping Records (IP Section 02.05) (1 Sample)

The inspectors evaluated the following non-excepted package shipment records:

(1)17-010, UN3321, radioactive material, LSA-II, Class 7, drummed mechanical filters, June 22, 2017
(2)17-012, UN3321, radioactive material, LSA-II, Class 7, dewatered resin, July 12, 2017
(3)17-061, UN2912, radioactive material, LSA-I, Class 7, dry active waste CYC 21, November 17, 2017
(4)18-001, UN3321, radioactive material, LSA-II, Class 7, dewatered resin and charcoal, January 12, 2018
(5)18-010, UN2911, radioactive material, Excepted Package, Class 7, instruments, April 12, 2018
(6)18-018, UN2911, radioactive material, Excepted Package, Class 7, instruments, September 20, 2018
(7)18-036, UN2912, radioactive material, LSA-I, Class 7, dry active waste, December 26, 2018
(8)19-005, UN3321, radioactive material, LSA-II, Class 7, resin and charcoal, March 19, 2019 Waste Characterization and Classification (IP Section 02.03) (1 Sample)

The inspectors evaluated the radioactive waste characterization and classification for the following waste streams:

(1) 14Aug17-200011GEL, FBG02A BTRS Resin 2017, August 1, 2017
(2) 17Aug17-200011FBGD, FBG02D BTRS Resin, August 17, 2017
(3) 09MAR200018 DAW1, DAW CYCLE 22, March 8, 2018
(4) 18APR18-200020 PV3/6, ALPS PV3/PV6 Resin, April 18, 2018
(5) 07May18-200011(PV1), ALPS PV-1 Charcoal 2019, May 1, 2018
(6) 16AUG18-200010(PV3), ALPS PV-3 Resin, August 15, 2018
(7) 18Jan19-200021(PV2), ALPS PV-2 Charcoal 2019, January 15,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

BI02: RCS Leak Rate Sample (IP Section 02.11) ===

(1) April 1, 2018 through March 31, 2019 MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (1 Sample)
(1) April 1, 2018 through March 31, 2019

MS08: Heat Removal Systems (IP Section 02.07) (1 Sample)

(1) April 1, 2018 through March 31, 2019 OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
(1) October 1, 2018, through March 31, 2019 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences

Sample. (IP Section 02.16) (1 Sample)

(1) October 1, 2018, through March 31, 2019

71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues (IP Section 02.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Instrument air pressure control valves on June 22, 2019

Semiannual Trend Review (IP Section 02.02) (1 Sample)

The inspectors reviewed the licensees corrective action program for potential adverse trends in troubleshooting equipment issues when the cause of a deficiency is not immediately clear and for a trend in safety-related door issues on June 3, 2019.

71153 - Followup of Events and Notices of Enforcement Discretion Event Followup (IP Section 03.01)

(1) The inspectors evaluated essential service water valve EHV0066 valve coupling failure and the licensees response on April 12, 2019

Personnel Performance (IP Section 03.03) (2 Samples)

(1) The inspectors evaluated an automatic reactor trip and the licensees performance on May 17, 2019
(2) The inspectors evaluated a manual turbine trip and the licensees performance on May 18,

INSPECTION RESULTS

Observation: Semi-Annual Trend Review 71152 The inspectors reviewed the licensees corrective action program, performance indicators, system health reports, and other documentation to identify trends that might indicate the existence of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear and for a trend in safety-related door issues.

The following troubleshooting examples were reviewed by the inspectors for 2019 where the licensee was unable to positively identify the cause or correct the apparent condition:

  • Condition Report 201900105: The P-9 bistable light was found unexpectedly not lit during a routine control room walkdown. The licensee decided to make an unplanned entry into the reactor trip instrumentation technical specification based on the indication. The licensee determined there were no activities in progress that affected the indication, verified that that the P-9 bistable was in the correct state, and a lamp test confirmed the light bulb was functioning. The P-9 bistable light then spontaneously relit and the licensee exited Technical Specification 3.3.1. The licensee concluded that that the observed condition appeared to be an indication problem only but was unable to find a clear cause. The licensee later inspected and re-lamped indicator lights for this issue.
  • Condition Report 201901077: Control rod H-8 dropped while operating control rod bank D. Extensive troubleshooting by the licensee could not determine a conclusive reason for the control rod drop. After performing an undetermined cause risk assessment per Procedure MDP-ZZ-TR001, Planning and Execution of Formal Troubleshooting Activities, the licensee recovered the rod. The licensee discussed the condition with the vendor, reviewed industry operating experience, and later performed inspections of the control rod drive mechanism during the refueling outage.

After eliminating other possible causes, the licensee concluded that the probable cause was crud in the latching mechanism.

The licensee conducted an inspection of the valve's internals which did not identify an obvious cause for the increased torque required to operate the check valve. The licensee later concluded the valve packing was the cause of the increased resistance.

The licensee returned the check valve to service following an adjustment of the valve packing and a successful performance of the torque check. Although a clear cause was not identified, the licensee took steps to eliminate other possible causes and took corrective action to improve operating torque.

The inspectors noted that the for these three examples, the licensee conservatively declared the equipment inoperable and initiated timely actions to identify the cause of the condition.

When the condition self-cleared or the cause could not be positively identified, the licensee ensured that they ruled out the known possible causes and took appropriate corrective actions to try to address the problem. The inspectors verified that all issues were addressed within the scope of the corrective action program and that the completed and planned corrective actions were appropriate to correct the identified causes. The inspectors did not identify any trends or concerns that might be indicative of a more significant safety issue for troubleshooting equipment issues when the cause of a deficiency is not immediately clear.

The inspectors also reviewed an apparent trend in problems with doors that were important to safety. After the NRC identified Green non-cited violation 05000483/2018002-02 (ADAMS ML18221A398), an auxiliary building door that was blocked open during Mode ascension (NRC Event 54061), and damaged door seals identified by the NRC which were documented in Condition Report 201903536, the licensee wrote Condition Report 201904398 to evaluate 34 condition reports generated in 2019 for an adverse trend in door issues. The licensee recognized gaps in their staffs understanding of functions performed by doors, identifying degraded conditions (including during use), and timely resolution of the issues identified. The inspectors noted that condition reports were being appropriately generated for individual deficiencies but that programmatic issues remain to be addressed. The inspectors noted that many of the condition reports are the result of a concerted effort to identify door issues at a low threshold. The inspectors concluded that the licensee appropriately identified this trend in safety-related door issues and was acting to address the causes.

Overall, the inspectors concluded that the licensee demonstrated a low threshold for issue identification and documentation in the corrective action program. The licensee applied a risk-based approach to ensure corrective actions are completed commensurate with an issues safety significance. The inspectors did not identify any additional trends or concerns that might be indicative of a more significant issue with safety-related doors.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 2, 2019, the inspectors presented the integrated inspection results to Mr. T. Herrmann, Site Vice President, and other members of the licensee staff.
  • On April 12, 2019, the inspectors presented the occupational radiation safety inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
  • On April 12, 2019, the inspectors presented the inservice inspection results to Mr. T. Herrmann, Site Vice President and other members of the licensee staff.
  • On June 14, 2019, the inspectors presented the public radiation safety inspection results to Mr. B. Cox, Assistant Site Vice President and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Corrective Condition Reports 201104350, 201900304, 201903907, 201903907

