IR 05000483/2023402

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000483/2023402
ML23088A167
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/29/2023
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Diya F
Ameren Missouri
References
IR 2023402
Download: ML23088A167 (9)


Text

March 29, 2023

SUBJECT:

CALLAWAY PLANT - SECURITY BASELINE INSPECTION REPORT 05000483/2023402

Dear Fadi Diya:

On March 9, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant and discussed the results of this inspection with Warren Witt, Senior Director, Nuclear Plant Support, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2023402

Enterprise Identifier:

I-2023-402-0019

Licensee:

Ameren

Facility:

Callaway Plant

Location:

Steedman Missouri

Inspection Dates:

March 06, 2023 to March 09, 2023

Inspectors:

D. Holman, Sr Physical Security Inspector

W. Tejada, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All requirements

Tier II: All requirements

Tier III: All requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirement

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306.

Specifically, although the licensee had initiated a physical security plan change, revision 13, in accordance with 10 CFR 50.54(p)(2), aspects of the change had not yet been fully reviewed by HQ/NSIR/DPCP/RSB in consultation with OGC.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) January 1, 2022 through January 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On March 9, 2023, the inspectors presented the security baseline inspection results to Warren Witt, Senior Director, Nuclear Plant Support, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2105504,

2105846,

2106129,

2200323,

2201049,

2202548,

2203412,

2203856,

2204062,

2204062,

2204359,

2204534,

2204592,

2204673,

2204882,

2204898,

2205100,

2208372

Miscellaneous

NEI 03-01

Nuclear Power Plant Access Authorization Program

Revision 3

APA-ZZ-00908

Fitness For Duty Programs

Revision 039

APA-ZZ-01104

Access Authorization Program For Callaway Energy Center

revision 051

SDP-SF-00050

Evaluation Of Background Investigation Data For Unescorted

Access Authorization

Revision 011

71130.01

Procedures

SDP_SF-00050

APPENDIX A

Criteria For Reapplication After An Unescorted Access

Denial

Revision 002

71130.02

Corrective Action

Documents

2204674,

2204689,

2204673,

2204672,

2204587,

2207249,

2206004,

Multiple

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2201672,

2205526,

2206536,

2207023,

2207746,

2206949,

2208423

2300042,

2300833,

2205252,

2205341,

2205731,

2205848,

2205870,

2205931,

2206071,

2206075,

2206325,

2206331,

2206384,

2206994

Corrective Action

Documents

Resulting from

Inspection

2301689,

2301719,

2301720,

Multiple

Miscellaneous

Iris Scan Desktop

Instructions

Iris Scan

09/2021

APA-ZZ-00020

CONDUCT OF SECURITY OPERATIONS

Revision 036

APA-ZZ-00204 Revision 050

APA-ZZ-00907,

APPENDIX B

PLANT ACCESS STATUS LEVELS

Revision 009

APA-ZZ-01106

LOCK AND KEY CONTROL

Revision 29

Procedures

APA-ZZ-01107

PROTECTION OF PERSONAL INFORMATION AND

ASSOCIATED ACCESS AUTHORIZATION AND FITNESS

Revision 17

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FOR DUTY RECORDS

EIP-ZZ-SK001

RESPONSE TO SECURITY EVENTS

Revision 15

HTP-ZZ-06001

HIGH RADIATION/LOCKED HIGH RADIATION/VERY HIGH

RADIATION AREA ACCESS

Revision 056

SDP-PI-AR/PO

ARMED RESPONDER/PATROL OFFICER

Revision 035

SDP-PI-BADGE

MAF BADGING

Revision 025

SDP-PI-DOORS

POSTING PORTALS/BARRIERS

Revision 020

SDP-PI-ESCORT

VEHICLE ESCORT

Revision 004

SDP-PI-KIS01

KEY ISSUE STATION

Revision 019

SDP-PI-MAFST

MAF SEARCH TRAIN

Revision 032

SDP-PI-SP/VB

SALLY PORT/VEHICLE BARRIER CHECKPOINT

Revision 009

SDP-PI-STORE

STOREROOM OFFICER

Revision 29

SDP-PI-SUPVS

Att. 5

Actions for Discovery of Contraband

Revision 23

SDP-PI-VEHAC

VEHICLE ACCESS/CONTROL

Revision 52

SDP-SF-00002

TESTING OF SECURITY EQUIPMENT

Revision 40

SDP-SF-00022

REPORTING OF SAFEGUARDS EVENTS

Revision 23

Self-Assessments Audit Report

AP22003

Nuclear Oversight Audit of Security I Cyber-Security

Programs AP22003

06/30/2022

71151

Miscellaneous

Nominalization

Factors

Performance Indicators Nominalization Factors