IR 05000483/2020010
| ML20167A310 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/12/2020 |
| From: | Ami Agrawal Division of Reactor Safety IV |
| To: | Diya F Ameren Missouri |
| References | |
| IR 2020010 | |
| Download: ML20167A310 (15) | |
Text
June 12, 2020
SUBJECT:
CALLAWAY PLANT - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000483/2020010
Dear Mr. Diya:
On May 7, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your Callaway Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.
Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.
Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews, the team found no evidence of challenges to your organizations safety-conscious work environment.
Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Ami N. Agrawal, Team Lead Inspection Programs and Assessment Team Division of Reactor Safety
Docket No. 05000483 License No. NPF-30
Enclosure:
As stated
Inspection Report
Docket Number:
05000483
License Number:
Report Number:
Enterprise Identifier: I-2020-010-0002
Licensee:
Union Electric Company
Facility:
Callaway Plant
Location:
Steedman, Missouri
Inspection Dates:
April 20 to May 7, 2020
Inspectors:
R. Azua, Senior Reactor Inspector
J. Braisted, Reactor Inspector
P. Jayroe, Senior Reactor Inspector
J. Melfi, Project Engineer
Approved By:
Ami N. Agrawal, Team Leader
Inspection Programs and Assessment Team
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at the Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be completed remotely.
OTHER ACTIVITIES - BASELINE
71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)
The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.
- Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems. The inspectors also conducted a five-year review of the control rod drive mechanism.
- Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits, and self-assessments.
- Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.
INSPECTION RESULTS
Assessment 71152B Effectiveness of Problem Identification: Based on the samples reviewed, the team determined that the licensee's performance in this area adequately supported nuclear safety.
Overall, the team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety. On average, the licensee was identifying and documenting approximately 562 condition reports (CRs) per month.
Effectiveness of Prioritization and Evaluation of Issues: Overall, the team found that the licensee was appropriately prioritizing and evaluating issues to support nuclear safety. Of the samples reviewed, the team found that the licensee correctly characterized each condition report as to whether it represented a condition adverse to quality, and then prioritized the evaluation and corrective actions in accordance with program guidance.
Effectiveness of Corrective Actions: Overall, the team concluded that the licensee's corrective actions supported nuclear safety. Specifically, the Callaway Plant developed effective corrective actions for the problems evaluated in the corrective action program and generally implemented these corrective actions in a timely manner commensurate with their safety significance.
- As part of this inspection, the team selected the control rod drive mechanism for a focused review within the corrective action program. For this system, the team performed sample selections of condition reports, looking at the adequacy of the licensee's evaluation process for determining which items are placed in the corrective actions process, and the corrective actions taken. The team also reviewed the licensee's use of operational experience and the Part 21 process with respect to this system. As a result of the off-site nature of this inspection, due to COVID-19 restrictions at the time of the inspection, the team was not able to walk down portions of this system. However, the team did not identify any concerns with this system.
Corrective Action Program Assessment: Based on the samples reviewed, the team determined the licensee's corrective action program complied with regulatory requirements and self-imposed standards, and the licensee's implementation of the corrective action program adequately supported nuclear safety. The team found that management's oversight of the corrective action program process was effective.
Assessment 71152B Operating Experience: The team reviewed a variety of sources of operating experience including Part 21 notifications and other vendor correspondence, NRC generic communications, and publications from various industry groups including Institute of Nuclear Power Operations (INPO) and Electric Power Research Institute (EPRI). The team determined that the Callaway Plant, is adequately screening and addressing issues identified through operational experience that apply to the station and that this information is evaluated in a timely manner once it is received.
Self-Assessments and Audit Assessments: The team reviewed a sample of the licensee's departmental self-assessments and audits to assess whether they regularly identified performance trends and effectively addressed them. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an adequate departmental self-assessment and audit process.
Assessment 71152B Safety-Conscious Work Environment: The team interviewed nine individuals. The purpose of these interviews was
- (1) to evaluate the willingness of the licensee staff to raise nuclear safety issues, either by initiating a CR or by another method,
- (2) to evaluate the perceived effectiveness of the corrective action program at resolving identified problems, and
- (3) to evaluate the licensee's safety-conscious work environment (SCWE). The focus group participants were from the security organization. Due to the challenges brought on by the COVID-19 pandemic, and the Callaway Plant's performance in this area prior to this inspection, the NRC chose to limit the number of personnel interviewed. Overall, the Callaway Plant has an adequate SCWE.