Action

Documents

71111.01 Miscellaneous ULDBD-GF-001 Miscellaneous Building HVAC 3

71111.01 Procedures EDP-ZZ-01129 Callaway Plant Risk Assessment 50

71111.01 Procedures ODP-ZZ-0016E Operations Technician Watchstation Practices and 45

Rounds

71111.01 Procedures PDP-ZZ-00027 Summer Readiness Program 8

71111.04 Corrective Condition Reports 201702402, 201806793, 201807138

Action

Documents

71111.04 Procedures OTN-EJ-00001 Residual Heat Removal System 28

71111.05Q Miscellaneous MP 16-0024 SGK05 Supplemental Fan System 8

71111.05Q Miscellaneous Various Fire Pre-plan Manual 40

71111.05Q Procedures APA-ZZ-00703 Fire Protection Operability Criteria and Surveillance 30

Requirements

71111.05Q Procedures APA-ZZ-00750 Hazard Barrier Program 44

71111.06 Miscellaneous PM0900506 Walkdown of the RWST FDN and Valve House

71111.06 Miscellaneous PM1009292 Clean Debris from UHS Cooling Tower Fan Deck

Drains

71111.06 Procedures ESP-ZZ-01013 Maintenance Rule Structures Inspection 8

71111.07A Corrective Condition Reports 201902062, 201902231, 201902396, 201902456,

Action 201902921

Documents

71111.07A Work Orders 16506165, 17513066

71111.08P Corrective Condition Reports 201800861, 201801218, 201804786, 201804794,

Action 201804816, 201901976

Documents

71111.08P Corrective Condition Reports 201902288

Action

Documents

Resulting from

Inspection Type Designation Description or Title Revision or

Procedure Date

Inspection

71111.08P Engineering Condition Reports 201800861-002, 201801218-001, 201801218-002

Evaluations

71111.08P Miscellaneous Callaway Nuclear Plant Containment Exterior 4

Concrete and Tendon Inspection Program

71111.08P Miscellaneous Callaway Nuclear Plant Containment Pressure 4

Boundary ISI Program, ASME Section XI, Subsection

IWE

71111.08P Miscellaneous Fourth Interval Inservice Inspection Program Plan, 0

Fourth Interval Inservice Inspection Program Plan

71111.08P Miscellaneous Fourth Interval Inservice Inspection Program Plan 1

71111.08P Miscellaneous Fourth Interval Inservice Inspection Program Plan 0

Appendix A, Code Cases and Requests for

Relief/Alternative Applied to the Fourth Interval

71111.08P Miscellaneous Fourth Interval Inservice Inspection Program Plan 1 - Draft

Appendix A, Code Cases and Requests for

Relief/Alternative Applied to the Fourth Interval

71111.08P Miscellaneous NDE Personnel Qualifications for D. Davis and W.

Thomas

71111.08P Miscellaneous Welding Personnel Qualifications for

A. Carroll,
M.

Collier,

R. Holliday,
A. Langkop,
D. Leeper,
J. Parker,
N. Rosenquist,
B. Thomas,
A. Weisacosky, and C.

Wood

71111.08P Miscellaneous Relief Request I4R- Relief from the Requirements of the ASME Code,

Section XI, Table IWF-2500-1 for 100 Percent Visual

Examination of Class 1 Supports

71111.08P Miscellaneous Relief Request I4R- Request for Alternative Applicable to the Fourth 10-

Year Inspection Program Interval

71111.08P Miscellaneous Specification C- Inservice Inspection of the Containment Post- 13

1003(Q) Tensioning System and Exterior Concrete Shell

71111.08P NDE Reports Job #13503632, RPV Head Bare Metal Examination Summary, ASME 04/13/19

Task 500 Code Class 1

71111.08P NDE Reports Report 5010-19- Pipe to flange weld (FW-01), Job # 17002729, Task

0001 180, ASME Class 3

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.08P NDE Reports Report 5010-19- Pipe to crossover tee weld (FW-17), Job # 17002729,

0008 Task 500, ASME Class 3

71111.08P NDE Reports Report 5010-19- Pipe to elbow weld (FW-21), Job # 17002729, Task

0009 500, ASME Class 3

71111.08P NDE Reports Report 5010-19- Pipe to crossover tee weld (FW-10), Job # 17002729,

0012 Task 500, ASME Class 3

71111.08P NDE Reports Report 5040-19- Fuel Transfer System Tube and Flange, Job #

2 17512708, Task 510, ASME Class IWE

71111.08P NDE Reports Report: 19-000245 Component: 2-CH-STUD-02-R2, Component 04/29/19

Description: RPV Stud #2 2nd Replacement, ASME

Code Class 1

71111.08P Procedures APA-ZZ-00661 Administration of Welding 16

71111.08P Procedures APA-ZZ-00662 ASME Section XI Repair/Replacement Program 23

71111.08P Procedures EDP-ZZ-01003 Inservice Inspection Program 31

71111.08P Procedures EDP-ZZ-01004 Boric Acid Corrosion Control Program 22

71111.08P Procedures ESP-ZZ-01012 Containment Post-Tensioning System Inspection 9

71111.08P Procedures ESP-ZZ-01016 ASME Section XI IWE Containment Pressure 8

Boundary Inspection

71111.08P Procedures LMT-08-PDI-UT-5 Straight Beam Ultrasonic Examination of Bolts and 0

Studs

71111.08P Procedures MDP-ZZ-LM001 Fluid Leak Management Program 19

71111.08P Procedures MTW-ZZ-WP002 Welder Performance Qualification 27

71111.08P Procedures MTW-ZZ-WP003 Control of Welding Filler Materials 24

71111.08P Procedures MTW-ZZ-WP006 Qualification of Welding Procedures 9

71111.08P Procedures QCP-ZZ-05040 Visual Examination to ASME VT-1 23

71111.08P Procedures QCP-ZZ-05041 Visual Examination to ASME VT-2 30

71111.08P Procedures QCP-ZZ-05042 Visual Examination to ASME VT-3 21

71111.08P Procedures QCP-ZZ-05048 Boric Acid Walkdown for RCS Pressure Boundary 14

71111.08P Procedures QCP-ZZ-05049 RPV Head Bare Metal Examination 5

71111.08P Self- Self-Assessment Material Degradation Management Plan 09/4/2014

Assessments 201309684-08

71111.08P Self- Self-Assessment ISI Program, dated 6/20/14

Assessments 201309684-31

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.08P Work Orders 17002729/180, 17002729/00, 17002729/40,

17992729/580

71111.12 Corrective Condition Reports 201902794, 201901943, 201903344, 201903353,

Action 201903360, 201903366, 201903372

Documents

71111.12 Procedures OTG-ZZ-00002 Reactor Startup - IPTE 61

71111.12 Procedures OTG-ZZ-00003 Plant Startup Hot Zero Power to 30% Power 64

71111.12 Procedures OTN-BB-00001 Reactor Coolant System - IPTE 50

71111.13 Procedures ODMI 19-0002 Tuning Parameter Adjustments on Digital Controls 0

Post Mod Testing

OOA-ZZ-SSM01 Shutdown Safety Monitoring (SSM) 9

71111.15 Corrective Condition Reports 201806521, 201902462, 201904050

Action

Documents

71111.15 Procedures EDP-ZZ-01114 Motor Operated Valve Program Guide 36

71111.15 Procedures MTE-ZZ-QA006 Motor Operated Valve Analyst Guide 10

71111.15 Work Orders 19002798

71111.19 Corrective Condition Reports 201805239, 201902591, 201902876, 201903026,

Action 201903553

Documents

71111.19 Procedures OTN-MD-00001 Switchyard Breakers and Disconnects 30

71111.19 Work Orders 18000062, 18000065, 19001674

71111.20 Corrective Condition Reports 201903004

Action

Documents

71111.20 Procedures ITM-BB-L0053 BBLT0053A/B/BB Fill Vent and Calibration 1

71111.20 Procedures OSP-BB-00007 RCS Heatup and Cooldown Limitations 14

71111.20 Procedures OTA-RK-00018 Annunciator Response Procedure MCB Panel RK018 4

71111.22 Corrective Condition Reports 201902874, 201902927, 201903657, 201903953,

Action 201904075, 201904191

Documents

71111.22 Procedures OSP-AL-P0002 Turbine Driven Aux Feedwater Pump Inservice Test - 80

Group B

71111.22 Procedures OSP-BB-00009 RCS Inventory Balance 38

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.22 Procedures OSP-BB-V002A PORV Inservice Test 14

