IR 05000483/2020411

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000483/2020411
ML20300A571
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/27/2020
From: Ray Kellar
Plant Support Branch-1
To: Diya F
Ameren Missouri
References
IR 2020411
Download: ML20300A571 (3)


Text

October 27, 2020

SUBJECT:

CALLAWAY PLANT - SECURITY BASELINE INSPECTION REPORT 05000483/2020411

Dear Mr. Diya:

On September 24, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant and discussed the results of this inspection with Mr. B. Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Callaway Plant.

The following cross-cutting aspect was assigned to a finding using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas [H.14] - Conservative Bias.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Callaway Plant. The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information -

Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000483 License No. NPF-30 Enclosure:

As stated cc w/encl: Mr. Billy Brown Manager, Security Ameren Missouri Callaway Energy Center 8315 County Road 459 Steedman, MO 65077 cc w/o encl: Distribution via LISTSERV ML20300A565 (Cover letter w/ enclosure)

ADAMS ACCESSION NUMBER: ML20300A571 (Cover letter)

Entire Report: Non-Sensitive Publicly Available x SUNSI Review x Sensitive x Non-Publicly Available Cover Letter Only: x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRP/B C:PSB1 NAME JBuchanan RLanfear RKellar NOKeefe RKellar DATE 10/26/2020 10/27/2020 10/26/2020 10/27/2020 10/27/2020