August 02, 2022
SUBJECT:
CALLAWAY PLANT TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000483 022011
Dear Mr. Diya:
On July 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant. On July 14, 2022, the NRC inspectors discussed the results of this inspection with Mr. B. Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, James F. Drake, Acting Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30
Enclosure:
As stated
Inspection Report
Docket Number:
05000483
License Number:
Report Number:
Enterprise Identifier:
I-2022-011-0002
Licensee:
Ameren Missouri
Facility:
Callaway Plant
Location:
Steedman, MO
Inspection Dates:
June 27, to July 14, 2022
Inspectors:
G. Pick, Senior Reactor Inspector, Team Leader
R. Deese, Senior Reactor Analyst
J. Drake, Senior Reactor Inspector
J. Lee, Reactor Inspector
B. Pinson, Reactor Inspector
Approved By:
James F. Drake, Acting Chief
Engineering Branch 2
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (Ips) in effect at the beginning of the inspection unless otherwise noted. Currently approved Ips with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Operator actions could be accomplished as assumed in the licensees fire probabilistic risk assessment analysis and safe shutdown analysis for fire area C-27 for a control room evacuation.
- (2) Ensured that post maintenance tests and/or surveillance activities were performed as scheduled for the underground fire loop, fire pumps, sprinkler system in the cable spreading room, and halon gas system for engineered safety features switchgear room B.
- (3) Walked down the sprinkler system and fire pumps to identify equipment alignment discrepancies. Inspected for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
- (4) Ensured that fire protection components were being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verified that the aging management program activities associated with fire protection equipment were being implemented.
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected controls or processes were implemented in accordance with the licensees current licensing basis. If applicable, ensured that the fire protection program contains adequate procedures to implement the selected administrative controls. Verified that the selected administrative controls meet the requirements of all committed industry standards.
(1)hot work, fire impairment, and combustible control programs (2)fire probabilistic safety assessment monitoring for classic fire protection activities and comparing actual equipment unavailability to unavailability assumed in the probabilistic risk assessment
Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)
The inspectors verified the following:
a)
Changes to the approved fire protection program did not constitute an adverse effect on the ability to safely shutdown.
b)
If applicable, the adequacy of the design modification was appropriate c)
Assumptions and performance capability stated in the safe shutdown analyses had not been degraded through changes or modifications.
d)
The fire protection program documents, such as the updated final safety analysis report, fire protection report, fire hazards analysis, and safe shutdown analysis were updated consistent with the fire protection program or design change.
e)
Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) The inspectors reviewed the following as one sample:
FPR00000217, Detailed Fire Modeling Report for Fire Compartment A-27
FPR00000253, RFR 180096 - Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond
FPR00000256, Code Compliance Evaluation NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants - Fire Safety Analysis for Fire Area YD-1
FPR00000269, Eliminate the Main Feedwater Regulating Valve Single Point Vulnerability and Improve Reliability
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On July 14, 2022, the inspectors presented the triennial fire protection inspection results to Mr. B. Cox, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Calculations
FAI/10-504
Callaway Plant MAAP 4.0.7 Fire PRA Sequences
71111.21N.05
Calculations
KC-101
Fire Safety Analysis Calculation; Control Room AC and
Filtration Unit B
71111.21N.05
Calculations
KC-11
Halon Concentration in ESF (Engineered Safety Feature)
Room
71111.21N.05