71111.22 Work Orders 17001333, 17001334, 17003817, 17512419,

17512680, 17513093, 17514041, 17514487,

19507557, 19507663, 19507685, 19507835

71124.01 Corrective Condition Reports 201900315, 201900883, 201900908, 201900930,

Action 201901021, 201901659, 201901908, 201901995

Documents

71124.01 Miscellaneous Air Sample Log Various Air Sample Logs 01/16/2019

-

04/10/2019

71124.01 Miscellaneous PM1002835 Non-Special Nuclear Material RAM Stored in the

Spent Fuel Pool

71124.01 Miscellaneous Source Leak Various Source Leak Checks 01/18/2017 -

Checks 01/25/2019

71124.01 Procedures APA-ZZ-01000 Callaway Energy Center Radiation Protection 046

Program

71124.01 Procedures APA-ZZ-01000, Control of Radioactive Material 22

Appendix A

71124.01 Procedures APA-ZZ-01004 Radiological Work Standards 31

71124.01 Procedures HDP-ZZ-01200 Radiation Work Permits 33

71124.01 Procedures HDP-ZZ-01500 Radiological Postings 48

71124.01 Procedures HDP-ZZ-03000 Radiological Survey Program 47

71124.01 Procedures HDP-ZZ-06000 Contamination Control and Alpha Monitoring Program 24

71124.01 Procedures HSP-ZZ-00001 Radioactive Sealed Source Leak Check Surveillance 15

71124.01 Procedures HTP-ZZ-01203 Radiological Area Access Control 57

71124.01 Procedures HTP-ZZ-02005 Handling of Radioactive Material 49

71124.01 Procedures HTP-ZZ-06001 High Radiation / Locked High Radiation / Very High 51

Radiation Area Access

71124.01 Procedures HTP-ZZ-06028 Radiological Controls for Pools that Contain or Store 9

Spent Fuel

71124.01 Procedures HTP-ZZ-06042 Industrial Radiography Using a Radioactive Source 14

71124.01 Radiation CA-M-20190401-10 RB2000I Mode 3 Survey 04/10/2019

Surveys

71124.01 Radiation CA-M-20190402-24 R23 RB Lower Cavity Blind Flange Removal 04/02/2019

Inspection Type Designation Description or Title Revision or

Procedure Date

Surveys

71124.01 Radiation CA-M-20190402-31 RB2023I Regen HX Post Shielding Survey 04/02/2019

Surveys

71124.01 Radiation CA-M-20190404-31 RB2023I Scaffold Build to BG1E0126 04/04/2019

Surveys

71124.01 Radiation CA-M-20190406-09 RBHead - Reactor Head Lift 04/06/2019

Surveys

71124.01 Radiation CA-M-20190408-05 RB-2000-I G/A Five Days After CRUD Burst 04/08/2019

Surveys

71124.01 Radiation CA-M-20190408-25 Reactor Vessel Head (On Stand) 04/06/2019

Surveys

71124.01 Radiation CA-M-20190410-26 Gross Cavity Decon 04/10/2019

Surveys

71124.01 Radiation CA-M-20190410-27 Rx Shield Plate Install Post Survey 04/10/2019

Surveys

71124.01 Radiation Work R23ENGHRA RF23 Engineering Activities Inside High Radiation 0

Permits (RWPs) Areas in all RCA Areas Including the Reactor Building.

71124.01 Radiation Work R23FUEL RF23 Offload Reactor, Perform FOSAR, Perform 0

Permits (RWPs) Reactor Reload, Core Mapping, Insert Shuffle, Pool

Mapping, B5B Moves, and Miscellaneous Support

Activities.

71124.01 Radiation Work R23HDDESSTUD RF23 Install Stud Tensioner Hoists, Detension 0

Permits (RWPs) Reactor Vessel Studs, Remove Reactor Vessel Studs,

Clean Stud Holes, Lubricate Stud Holes,

Install Stud Hole Plugs, and Install Guides Studs/Pins.

71124.01 Radiation Work R23HDSTUD18 RF23 Activities to Remove Reactor Vessel Stuck Stud 0

Permits (RWPs) 18, Including Thread Repairs, and Inspect Its Stud

Hole. Includes Cutting,

Boring, QC/Engineering Inspections, and Associated

Cavity Work (Except Cavity Decontamination).

71124.01 Radiation Work R23RCPCHANGE RF23 Motor Change on A Reactor Coolant Pump and 0

Permits (RWPs) Associated Tasks.

71124.01 Radiation Work R23STD18DECON RF23 Upper Cavity Gross Rinse, Vacuum of Seal 0

Permits (RWPs) Ring, Upper Cavity Decontamination, and RV Flange

Inspection Type Designation Description or Title Revision or

Procedure Date

Cleaning to Support Removal of

Stuck RV Stud #18. Includes all RP Coverage and

Surveys.

71124.01 Self- AP18006 Nuclear Oversight Audit of Radiological and Non 06/13/2018

Assessments Radiological Environmental Monitoring Programs

71124.02 Corrective Condition Reports 2018-02443, 2018-02930, 2018-02953, 2018-04531,

Action 2018-04758, 2018-04903, 2018-05952, 2018-06019,

Documents 2018-06973, 2019-00904, 2019-00908, 2019-00998,

2019-01277, 2019-01355

71124.02 Miscellaneous RF23 Plant ALARA Review Committee (PARC) 01/24/2019

Meeting

71124.02 Miscellaneous RT Examination of 1" SCH 80 Pipe Weld in Room 113 04/09/2019

of Aux Building Shot Plan

71124.02 Miscellaneous Powering into the Future - Callaway Refuel 23 Daily 04/08/2019 -

News Flyer 04/11/2019

71124.02 Miscellaneous Refuel 23 Outage Update & Shiftly SOM Turnover 04/08/2019 -

04/11/2019

71124.02 Miscellaneous Callaway Radiation Protection Current Log 04/11/2019

71124.02 Miscellaneous CA2943 Radiography Checklist - Radioactive Source 04/09/2019

71124.02 Miscellaneous Reactor Vessel 01/31/2019

Stuck Stud

Removal Project

71124.02 Procedures APA-ZZ-01000 Callaway Energy Center Radiation Protection 45

Program

71124.02 Procedures APA-ZZ-01001 Callaway Plant ALARA Plant 27

71124.02 Procedures APA-ZZ-01004 Radiological Work Standards 31

71124.02 Procedures HDP-ZZ-01100 ALARA Planning and Review 24

71124.02 Procedures HDP-ZZ-01200 Radiation Work Permits 33

71124.02 Procedures HDP-ZZ-01500 Radiological Postings 48

71124.02 Procedures HDP-ZZ-06000 Contamination Control and Alpha Monitoring Program 24

71124.02 Procedures HTP-ZZ-01101 Administrative Controls for Radiation Shielding 26

71124.02 Procedures HTP-ZZ-01104 Hot Spot Trending Program 6

71124.02 Procedures HTP-ZZ-01203 Radiological Area Access Control 57

71124.02 Procedures HTP-ZZ-06001 High Radiation/Locked High Radiation/Very High 51

Inspection Type Designation Description or Title Revision or

Procedure Date

Radiation Area Access

71124.02 Procedures HTP-ZZ-06042 Industrial Radiography Using A Radioactive Source 14

71124.02 Radiation CA-M-20190402-14 SJ Sample & Boronometer / PASS Rooms 04/02/2019

Surveys

71124.02 Radiation CA-M-20190402-17 Access Pit 04/02/2019

Surveys

71124.02 Radiation CA-M-20190405-23 RB-2090 RF Stud Rack Survey Update 18501154.500 04/05/2019

Surveys

71124.02 Radiation CA-M-20190405-31 RB2047 General Area - Routine Survey 04/05/2019

Surveys

71124.02 Radiation CA-M-20190405-33 RB2068 General Area Routine 04/05/2019

Surveys

71124.02 Radiation CA-M-20190408-19 Safety Injection Pump Room A 04/08/2019

Surveys

71124.02 Radiation CA-M-20190408-32 RB2026' General Area Routine 04/08/2019

Surveys

71124.02 Radiation CA-M-20190408-5 RB-2000-I G/A Five Days After CRUD Burst 04/08/2019

Surveys

71124.02 Radiation CA-M-20190410-26 Gross Cavity Decontamination 04/10/2019

Surveys

71124.02 Radiation CA-M-20190410-27 Rx Shield Plate Install Post Survey 04/10/2019

Surveys

71124.02 Radiation Work 16003707510 EMV0161 Radiography 0

Permits (RWPs)

