Triennial Fire Protection Inspection Report 05000483/2022011
ML22213A058
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/02/2022
From: James Drake
NRC/RGN-IV/DORS/EB2
To: Diya F
Ameren Missouri
References
IR 2022011
Download: ML22213A058 (10)


Text

August 02, 2022

SUBJECT:

CALLAWAY PLANT TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000483 022011

Dear Mr. Diya:

On July 14, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant. On July 14, 2022, the NRC inspectors discussed the results of this inspection with Mr. B. Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James F. Drake, Acting Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2022011

Enterprise Identifier:

I-2022-011-0002

Licensee:

Ameren Missouri

Facility:

Callaway Plant

Location:

Steedman, MO

Inspection Dates:

June 27, to July 14, 2022

Inspectors:

G. Pick, Senior Reactor Inspector, Team Leader

R. Deese, Senior Reactor Analyst

J. Drake, Senior Reactor Inspector

J. Lee, Reactor Inspector

B. Pinson, Reactor Inspector

Approved By:

James F. Drake, Acting Chief

Engineering Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (Ips) in effect at the beginning of the inspection unless otherwise noted. Currently approved Ips with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Operator actions could be accomplished as assumed in the licensees fire probabilistic risk assessment analysis and safe shutdown analysis for fire area C-27 for a control room evacuation.
(2) Ensured that post maintenance tests and/or surveillance activities were performed as scheduled for the underground fire loop, fire pumps, sprinkler system in the cable spreading room, and halon gas system for engineered safety features switchgear room B.
(3) Walked down the sprinkler system and fire pumps to identify equipment alignment discrepancies. Inspected for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
(4) Ensured that fire protection components were being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verified that the aging management program activities associated with fire protection equipment were being implemented.

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected controls or processes were implemented in accordance with the licensees current licensing basis. If applicable, ensured that the fire protection program contains adequate procedures to implement the selected administrative controls. Verified that the selected administrative controls meet the requirements of all committed industry standards.

(1)hot work, fire impairment, and combustible control programs (2)fire probabilistic safety assessment monitoring for classic fire protection activities and comparing actual equipment unavailability to unavailability assumed in the probabilistic risk assessment

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

The inspectors verified the following:

a)

Changes to the approved fire protection program did not constitute an adverse effect on the ability to safely shutdown.

b)

If applicable, the adequacy of the design modification was appropriate c)

Assumptions and performance capability stated in the safe shutdown analyses had not been degraded through changes or modifications.

d)

The fire protection program documents, such as the updated final safety analysis report, fire protection report, fire hazards analysis, and safe shutdown analysis were updated consistent with the fire protection program or design change.

e)

Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) The inspectors reviewed the following as one sample:

FPR00000217, Detailed Fire Modeling Report for Fire Compartment A-27

FPR00000253, RFR 180096 - Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond

FPR00000256, Code Compliance Evaluation NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants - Fire Safety Analysis for Fire Area YD-1

FPR00000269, Eliminate the Main Feedwater Regulating Valve Single Point Vulnerability and Improve Reliability

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 14, 2022, the inspectors presented the triennial fire protection inspection results to Mr. B. Cox, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05

Calculations

FAI/10-504

Callaway Plant MAAP 4.0.7 Fire PRA Sequences

71111.21N.05

Calculations

KC-101

Fire Safety Analysis Calculation; Control Room AC and

Filtration Unit B

71111.21N.05

Calculations

KC-11

Halon Concentration in ESF (Engineered Safety Feature)

Room

71111.21N.05

Calculations

KC-118

Fire Safety Analysis for Fire Area C-7 Lower Cable

Spreading Room

71111.21N.05

Calculations

KC-121

Fire Safety Analysis Calculation; ESF Switchgear Room B

71111.21N.05

Calculations

KC-131

Fire Safety Analysis Control Building Cable Chase B at

column C-6, Control Building, El. 2016

71111.21N.05

Calculations

KC-132

Fire Safety Analysis for Fire Area C-21 Control Building

North Cable Chase, Control Building, El. 1984

71111.21N.05

Calculations

KC-138

Fire Safety Analysis Calculation; Control Room Area

71111.21N.05

Calculations

KC-163

Callaway Fire Protection Monitoring Program

71111.21N.05

Calculations

KC-79

Detailed Fire Modeling Report; Control Room AC and

Filtration Unit B, Auxiliary Building El. 2047'