Calculations
KC-118
Fire Safety Analysis for Fire Area C-7 Lower Cable
Spreading Room
71111.21N.05
Calculations
KC-121
Fire Safety Analysis Calculation; ESF Switchgear Room B
71111.21N.05
Calculations
KC-131
Fire Safety Analysis Control Building Cable Chase B at
column C-6, Control Building, El. 2016
71111.21N.05
Calculations
KC-132
Fire Safety Analysis for Fire Area C-21 Control Building
North Cable Chase, Control Building, El. 1984
71111.21N.05
Calculations
KC-138
Fire Safety Analysis Calculation; Control Room Area
71111.21N.05
Calculations
KC-163
Callaway Fire Protection Monitoring Program
71111.21N.05
Calculations
KC-79
Detailed Fire Modeling Report; Control Room AC and
Filtration Unit B, Auxiliary Building El. 2047'
71111.21N.05
Calculations
PRA-FIRE-
1761_010B
Callaway NFPA 805 Fire PRA Main Control Room Fire
Analysis
71111.21N.05
Corrective Action
Documents
200307294, 201600295, 201802073, 201802382,
201802946, 201803445, 201805199, 201900332,
201900486, 201903645, 201905207, 201905471,
201907897, 202000651, 202000842, 202002294,
2002649, 202002816, 202002817, 202005101,
2005300, 202100265, 202101297, 202102009,
2102014, 202103490, 202103636, 202103687,
2103934, 202104129, 202104221, 202104227,
2104887, 202105541, 202105665, 202106308,
2106360, 202200902, 202201303, 202201303,
2201598, 202201972, 202204284
71111.21N.05
Corrective Action
Documents
Resulting from
2204380, 202204389, 202204390, 202204401,
2204408, 202204411, 202204439, 202204459,
2204495
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Inspection
71111.21N.05
Drawings
8600-X-88448
Piping - Plans Fire Loop and Laterals Fire Protection
System
71111.21N.05
Drawings
8600-X-88773
Piping - Plans Fire Loop and Laterals Fire Protection
System
71111.21N.05
Drawings
8600-X-89638
Piping and Instrumentation Diagram - Yard Fire Loop Fire
Protection System
71111.21N.05
Drawings
8600-X-89639
Piping and Instrumentation Diagram - Yard Fire Loop Fire
Protection System
71111.21N.05
Drawings
8600-X-89745
Site Plan Cathodic Protection Equipment, Sheet 1 of 2
71111.21N.05
Drawings
8600-X-89746
Site Plan Cathodic Protection Equipment, Sheet 2 of 2
71111.21N.05
Drawings
8600-X-90327
Fire Protection System Yard Layout and Pumphouse One
Line Diagram
71111.21N.05
Drawings
2
Architectural Fire Delineation Floor Plan, El. 2000' - 0"
71111.21N.05
Drawings
A-2803
Architectural Fire Delineation Floor Plan, El. 2026' - 0"
71111.21N.05
Drawings
A-2804
Architectural Fire Delineation Floor Plan, El. 2047' - 6"
71111.21N.05
Drawings
M-21KC03
System Flow Diagram Halon Fire Protection Systems
A
71111.21N.05
Engineering
Changes
MP 08-0027
Main Turbine Controls Replacement
71111.21N.05
Engineering
Changes
MP 16-0024
SGK05 Supplemental Cooling System
71111.21N.05
Engineering
Changes
MP 18-0039
Replace Main Turbine Generator Governor Controls -
Mechanical - Associated with MP 08-0027
71111.21N.05
Engineering
Changes
MP 19-0018
RFR 180096 - UHS Cooling Tower Return to UHS Pond
71111.21N.05
Engineering
Changes
MP 19-0102p
Reroute Oily Waste Piping Around Fire Pumphouse Sum
71111.21N.05
Engineering
Changes
MP 21-0008
Upgrade the ALSPACARE system
71111.21N.05
Engineering
Changes
MP20-0006
UHS (Ultimate Heat Sink) Cooling Tower Fan Motor
Circuits Relay Replacement
71111.21N.05
Engineering
Evaluations
17671-013/R008
Callaway NFPA 805 Fire PRA Integrated Risk Report
71111.21N.05
Engineering
CW-AMP-B2.1.25
Buried and Underground Piping and Tanks
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Evaluations
71111.21N.05
Miscellaneous
Buried and Underground Piping and Tanks Focused
Inspection Results
71111.21N.05
Miscellaneous
Raw Water Corrosion Monitoring Program Long Term
Asset Management Plan
71111.21N.05
Miscellaneous
FPR00000217
Detailed Fire Modeling Report for Fire Compartment A-27
4/28/2020
71111.21N.05
Miscellaneous
FPR00000253
RFR 180096 - UHS Cooling Tower Return to UHS Pond
4/20/2021
71111.21N.05
Miscellaneous
FPR00000256
Code Compliance Evaluation NFPA 805, Performance
Based Standard for Fire Protection for Light Water
Reactor Electric Generating Plants - Fire Safety Analysis
for Fire Area YD-1
5/28/2021
71111.21N.05
Miscellaneous
FPR00000269
Eliminate the Main Feedwater Regulating Valve Single
Point Vulnerability and Improve Reliability
2/22/2021
71111.21N.05
Miscellaneous
SI Project No.