71124.02 Radiation Work 18500671139 RF23 Scaffold to BGV0449 0

Permits (RWPs)

71124.02 Radiation Work R23HDDESTUD Detension Reactor Vessel Studs 0

Permits (RWPs)

71124.02 Radiation Work R23HDRESTUD Install Reactor Vessel Studs 0

Permits (RWPs)

71124.02 Radiation Work R23HDSTUD18 Remove Stuck Stud 18 0

Permits (RWPs)

71124.02 Radiation Work R23STD18DECON RF23 Cavity Decontamination 0

Permits (RWPs)

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.02 Self- 201820044-064 NRC Pre Inspection Self-Assessment: Rad Safety 06/14/2018

Assessments ALARA Planning and Occupational Dose Assessment

71124.02 Self- AP19001 Nuclear Oversight Audit of Radiation Protection 03/27/2019

Assessments

71124.05 Calculations HPCI-05-03 Evaluate Plant Radioactivity Mixture (Set Points) 2/22/2005

71124.05 Calculations HPCI-1403 Use of PM-12 for Passive Monitoring 12/11/2018

71124.05 Calibration 16503276-500 SD-RE-024 Reactor Coolant Sample Room 3/16/2018

Records

71124.05 Calibration 16513022-500 EG-RE-009 CCW HX A Inlet 5/7/2018

Records

71124.05 Calibration 17504995-500 SD-RE-038 Spent Fuel Pool Area Rad High 10/22/2018

Records

71124.05 Calibration 17506055-500 SD-RE-012 Aux Bldg. Corridor Basement Hi 6/11/2019

Records

71124.05 Calibration 17506056-500 SD-RE-015 Aux Bldg. Corridor Basement Hi 6/11/2019

Records

71124.05 Calibration 17508210-500 GT-RE-059 CTMT High Range (Electronics 1/17/2019

Records Calibration)

71124.05 Calibration 17510146-500 GT-RE-033 CTMT Purge 2/8/2019

Records

71124.05 Calibration 17512545-500 GT-RE-059 CTMT High Range (Isotopic Calibration) 4/10/2019

Records

71124.05 Calibration CAM-4019-HP Calibration Certificate (PING-1A) 6/28/2018

Records

71124.05 Calibration CAM-4020-HP Calibration Certificate (PING-1A) 2/27/2019

Records

71124.05 Calibration CAM-4045-HP Calibration Certificate (Eberline AMS-4) 12/10/2018

Records

71124.05 Calibration CRM-4023-HP Calibration Certificate (Ludlum Model 2000) 3/5/2019

Records

71124.05 Calibration CRM-4026-HP Calibration Certificate (Ludlum Model 2000) 8/21/2018

Records

71124.05 Calibration CRM-4089-HP Calibration Certificate (Ludlum Model 177) 1/26/2019

Records

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.05 Calibration CRM-4134-HP Calibration Certificate (Ludlum Model 177) 2/6/2019

Records

71124.05 Calibration GPC-4003-HP Instrument Calibration / Verification (Tennelec) 11/4/2007

Records

71124.05 Calibration GSS-4220-HP Instrument Calibration / Verification (Ortec - Detector 3/21/2019

Records 2)

71124.05 Calibration LAS-4198-HP Calibration Certificate (Radeco Model HD-29A) 1/28/2019

Records

71124.05 Calibration LSC-4004-HP Instrument Calibration / Verification (Perkin-Elmer) 4/25/2018

Records

71124.05 Calibration PCM-4054-HP Calibration Certificate (PCM-12) 8/28/2018

Records

71124.05 Calibration PM-4046-HP Calibration Certificate (PM-12) 8/28/2018

Records

71124.05 Calibration TM-4010-HP Calibration Certificate (SAM-12) 3/31/2019

Records

71124.05 Corrective Condition Reports 201703216, 201707720, 201800120, 201801122,

Action 201805869, 201805975, 201900857, 201901599,

Documents 201902538, 201903111

71124.05 Miscellaneous Area Radiation Monitor Calibration Data 6/11/2019

71124.05 Miscellaneous Calibration of Xradin Ion Chamber A3, A4, & A6 3/23/2018

71124.05 Procedures APA-ZZ-00014 Conduct of Operations - Radiation Protection 25

71124.05 Procedures HDP-ZZ-04000 Radiation Protection Instrumentation Program 29

71124.05 Procedures HDP-ZZ-04700 Count Room and Whole Body Counter Quality Control 22

Program

71124.05 Procedures HSP-ZZ-00014 Rad Monitor Non-Functionality 26

71124.05 Procedures HTP-SD-06033 Control of Area Radiation Monitor Alarm Setpoints 6

71124.05 Procedures HTP-ZZ-04101-DTI- Ludlum Model 177 Frisker Calibration 5

M177-Cal

71124.05 Procedures HTP-ZZ-04102-DTI- Eberline RO-2 Survey Meter Calibration 2

RO2-CAL

71124.05 Procedures HTP-ZZ-04150 Operations of the GA Process Monitor System 54

71124.05 Procedures HTP-ZZ-04167-DTI- Thermo RadEye Neutron Survey Meter Calibration 0

Thermo-Radeye

Inspection Type Designation Description or Title Revision or

Procedure Date

NL-Cal

71124.05 Procedures HTP-ZZ-04176-DTI- Thermo Fisher Model SAM-12 Small Articles Monitor 5

SAM12-Cal Calibration

71124.05 Procedures HTP-ZZ-04178-DTI- Rotem Telepole Survey Meter Calibration 10

Telepole-Cal

71124.05 Procedures HTP-ZZ-06020 Count Room Analytic and Quality Control Calculations 24

and Methods

71124.05 Procedures HTP-ZZ-07010 Alternate Method for Obtaining CHARMS Reading 8

71124.05 Procedures ISL-GT-00R59 CTMT High Range Area Rad Monitor Loop Calibration 22

71124.05 Procedures ITL-SD-00R00 Eberline Area Radiation Monitors 9

71124.05 Radiation CA-M-20190327-19 NS-1 Neutron Source - Quarterly Routine 3/27/2019

Surveys

71124.05 Self- 201807096- Instrument Program and Pre-NRC Inspection 3/28/2019

Assessments 010/201900029-

036

71124.05 Self- AP19001 Nuclear Oversight Audit of Radiation Protection 3/27/2019

Assessments

71124.06 Calculations RP09-2017- Batch Liquid Radioactive Release Permit 07/28/2017

L0028;1

71124.06 Calculations RP09-2018- Batch Liquid Radioactive Release Permit 02/01/2018

L0007;1

71124.06 Calculations RP09-2019- Batch Liquid Radioactive Release Permit 06/11/2019

L0037;0

71124.06 Calculations RP11A-2019- Batch Airborne Radioactive Release Permit 02/17/2019

G0013;1

71124.06 Calculations RP13-2017- Continuous Airborne Radioactive Release Permit 12/07/2017

G0006;52

71124.06 Calculations RP13-2018- Continuous Airborne Radioactive Release Permit 12/20/2018

G0002;56

71124.06 Calibration Job 12504965.500 RW Bldg Disch Line Process Rad Mon Loop Cal 08/21/2018

Records

71124.06 Calibration Job 17502388.500 Ctmt Bld Air Exg Plenum (Unit Vent) Rad Xmt 08/23/2018

Records

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.06 Corrective Condition Report 201703216, 201703232, 201703516, 201800052,