Willingness to Raise Nuclear Safety Issues: In the assessed focus group, the team found no evidence of challenges to SCWE. Individuals in this group expressed a willingness to raise nuclear safety concerns and other issues through at least one of the several means available.
Overall, the team concluded that the Callaway Plant maintained a healthy SCWE.
Employee Concerns Program: The team looked at the Callaway Plant's Employee Concerns Program (ECP). The team interviewed the ECP manager and discussed her cases.
Unfortunately, the team was unable to review the ECPs investigative packages due to the challenges created by the COVID-19 pandemic and the personal nature of the documents.
Overall, the team did not identify any concerns with the program.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified that no proprietary documents were retained or documented in this report.
- On May 7, 2020, the inspectors presented the biennial problem identification and resolution inspection results to Mr. Fadi Diya and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Condition Reports
199001400, 199301554, 201302358, 201302424,
201502077, 201502077, 201505100, 201508347,
201604507, 201604820, 201609281, 201700788,
201700883, 201704393, 201705228, 201706617,
201707190, 201707502, 201800323, 201800866,
201801304, 201801760, 201801773, 201801783,
201801971, 201802129, 201802155, 201802212,
201802362, 201802509, 201802600, 201802633,
201802725, 201802727, 201802821, 201802938,
201803026, 201803067, 201803083, 201803201,
201803204, 201803234, 201803252, 201803300,
201803405, 201803580, 201803671, 201803716,
201804026, 201804051, 201804211, 201804212,
201804236, 201804251, 201804276, 201804434,
201804579, 201804654, 201804863, 201804925,
201805870, 201806199, 201806334, 201806389,
201806479, 201806593, 201900050, 201900066,
201900103, 201900136, 201900529, 201900788,
201900887, 201901077, 201901330, 201901423,
201901550, 201901764, 201901857, 201901903,
201902606, 201902636, 201902698, 201903070,
201903222, 201903406, 201903431, 201903552,
201903596, 201903630, 201903712, 201803787,
201903832, 201904071, 201904098, 201904168,
201904171, 201904220, 201904306, 201904591,
201904713, 201904807, 201904897, 201904906,
201904921, 201904983, 201904995, 201905140,
201905145, 201905250, 201905354, 201905364,
201905440, 201905495, 201905498, 201905641,
201905652, 201905654, 201905676, 201905708,
201905718, 201905722, 201905728, 201905752,
201905777, 201905827, 201905843, 201905850,
201905859, 201905901, 201906017, 201906022,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
201906202, 201906298, 201906374, 201906404,
201906444, 201906686, 201906744, 201906847,
201906868, 201906878, 201907043, 201907047,
201907073, 201907171, 201907252, 201907361,
201907476, 201907630, 201907735, 201907784,
201907799, 201907807, 201907876, 201907884,
201907900, 201907951, 201907960, 201907973,
201908019, 201908040, 202000122, 202000212,
2000245, 202000314, 202000346, 202000352,
2000360, 202000364, 202000367, 202000371,
2000393, 202000476, 202000491, 202000511,
2000598, 202000625, 202000628, 202000689,
2000825, 202000856, 202000975, 202001216,
2001264, 202001296, 202001417, 202001438,
2001455, 202001556, 202001566, 202001573,
2001602, 202001983, 202001999, 202002007,
2002018, 202002025
Drawing
110D873
Rod Drive Power Supply System Reactor Trip Switchgear
Rod Drive MG Set - Outline
A
3688C42-S011
Generator No. 1 Voltage Regulator
E-23SF21
Schematic Diagram Rod Drive M-G Sets
J-23SF01A
Rod Control Loop Diagram, Sheet 1 of 2
J-23SF01B