1000062
Site Specific Risk Report: Callaway Nuclear Plant
71111.21N.05
Miscellaneous
TDB-001
Callaway Energy Center Tank Data Book
71111.21N.05
Procedures
A210.0098
Fire Preplan Manual
71111.21N.05
Procedures
APA-ZZ-00320
Work Execution
71111.21N.05
Procedures
APA-ZZ-00395
Significant Operator Response Timing
71111.21N.05
Procedures
APA-ZZ-00500
Corrective Action Program
71111.21N.05
Procedures
APA-ZZ-00600
Design Change Control
71111.21N.05
Procedures
APA-ZZ-00604
Requests for Resolution
71111.21N.05
Procedures
APA-ZZ-00700
71111.21N.05
Procedures
APA-ZZ-00701
Control of Fire Protection Impairments
71111.21N.05
Procedures
APA-ZZ-00703
Fire Protection Operability Criteria and Surveillance
Requirements
71111.21N.05
Procedures
APA-ZZ-00703,
NFPA 805 Required Sprinkler/Spray Systems
71111.21N.05
Procedures
APA-ZZ-00703,
NFPA 805 Required Halon Systems
71111.21N.05
Procedures
APA-ZZ-00741
Control of Combustible Materials
71111.21N.05
Procedures
APA-ZZ-00742
Control of Ignition Sources
71111.21N.05
Procedures
APA-ZZ-00743
Fire Team Organization and Duties
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05
Procedures
APA-ZZ-00750
Hazard Barrier Program
71111.21N.05
Procedures
EDP-ZZ-01011
Buried Pipe Inspection Program
71111.21N.05
Procedures
EDP-ZZ-01101
Fire Protection Monitoring Program
71111.21N.05
Procedures
EDP-ZZ-01131
Appendix J
System Trending and Monitoring Plans (STAMPS)
71111.21N.05
Procedures
EDP-ZZ-01137
License Renewal Implementation
71111.21N.05
Procedures
EDP-ZZ-04044
Fire Protection Reviews
71111.21N.05
Procedures
EDP-ZZ-04600
Engineering Change Control
71111.21N.05
Procedures
Appendix 1
Initial Training Course Agenda
71111.21N.05
Procedures
HTP-ZZ-01203
Radiological Area Access Control
71111.21N.05
Procedures
MSM-KC-FW004
Fire Hose Hydrostatic Testing
71111.21N.05
Procedures
ODP-ZZ-00001
Operations Department - Code of Conduct
108
71111.21N.05
Procedures
Auxiliary Shutdown Panel Controls Test
71111.21N.05
Procedures
OTN-KC-00001
Fire Protection System
71111.21N.05
Procedures
OTO-KC-00001
Fire Response
71111.21N.05
Procedures
OTO-ZZ-00001
Control Room Inaccessibility
71111.21N.05
Procedures
OTO-ZZ-00002
Control Room Operations with Fire
71111.21N.05
Self-
Assessments
FP Program Health Report 4th Qtr 2021
6/16/2022
71111.21N.05
Self-
Assessments
FP System Health Report 2nd Qtr 2021
10/26/2021
71111.21N.05
Self-
Assessments
2200120-018
3/21/2022
71111.21N.05
Self-
Assessments
AP21004
Nuclear Oversight Audit of Fire Protection Program
6/22/2021
71111.21N.05
Work Orders
00512381, 06113184, 16508710, 18002360, 18506235,
19005269, 19507001, 19508225, 20001167, 20001791,
20003675, 20506737, 21000953, 21004244, 21004245,
2002102, 22502161