Action 201800125, 201801122, 201801301, 201802268,

Documents 201802267, 201802407, 201802547, 201803062,

201803391, 201805008, 201805070, 201805144,

201805978, 201805987, 201805989, 201806167,

201900239, 201900348, 201900353, 201900438

71124.06 Miscellaneous Callaway Energy Center 2017 Annual Radioactive

Effluent Release Report

71124.06 Miscellaneous Callaway Energy Center 2018 Draft Annual

Radioactive Effluent Release Report

71124.06 Miscellaneous Job 15510527 FGG02A In-Place Bypass Leakage Test 03/10/2017

71124.06 Miscellaneous Job 16509259 FGK02B In-Place Bypass Leakage Test 05/31/2018

71124.06 Miscellaneous Job 17503239 FGE01 In-Place Bypass Leakage Test 07/16/2018

71124.06 Procedures HSP-ZZ-00002 Radioactive Liquid Effluent Concentration 21

71124.06 Procedures HSP-ZZ-00003 Dose Assessments from Liquid Effluents 11

71124.06 Procedures HSP-ZZ-00004 Projected Dose from Liquid Waste 16

71124.06 Procedures HTP-ZZ-02006 Liquid Radwaste Release Permit (Batch) 93

71124.06 Procedures HTP-ZZ-02006 Liquid Radwaste Release Permit (Batch) 93

71124.06 Procedures HTP-ZZ-02007 Gaseous Radwaste Release Permit (Gas Decay 48

Tank)

71124.06 Procedures HTP-ZZ-02008 Gaseous Radwaste Release Permit (Auxiliary/Fuel 30

Building Ventilation)

71124.06 Procedures HTP-ZZ-02009 Gaseous Radwaste Release Permit (Radwaste 29

Building Ventilation)

71124.06 Procedures HTP-ZZ-03006 Use of Airborne Sampling Cart 32

71124.06 Procedures ISF-GH-0R10B RW Building Exhaust Discharge Radiation Detector 32

71124.06 Self- Nuclear Oversight Audit of Radiological and Non- 06/13/2018

Assessments Radiological Environmental Monitoring Programs, AP

18006

71124.06 Self- Nuclear Oversight Audit of Radiation Protection 03/27/2019

Assessments AP19001

71124.07 Calculations HPCI 1092 Evaluation of the 2018 Annual Land Use Census 1

71124.07 Calculations HPCI 18-01 Evaluation of the 2017 Annual Land Use Census 0

71124.07 Calculations HPCI-1503 Calculation of Long- Term Meteorological Dispersion 1

Inspection Type Designation Description or Title Revision or

Procedure Date

Parameters

71124.07 Calculations HPCI-1506 Evaluation of Air Sampler Locations with Respect to 1

the Recalculated Dispersion Parameters

71124.07 Calibration Job 18504263 RD01-Primary Meteorological Tower Loop A 10/24/2018

Records

71124.07 Calibration Job 18504272 RD01-Primary Meteorological Tower Loop B 10/25/2018

Records

71124.07 Calibration Job 18511186 RD01-Primary Meteorological Tower Loop A 03/29/2019

Records

71124.07 Calibration Job 18511189 RD01-Primary Meteorological Tower Loop B 03/25/2019

Records

71124.07 Calibration LAS-4179 Low volume Air Sampler Serial Number 10216 11/09/18

Records

71124.07 Calibration LAS-4182 Low Volume Air Sampler Serial Number 8977 07/20/2018

Records

71124.07 Calibration LAS-4201 Low Volume Air Sampler Serial Number 8975 01/31/2019

Records

71124.07 Corrective Condition Reports 201700071, 201700835, 201701864, 201702166,

Action 201702981, 201703331, 201703581, 201705266,

Documents 201705398, 201705399, 201705403, 201705417,

201706786, 201706793, 201706794, 201801634,

201801736, 201801950, 201802361, 201803357,

201900612, 201900937, 201901217, 201902100

71124.07 Corrective Condition Reports 201904252

Action

Documents

Resulting from

Inspection

71124.07 Miscellaneous Environmental Dosimetry Company - Annual Quality 03/07/2018

Assurance Status Report: January - December 2017

71124.07 Miscellaneous Environmental Dosimetry Company - Annual Quality 03/12/2019

Assurance Status Report: January - December 2018

71124.07 Miscellaneous AP18006 Nuclear Oversight Audit of Radiological and Non 06/13/2018

Radiological Environmental Monitoring Programs

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.07 Miscellaneous AP19001 Nuclear Oversight Audit of Radiation Protection 03/27/2019