Rod Control Loop Diagram, Sheet 2 of 2
M-U2GD01 (Q)
Piping and Instrumentation Diagram Essential Service Water
Pumphouse & Ultimate Heat Sink Elec. Rm. HVAC
Miscellaneous
Night Order: Atmospheric Steam Dump Insulation
01/09/2019
Night Order: Boric Acid Identification and Monitoring During
Implementation of POL0049
03/23/2020
Night Order: Guidance for NN Inverter Alignment Following
Inverter Failure
11/15/2019
Night Order: RCP Vibration Inputs Defeated to Annunciators
70A and 70B
08/20/2019
Night Order: Sluggish Operation of the Moveable Gripper on
Control Rod H08
03/19/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Night Order: Steam Generator and RCS Pressure
Equalization
11/26/2019
Night Order: Temporary Safety Monitor Thresholds
Accounting for BBHV8000B Closure
09/16/2019
Night Order: Trigger Points and Actions for Elevated Main
Generator Hydrogen Consumption Levels
04/14/2020
Nuclear Oversight Audit of Operations and Chemistry -
AP19003
06/18/2019
Nuclear Oversight Audit of Materials Services - AP20001
2/26/2020
Callaway Semiannual Trend Report - July through
December 2019
Employee Concerns Program - ECP Investigator's Desk Top
Instructions
Proprietary
Document
April 2013,
Revision 0
AUCA 20190005
Unplanned Loss of 'B' Switchyard Bus
07/18/2019
LER 1985-022-00 Manual Reactor Trips following CRD motor Generator Output
Breaker Trips
05/10/1985
LER 1985-026-00 Dropped Control Rods Cause High Negative Flux Rate
07/08/1985
LER 1986-024-02
Technical Specification 3.0.3 Entered Due to a Rod Control
Card Failure
01/30/1987
LER 1986-029-00
Manual Reactor Trip Due to a Rod Control Card Failure
09/23/1986
LER 1990-002-00 Electrical Problem in the Control Rod System Led to a
Condition Prohibited by the Plant's Technical Specifications
and a Temporary Waiver of Compliance
03/05/90
LER 1990-009-00 Technical Specification (3.0.3) Entry Due to Loss of the
Digital Rod Position Indication System on a Failed Central
Control Card
09/04/1990
Training Manual
T63.0110 6 Rod Control System Introduction
2/15/1987
Training Manual
T61.0110.6/T61.016D.6 SF -Rod Control Systems
6/6/2016
Training Manual
T63.0110.6 Rod Control Logic Cabinet
2/15/1987
Training Manual
T63.0110.6 Rod Control System Power Cabinet
2/15/1987
Procedures
A210.0012
Operating Quality Assurance Manual (OQAM)
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
APA-ZZ-00500
Corrective Action Program
APA-ZZ-00500,
Appendix 1
APA-ZZ-00500
Appendix 3
Past-OP Reportability
APA-ZZ-00500,
Appendix 7
Effectiveness Reviews
APA-ZZ-00500,
Appendix 8
Corrective Action Program Training Requirements
APA-ZZ-00500,
Appendix 10
Trending Program
APA-ZZ-00500,
Appendix 12
Significant Adverse Condition - ADCN-1
APA-ZZ-00500,
Appendix 13
Adverse Condition - ADCN-2
APA-ZZ-00500,
Appendix 14
Adverse Condition - ADCN-3
APA-ZZ-00500,
Appendix 15
Adverse Condition - ADCN-4
APA-ZZ-00500,
Appendix 16
Other Issue - OI-A
APA-ZZ-00500,
Appendix 17
Screening Process Guidelines
APA-ZZ-00500,
Appendix 18
Equipment Failure Analysis
APA-ZZ-00500,
Appendix 19
Common Cause Evaluation (CCE)
APA-ZZ-00500,
Appendix 21
Other Issues - OI-B
APA-ZZ-00500
Appendix 22
Corrective Action Program Definitions
APA-ZZ-00930
Employee Concerns Program
APA-ZZ-00932
Nuclear Safety Culture
APA-ZZ-00932,
Nuclear Safety Culture Monitoring
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Appendix 1
APA-ZZ-01400,
Appendix A
Callaway Self-Assessment and Benchmarking Program
APA-ZZ-01400,
Appendix E
Operating Experience
APA-ZZ-01400,
Appendix F
Performance Indicators
ATX-ADM-3205
Transmission Design Engineering Design Quality Review