71124.07 Miscellaneous APA-ZZ-01003 Off-Site Dose Calculation Manual 23

71124.07 Miscellaneous AREOR Annual Radiological Environmental Operating Report:

January 1- December 31, 2017

71124.07 Miscellaneous AREOR Annual Radiological Environmental Operating Report:

January 1- December 31, 2018

71124.07 Miscellaneous NAQA-17-0038 Audit Report 17-007 for the Audit of Environmental 09/01/2017

Dosimetry Company

71124.07 Procedures HDP-ZZ-07000 Radiological Environmental Monitoring Program and 9

Groundwater Protection Initiative

71124.07 Procedures HTP-ZZ-04123-DTI- F&J DF-1T Low Volume Air Sampler Calibration 8

F&J-DF1T-CAL

71124.07 Procedures HTP-ZZ-07001-DTI- Collection and Shipping of Environmental Crop 7

Crop-Sampling Samples

71124.07 Procedures HTP-ZZ-07001-DTI- Collection and Shipping of Environmental Water 11

Water-Sampling Samples

71124.07 Procedures HTP-ZZ-07101-DTI- REMP Sample Locations and Analysis Schedule 32

REMP-SMPL-

SCHED

71124.07 Procedures HTP-ZZ-07103-RP- Evaluation and Reporting of REMP Data 2

DTI-REMP-

DATAEVAL

71124.07 Procedures ISL-RD-RD01A Meteorological Monitoring Instruments - Elevator A 15

Loop Calibration

71124.07 Procedures ISL-RD-RD01B Meteorological Monitoring Instruments - Elevator B 10

Loop Calibration

71124.07 Procedures RP-DTI-ENVIRON- Environmental TLD Locations 5

TLD LOCATIONS

71124.07 Procedures RP-DTI- Response to Spills or Leaks of Radioactive Material 10

ENVIRONMENTAL- into Groundwater

SPILLRESP

71124.08 Corrective Condition Report 201701008, 201702081, 201704005, 201706627,

Action 201804430, 201804447, 201806969, 201900861,

Documents 201900930, 201901038, 201902796, 201904190

Inspection Type Designation Description or Title Revision or

Procedure Date

71124.08 Miscellaneous Callaway Final Safety Analysis Report (FSAR) - 06/01/2018

Chapter 11.4

71124.08 Miscellaneous 2018 RAM and Radwaste Shipping Log 2018

71124.08 Miscellaneous Callaway Energy Center 2018 Annual Radioactive 2018

Effluent Release Report

71124.08 Miscellaneous Callaway Energy Center 2017 Annual Radioactive 2017

Effluent Release Report

71124.08 Miscellaneous 2017 RAM and Radwaste Shipping Log 2017

71124.08 Procedures APA-ZZ-01011 Process Control Program 14

71124.08 Procedures HTP-HC-09002 10 CFR 61 Sampling Program 4

71124.08 Procedures HTP-ZZ-02005 Handling of Radioactive Material 49

71124.08 Procedures HTP-ZZ-09003 Shipment of Radioactive Wastes 6

71124.08 Procedures RDP-ZZ-00200 Radwaste Operational Guidelines 21

71124.08 Procedures RTN-HC-01900 On-Site Storage Container Handling Procedure 6

71124.08 Procedures RTS-HC-00310 Primary Resin Sluice To Bulk Waste Disposal Station 47

71124.08 Procedures RTS-HC-00350 Primary Spent Resin Storage Tank Transfer To Bulk 14

Waste Disposal Station

71124.08 Procedures RTS-ZZ-CH040 Handling of Transport Cask Model 14-215H 12

71124.08 Procedures RTS-ZZ-CH050 Handling Procedure for CNS 8-120A Transport Cask 5

71124.08 Radiation CA-M-20190409-24 RWY-4 & RWY-3 Radwaste Yard Plant (North & 04/09/2019

Surveys South)

71124.08 Radiation CA-M-20190415-05 7228 Drywaste Compactor Area - Quarterly Routine 04/14/2019

Surveys

71124.08 Radiation CA-M-20190421-24 7225 Quarterly Routine Survey - Low Level Drum 04/21/2019

Surveys Storage Area

71124.08 Radiation CA-M-20190524-02 RSS-1 Characterization - Resin Liner #PO661751-16 05/24/2019

Surveys

71124.08 Self- EPRI Solid Radioactive Waste Program Assessment 07/14/2017

Assessments at Ameren Callaway Nuclear Power Plant

71124.08 Self- 201900029-035 Simple Self-Assessment: Shipping Program 05/02/2019

Assessments

71124.08 Self- AP19001 Ameren Nuclear Oversight Audit of Radiation 03/27/2019

Assessments Protection

71124.08 Shipping 17-010 UN3321, RAM, LSA-11, Class 7 (Drummed 06/22/2017

Inspection Type Designation Description or Title Revision or

Procedure Date

Records Mechanical Filters)

71124.08 Shipping 17-012 UN3321, RAM, LSA-II, Class 7 (Dewatered Resin) 07/12/2017

Records

71124.08 Shipping 17-061 UN2912, RAM, LSA-I, Class 7 (Dry Active Waste 11/17/2017

Records Cycle 21)

71124.08 Shipping 18-001 UN3321, RAM, LSA-II, Class 7 (Dewatered Resin and 01/12/2018

Records Charcoal)

71124.08 Shipping 18-010 UN2911, RAM, Excepted Package, Class 7 04/12/2018

Records (Instruments)

71124.08 Shipping 18-018 UN2911, RAM, Excepted Package, Class 7 09/20/2018

Records (Instruments)

71124.08 Shipping 18-036 UN2912, RAM, LSA-I, Class 7 (Dry Active Waste) 12/26/2018

Records

71124.08 Shipping 19-005 UN3321, RAM, LSA-II, Class 7 (Resin and Charcoal) 03/19/2019

Records

71124.08 Shipping 19-021 UN2912, RAM, LSA-I, Class 7 (Resin) 06/11/2019

Records

71153 Corrective Condition Reports 201901943, 201903787, 201903832

Action

Documents

The following items are requested for the

Occupational Radiation Safety Inspection

at Callaway

Dates of Inspection: 04/08/2019 to 04/12/2019

Integrated Report 2019002

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Monday, March 25, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1-A, applicable organization charts in file/folder 1-B, etc.

The information should be provided in electronic format or a secure document management

service. If information is placed on ims.certrec.com, please ensure the inspection exit date

entered is at least 30 days later than the onsite inspection dates, so the inspectors will have

access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via

e-mail at Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

1. Radiological Hazard Assessment and Exposure Controls (71124.01) and

Performance Indicator Verification (71151)

Date of Last Inspection: November 5, 2018

A. List of contacts and telephone numbers for the Radiation Protection Organization Staff

and Technicians, as well as the Licensing/Regulatory Affairs staff. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, LARs, and LERs written since the last inspection

date, related to this inspection area

D. Procedure indexes for the radiation protection procedures and other related disciplines.

E. Please provide procedures related to the following areas noted below. Additional

procedures may be requested by number after the inspector reviews the procedure

indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations, if not included in #1.

3. Personnel Dosimetry

4. Posting of Radiological Areas

5. High Radiation Area Controls

6. RCA Access Controls and Radiation Worker Instructions

7. Conduct of Radiological Surveys

8. Radioactive Source Inventory and Control

9. Fuel Pool Inventory Access and Control

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) since the last inspection date.

1. Initiated by the radiation protection organization

2. Assigned to the radiation protection organization

NOTE: These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. List of radiologically significant work activities scheduled to be conducted during the

inspection period. (If the inspection is scheduled during an outage, please also include a

list of work activities greater than 1 rem, scheduled during the outage with the dose

estimate for the work activity.) Please include the radiological risk assigned to each

activity.

I. Provide a summary of any changes to plant operation that have resulted or could result

in a significant new radiological hazard. For each change, please provide the

assessment conducted on the potential impact and any monitoring done to evaluate it.

J. List of active radiation work permits and those specifically planned for the on-site

inspection week.

K. Please provide a list of air samples taken to verify engineering controls and a separate

list for breathing air samples in airborne radiation areas or high contamination work

areas. Please include the RWP the breathing air sampling supports.

L. Please provide the current radioactive source inventory, listing all radioactive sources

that are required to be leak tested. Indicate which sources are deemed 10 CFR Part 20,

Appendix E, Category 1 or Category 2. Please indicate the radioisotope, initial and

current activity (w/assay date), and storage location for each applicable source.

M. The last two leak test results for all required/applicable radioactive sources that have

failed its leak test within the last two years. Provide any applicable condition reports.

N. A list of all non-fuel items stored in the spent fuel pools, and if available, their appropriate

dose rates (Contact / @ 30cm)

O. A list of radiological controlled area entries greater than 100 millirem, since the last

inspection date. The list should include the date of entry, some form of worker

identification, the radiation work permit used by the worker, dose accrued by the worker,

and the electronic dosimeter dose alarm set-point used during the entry (for

Occupational Radiation Safety Performance Indicator verification in accordance with IP 71151).

P. A list describing VHRAs and TS HRAs (> 1 rem/hour) that are current and historical.

Include their current status, locations, and control measures.

Q. Temporary effluent monitor locations and calibrations (AMS-4) used to monitor normally

closed doors or off-normal release points (e.g., equipment hatch or turbine heater bay

doors). Include any CRs associated with this monitoring or instrumentation.

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: May 21, 2018

A. List of contacts and telephone numbers for ALARA program personnel, as well as the

Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell

numbers are appropriate, then please include them as well.

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, LARs, and LERs, written since the date of last

inspection, focusing on ALARA

D. Procedure index for ALARA Program procedures and other related disciplines.

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Planning

3. ALARA Reviews

4. ALARA Committee

5. Radiation Work Permit Preparation

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of last inspection, related to the ALARA

program, including exceeding RWP Dose Estimates.

NOTE: These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. List of work activities (RWPs) greater than 1 rem, since date of last inspection,

including the original dose estimates and actual doses accrued. (Excel format

preferred). Please provide all revisions/changes, as well as any related RWPs that

support the work activity.

I. List of active work activities (RWPs) that will be in use while we are onsite, including the

dose and dose rate settings, and if available, the planned dose. Include planning

documents and surveys. Include radiological risk assessments and proposed control

measures.

J. Site dose totals for the past 3 years (based on dose of record). Also provide the current

year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide

another document that separates the online and outage doses for the past 3 years.

K. Most recent assessment of your isotopic mix, including the hard-to-detect radionuclides

and alpha hazards. Include a list of new and historical exposure issues (radiological

source term or high exposure areas/activities).

L. If available, provide a copy of the lessons learned from the most recently completed

outage for each unit. Include a summary list of any associated corrective action

documents and the current status of any corrective actions assigned.

M. Please provide the methods/reports that are in your process to meet the requirements of

CFR 20.1101(c) for periodic review of your RP program.

N. Current exposure trends (BRAC dose rates and/or source term information).

The following items are requested for the

Public Radiation Safety Inspection

at Callaway

Dates of Inspection: 06/10/2019 to 06/14/2019

Integrated Report 2019002

Inspection areas are listed in the attachments below.

Please provide the requested information on or before Friday, May 24, 2019.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.05 should be in a file/folder titled

5-A, applicable organization charts in file/folder 5-B, etc.

The information should be provided in electronic format or a secure document management

service. If information is placed on a secured document management system, please ensure

the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the

inspectors will have access to the information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Natasha Greene at 817-200-1154 or via

e-mail at Natasha.Greene@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

5. Radiation Monitoring Instrumentation (71124.05)

Date of Last Inspection: February 27, 2017

A. List of contacts and telephone numbers for the following areas below. Please include

area code and prefix. If work cell numbers are appropriate, then please include them as

well.

1. Process monitor calibration (Include Chemistry, Systems Engineering and I&C, as

applicable)

2. Radiation protection instrument calibration (Portable and Stationary)

3. Installed instrument calibrations (Include Systems Engineering and I&C)

4. Count room and Laboratory instrument calibrations (Include RP and Chemistry, as

applicable)

5. EP contacts for Equipment Important to Emergency Response/Preparedness

(EITER)

6. Licensing/Regulatory Affairs

B. Applicable organization charts, including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, vendor or NUPIC audits for contractor support,

LARs, and LERs, performed since the date of the last inspection, related to:

1. Portable Radiation instruments: Area radiation monitors, portable continuous air

monitors (AMS3/4), portable survey instruments (count rate, dose rate, occupational

air sampling), electronic dosimeters, teledosimetry

2. Stationary Radiation Instruments: Portal monitors, small article monitors, personnel

contamination monitors, or whole body counters

3. Installed Radiation Instruments: Area radiation monitors (RMS), process monitors

(non-effluent), criticality monitors, accident monitors

4. Count Room instrumentation (Chemistry and RP, if separate RP Ops and Effluents):

Gamma Spec, LSC, Gross Alpha, Gross Beta, including bench-top counters

D. Procedure indexes for radiation protection procedures and other related disciplines.

1. Calibration, use, and operation of continuous air monitors, portable survey

instruments, temporary area radiation monitors, electronic dosimeters, teledosimetry

2. Calibration use and operation of portal monitors, small article monitors, personnel

contamination monitors, and whole body counters

3. Calibration of installed area radiation monitors, process monitors, criticality monitors,

and accident monitors

4. Calibration use and operation of Count Room instrumentation (GS, LSC, GA, GB)

(include bench top counters here)

NOTE: Please ensure that RP, Chemistry, and I&C procedures are included, as

appropriate.

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure index.

1. Calibration of portable ion chambers

2. Calibration of Friskers

3. Calibration of telescoping high range instruments

4. Calibration of portable neutron instruments

5. Calibration of SAMs

6. Whole body counter calibration

7. Laboratory instrumentation quality control

8. Calibration of Containment/Drywell high range radiation monitor

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to the following

programs:

1. Area radiation monitors, continuous air monitors, portable survey instruments,

electronic dosimeters, and teledosimetry

2. Portal monitors, small article monitors, personnel contamination monitors, and whole

body counters

3. Installed radiation monitors, criticality monitors, accident range monitors

4. Count room radiation instruments

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. State the required calibration frequency and provide the most recent calibration data for

the whole body counters, at least one portable survey instrument, one area radiation

monitor, one air sampler, one continuous air monitor, and one drywell/containment high-

range monitor.

I. Provide a list of any scheduled calibrations, while we are onsite, for the instrumentation

noted in request above, in 5-I.

J. Provide the alarm set point values for the portal and personnel contamination monitors in

operation.

K. Radiation Monitoring System health report for the previous 12 months

L. Provide the following lists of instruments to include make, model, identifier (S/N or plant

ID), and location:

1. Portable radiation instruments currently in use (for EADs just make, model, and

quantity).

2. Stationary radiation instruments currently in use.

3. Installed Radiation monitors

a. Area radiation monitors and

b. Process radiation monitors.

(Include their instrumentation designator, function and calibration procedure

number and title.) Please indicate which, if any, detectors have been

replaced within the past 2 years (since the last inspection).

c. Radiation instrumentation abandoned in place.

d. Radiation instrumentation covered by the maintenance rule.

M. Provide a list of sources used routinely for source check of portable, stationary, and

installed radiation monitoring instruments.

N. Provide the NIST traceability and calibration or verification of the primary sources for

instrument calibration and the procedures used to achieve this.

6. Radioactive Gaseous and Liquid Effluent Treatment (71124.06)

Date of Last Inspection: February 27, 2017

A. List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Radiological effluent control (liquid & gaseous) and reporting

(RP, Chemistry, RW, Ops, etc.)

2. Effluent Monitor calibration (liquid and gaseous) and maintenance

(RP, Chemistry, I&C, Maintenance, Systems Engineering, EP, etc.)

3. Engineered safety feature air cleaning systems for effluent release

(Systems Engineering, I&C, Maintenance, etc.)

4. Licensing/Regulatory Affairs

B. Applicable organization charts including position or job titles for the above individuals

and also for their supportive Management. Please include as appropriate for your site,

Site Management, RP, Chemistry, Maintenance (I&C), Engineering, and Emergency

Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since the date of the last inspection, related to:

1. Radioactive effluents and effluent radiation monitors

2. Engineered Safety Feature Air cleaning systems

D. Procedure indexes for the following areas and related disciplines.

1. Radioactive effluents and effluent radiation monitors (to include the flow monitors)

2. Engineered Safety Feature Air cleaning systems (both TS and non-TS systems for

effluents)

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling and analysis of radioactive effluents

2. Effluent monitor setpoint determination

3. Generating radioactive effluent release permits

4. Effluent Monitor Calibrations (Include associated flow monitors)

5. Laboratory instrumentation quality control

6. In-place testing of HEPA filters and charcoal adsorbers for TS effluent exhaust

systems and other effluent air-cleaning systems, but not breathing air systems

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, associated with:

1. Radioactive effluents

2. Effluent radiation monitors (include associated effluent flow monitors)

3. Engineered Safety Feature Air cleaning systems (effluents, not breathing air)

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. Annual Radioactive Effluent Release Reports for the latest two calendar years

I. Current revision of the Offsite Dose Calculation Manual (or other name, but include all

parts for effluents) and any changes made since the last inspection.

J. The inter-laboratory comparison results for laboratory quality control performance of

effluent sample analysis for the latest two calendar years

K. Effluent sampling schedule for the week of the inspection

L. Provide the last three annual trends of vent/stack effluent flow rates, by chart or table.

M. Operations department (or other responsible dept.) log records for effluent monitors

removed from service or out of service or a list of the same and compensatory actions

taken during the out of service condition.