Process
06/01/2019
EDP-ZZ-04026
CFR Part 21 Evaluations
EDP-ZZ-04107
HVAC Pressure Boundary Control
2, 33
EDP-ZZ-06000
Vendor Equipment Technical Information Review Program
EE-006
Electrical Design Criteria/Inputs
LDP-ZZ-00500
Corrective Action Review Board
MPM-SK-QW001
Service and Inspection of Plant Doors
NISP-PI-02
Conduct of Self-Assessments and Benchmarks
ODP-AA-00002
Equipment Status Control
ODP-ZZ-00001
Operations Department - Code of Conduct
106
ODP-ZZ-00001,
Addendum 10
Reactivity Management / Operating Philosophy
ODP-ZZ-00001,
Addendum 3
Crew Performance and Qualifications
ODP-ZZ-00001,
Addendum 12
Operator Burdens and Workarounds
ODP-ZZ-00002,
Appendix 2
Risk Management Actions for Planned Risk Significant
Activities
ODP-ZZ-00014
Operational Mode Change Requirements
54, 55
OTA-RK-00026
Turbine Exhaust Hood Temperature High
OTG-ZZ-00002
Reactor Startup - IPTE
OTN-AC-00001
Main Turbine and Generator Systems
PDP-ZZ-00023
Work Screening and Processing
PDP-ZZ-00023,
Appendix A
Priority Screening Matrix
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
ZZ-009
Pre-Job Activities for Engineering Change Packages and
Engineering Documents
Self-Assessments AP19001
Radiation Protection Audit
03/27/2019
AP19004
Maintenance, Work Management, and M&TE Programs
Audit
08/29/2019
AP19005
Audit Report - Nuclear Oversight Audit of the Corrective
Action Program
10/23/2019
FSA 201807096-
015
Formal Self-Assessment - Standard Design
07/25/2019
FSA 201820044-
071
Electrical Safety / Formal Self-Assessment
01/16/2019
FSA 201900029-
006
Formal Self Assessment - EQ Program
03/28/2019
OSA 201900029-
047
STARS Maintenance Self-Assessment 2019
06/20/2019
SA 202001257
Self Assessment - Boric Acid Program
03/05/2020
SBM 201820044-
2
Cross Checks and Confirmations / Simple Benchmark
06/24/2019
SBM 201820044-
068
Passive Monitoring / Simple Benchmark
06/24/2019
SSA 201500920-
Self-Assessment and Benchmark Program
11/24/2015
SSA 201807096-
005
Maintenance Lockout / Simple Self-Assessment
07/02/2018
SSA 201807096-
010/201900029-
036
Instrument Program and Pre-NRC Inspection
03/31/2019
SSA 201820044-
2
Simple Self-Assessment - ASME IWL Program -
Containment Post Tensioning
07/31/2019
SSA 201820044-
019
Simple Self-Assessment - ASME GL89-13 Program
10/19/2018
SSA 201820044-
20
Simple Self-Assessment - ASME Maintenance Rule
05/23/2018
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SSA 201820044-
23
Housekeeping/Material Storage
01/10/2019
SSA 201820044-
064
NRC Pre Inspection Self Assessment - Rad Safety ALARA
Planning and Occupational Dose Assessment
06/14/2018
SSA 201820044-
066
Simple Self-Assessment - ASME Fire Protection Program
11/11/2018
SSA 201900029-
2
Simple Self-Assessment - ASME EN.1 Assessment on Key
Component Specifications
2/15/2019
SSA 201900029-
21
MFIN Walkdown Effectiveness
01/09/2020
SSA 201900029-
2
Effluent Leak Management (ELM) Program
2/17/2019
SSA 201900029-
23
Effectiveness of Lifting & Rigging Program
07/16/2019
SSA 201900029-
27
Shipping / Returns
2/20/2019
SSA 2019-00029-
28
Procurement / Acceptance / Return backlogs
01/31/2020
SSA-201900029-
29
Parts issue with oxidation, corrosion rust that had a job or
plant impact
01/16/2020
SSA-201900029-
2
Reactivity Management
2/01/2019
SSA 201900029-
035
Shipping Program
04/29/2019
SSA 201900029-
048
Simple Self-Assessment - ASME Maintenance Rule (a)(3)
Assessment
10/03/2019
Work Orders
16002805, 17005384, 18001142, 18001740, 18001740,
18002534, 18003289, 18003541, 19000268, 19001090,
19002935, 19003307, 19005361, 20000522,