N. Listing or log of liquid and gaseous release permits since the date of the last inspection

O. A list of the technical specification-required air cleaning systems with the two most

recent surveillance test dates of in-place filter testing (of HEPA filters and charcoal

adsorbers) and laboratory testing (of charcoal efficiency) and the work order numbers

associated with the surveillances (and their system number/name).

P. System Health Report for radiation monitoring instrumentation. Also, please provide a

specific list of all effluent radiation monitors that were considered inoperable for 7 days

or more since the date of the last inspection. If applicable, please provide the relative

Special Report and condition report(s). If not covered by maintenance rule, please

provide rationale.

Q. A list of significant changes made to the gaseous and liquid effluent process monitoring

system since the date of the last inspection. If applicable, please provide the

corresponding UFSAR section in which this change was documented.

R. A list of any occurrence in which a non-radioactive system was contaminated by a

radioactive system since the date of the last inspection. Please include any relevant

condition report(s).

S. Current Part 61 analyses for hard to detect radionuclides

T. Latest Land Use Census (coordinate with 71124.07)

U. Effluent based procedures for EALs or EOPs.

7. Radiological Environmental Monitoring Program (71124.07)

Date of Last Inspection: February 27, 2017

A. List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Radiological environmental monitoring (RP, Chemistry, I&C, etc.)

2. Meteorological monitoring (RP, Chemistry, EP, I&C, System Engineering, etc.)

3. Maintenance and calibration of the above equipment

4. Licensing/Regulatory Affairs

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, self-assessments, vendor or NUPIC audits of contractor support, and

LERs written since the date of the last inspection, related to:

1. Radiological environmental monitoring program (including contractor environmental

laboratory audits, if used to perform environmental program functions)

2. Environmental TLD processing facility

3. Meteorological monitoring program

D. Procedure index for the following areas and other related disciplines.

1. Radiological environmental monitoring program

2. Meteorological monitoring program

3. Maintenance and calibration of related instrumentation, including the meteorological

tower

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Sampling, collection and preparation of environmental samples

2. Sample analysis (if performed onsite)

3. Laboratory instrumentation quality control

4. Meteorological Tower sensor calibrations

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to the following

programs:

1. Radiological environmental monitoring (include TLDs and air sample pumps or their

infrastructure)

2. Meteorological monitoring (include Met Tower sensors and support equipment)

These lists should include a description of the condition that provides sufficient

detail that the inspectors can ascertain the regulatory impact, the significance

level assigned to the condition, the status of the action (e.g., open, working,

closed, etc.) and the search criteria used. Please provide in document formats

which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. Copies of the two most recent calibration packages for the meteorological tower

instruments

I. Copies of the Annual Radiological Environmental Operating Reports and Land Use

Census for the latest two calendar years, and current revision of the Offsite Dose

Calculation Manual. Please include any supportive documentation for the changes

made to the ODCM since the last inspection.

J. Copy of the environmental laboratorys inter-laboratory comparison program results for

the latest two calendar years, if not included in the Annual Radiological Environmental

Operating Report

K. Data from the environmental laboratory documenting the analytical detection sensitivities

for the various environmental sample media (i.e., air, water, soil, vegetation, and milk)

L. Quality Assurance audits (e.g., NUPIC) for contracted services

M. Current NEI Groundwater Protection Initiative (GPI) Plan and status. Provide the most

recent monitoring results for each monitoring well per the GPI. Provide a separate list of

any missed samples, as applicable.

N. Technical requirements manual or licensee controlled specifications which list the

meteorological instruments calibration requirements

O. If applicable, per NEI 07-07, provide any reports that document any spills/leaks to

groundwater since the date of the last inspection. Please indicate what external

communications were made regarding each spill/leak.

P. Provide any new entries into 10 CFR 50.75(g) files since the date of the last inspection.

Q. Please identify your three highest X/Q (chi/Q) and/or D/Q sectors, as currently used in

the selection of your required REMP sampling locations. If these are different values

from your most recent meteorological assessment, please provide that assessment and

indicate the three highest X/Q and/or D/Q sectors per your latest assessment. Also

indicate your noted predominant and least prevalent wind direction/sector, as used in

your REMP analysis.

R. Provide the height of the highest effluent release point. Please indicate if the height

accounts for plant grade elevation. Please also provide the most probable atmospheric

release height, if different from the highest effluent release point.

S. Please provide a schedule of any planned REMP sampling activities while we, the NRC,

are scheduled to be onsite performing this inspection.

8. Radioactive Solid Waste Processing, and Radioactive Material Handling, Storage,

and Transportation (71124.08)

Date of Last Inspection: February 27, 2017

A. List of contacts and telephone numbers for the following areas. Please include area

code and prefix. If work cell numbers are appropriate, then please include them as well.

1. Solid Radioactive waste processing (RP, Chemistry, Ops, Maintenance, I&C,

Engineering, etc.)

2. Transportation of radioactive material/waste (RP, Maintenance, Ops, Security,

Chemistry, etc.)

3. personnel involved in solid radwaste processing, transferring, and transportation of

radioactive waste/materials)

4. Licensing/Regulatory Affairs

B. Applicable organization charts including position or job titles. Please include as

appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),

Engineering, and Emergency Protection. (Recent pictures are appreciated.)

C. Copies of audits, department self-assessments, and LERs written since the date of the

last inspection, related to:

1. Solid radioactive waste management

2. Radioactive material/waste transportation program

D. Procedure index for the following areas and other related disciplines.

1. Solid radioactive waste management

2. Radioactive material/waste transportation

E. Please provide specific procedures related to the following areas noted below.

Additional procedures may be requested by number after the inspector reviews the

procedure indexes.

1. Process control program and any changes made since the last inspection

2. Solid and liquid radioactive waste processing

3. Waste stream sampling and analysis

4. Waste characterization and classification

5. Radioactive material/waste packaging & shipping

F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently

committed to relative to this program. Please include the revision and/or date for the

commitment and where this may be located in your current licensing basis documents.

G. Please provide a summary list of corrective action documents (including corporate and

sub-tiered systems) written since the date of the last inspection, related to:

1. Solid radioactive waste

2. Transportation of radioactive material/waste

NOTE: These lists should include a description of the condition that provides

sufficient detail that the inspectors can ascertain the regulatory impact, the

significance level assigned to the condition, the status of the action (e.g., open,

working, closed, etc.) and the search criteria used. Please provide in document

formats which are sortable and searchable so that inspectors can quickly and

efficiently determine appropriate sampling and perform word searches, as

needed. (Excel spreadsheets are the preferred format.) If codes are used,

please provide a legend for each column where a code is used.

H. Copies of training lesson plans for 49 CFR 172, Subpart H, for radwaste processing,

packaging, and shipping

I. Provide a summary list or log of radioactive material and radioactive waste shipments for

the two most recent calendar years, in addition to the current calendar year.

J. Please provide at least two different radioactive waste stream sample analysis results

and resulting scaling factors for the latest two calendar years.

K. A listing of all onsite radwaste storage facilities. Please include a summary or list of the

items stored in each facility with the most recent dose rates/surveys.

L. A list of any significant (e.g., DAW, resins, Type B or greater) radioactive shipments that

will be completed during our onsite inspection period. If available, please provide the

applicable shipping manifests/waste characterizations and most recent surveys for each

shipment.

M. A list of significant changes made to the liquid or solid radwaste processing systems

since the date of the last inspection. If applicable, please provide the corresponding

UFSAR section in which this change was documented. Provide any supportive

documentation for the changes made or have it readily available for review.

N. List of radioactive waste processing systems or equipment abandoned in place since the

last inspection.

O. Please provide a schedule of radioactive material or waste processing or shipment

activities during the inspection week. Please indicate the current storage location of the

stored RAM or waste prepared for shipment, as well as any supportive surveys of its

measured dose rates. If available, please indicate its current stated waste class.

A3-10