71111.21N.05

Calculations

PRA-FIRE-

1761_010B

Callaway NFPA 805 Fire PRA Main Control Room Fire

Analysis

71111.21N.05

Corrective Action

Documents

200307294, 201600295, 201802073, 201802382,

201802946, 201803445, 201805199, 201900332,

201900486, 201903645, 201905207, 201905471,

201907897, 202000651, 202000842, 202002294,

2002649, 202002816, 202002817, 202005101,

2005300, 202100265, 202101297, 202102009,

2102014, 202103490, 202103636, 202103687,

2103934, 202104129, 202104221, 202104227,

2104887, 202105541, 202105665, 202106308,

2106360, 202200902, 202201303, 202201303,

2201598, 202201972, 202204284

71111.21N.05

Corrective Action

Documents

Resulting from

2204380, 202204389, 202204390, 202204401,

2204408, 202204411, 202204439, 202204459,

2204495

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

71111.21N.05

Drawings

8600-X-88448

Piping - Plans Fire Loop and Laterals Fire Protection

System

71111.21N.05

Drawings

8600-X-88773

Piping - Plans Fire Loop and Laterals Fire Protection

System

71111.21N.05

Drawings

8600-X-89638

Piping and Instrumentation Diagram - Yard Fire Loop Fire

Protection System

71111.21N.05

Drawings

8600-X-89639

Piping and Instrumentation Diagram - Yard Fire Loop Fire

Protection System

71111.21N.05

Drawings

8600-X-89745

Site Plan Cathodic Protection Equipment, Sheet 1 of 2

71111.21N.05

Drawings

8600-X-89746

Site Plan Cathodic Protection Equipment, Sheet 2 of 2

71111.21N.05

Drawings

8600-X-90327

Fire Protection System Yard Layout and Pumphouse One

Line Diagram

71111.21N.05

Drawings

2

Architectural Fire Delineation Floor Plan, El. 2000' - 0"

71111.21N.05

Drawings

A-2803

Architectural Fire Delineation Floor Plan, El. 2026' - 0"

71111.21N.05

Drawings

A-2804

Architectural Fire Delineation Floor Plan, El. 2047' - 6"

71111.21N.05

Drawings

M-21KC03

System Flow Diagram Halon Fire Protection Systems

A

71111.21N.05

Engineering

Changes

MP 08-0027

Main Turbine Controls Replacement

71111.21N.05

Engineering

Changes

MP 16-0024

SGK05 Supplemental Cooling System

71111.21N.05

Engineering

Changes

MP 18-0039

Replace Main Turbine Generator Governor Controls -

Mechanical - Associated with MP 08-0027

71111.21N.05

Engineering

Changes

MP 19-0018

RFR 180096 - UHS Cooling Tower Return to UHS Pond

71111.21N.05

Engineering

Changes

MP 19-0102p

Reroute Oily Waste Piping Around Fire Pumphouse Sum

71111.21N.05

Engineering

Changes

MP 21-0008

Upgrade the ALSPACARE system

71111.21N.05

Engineering

Changes

MP20-0006

UHS (Ultimate Heat Sink) Cooling Tower Fan Motor

Circuits Relay Replacement

71111.21N.05

Engineering

Evaluations

17671-013/R008

Callaway NFPA 805 Fire PRA Integrated Risk Report

71111.21N.05

Engineering

CW-AMP-B2.1.25

Buried and Underground Piping and Tanks

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Evaluations

71111.21N.05

Miscellaneous

Buried and Underground Piping and Tanks Focused

Inspection Results

71111.21N.05

Miscellaneous

Raw Water Corrosion Monitoring Program Long Term

Asset Management Plan

71111.21N.05

Miscellaneous

FPR00000217

Detailed Fire Modeling Report for Fire Compartment A-27

4/28/2020

71111.21N.05

Miscellaneous

FPR00000253

RFR 180096 - UHS Cooling Tower Return to UHS Pond

4/20/2021

71111.21N.05

Miscellaneous

FPR00000256

Code Compliance Evaluation NFPA 805, Performance

Based Standard for Fire Protection for Light Water

Reactor Electric Generating Plants - Fire Safety Analysis

for Fire Area YD-1

5/28/2021

71111.21N.05

Miscellaneous

FPR00000269

Eliminate the Main Feedwater Regulating Valve Single

Point Vulnerability and Improve Reliability

2/22/2021

71111.21N.05

Miscellaneous

SI Project No.

1000062

Site Specific Risk Report: Callaway Nuclear Plant

71111.21N.05

Miscellaneous

TDB-001

Callaway Energy Center Tank Data Book

71111.21N.05

Procedures

A210.0098

Fire Preplan Manual

71111.21N.05

Procedures

APA-ZZ-00320

Work Execution

71111.21N.05

Procedures

APA-ZZ-00395

Significant Operator Response Timing

71111.21N.05

Procedures

APA-ZZ-00500

Corrective Action Program

71111.21N.05

Procedures

APA-ZZ-00600

Design Change Control

71111.21N.05

Procedures

APA-ZZ-00604

Requests for Resolution

71111.21N.05

Procedures

APA-ZZ-00700

Fire Protection Program

71111.21N.05

Procedures

APA-ZZ-00701

Control of Fire Protection Impairments

71111.21N.05

Procedures

APA-ZZ-00703

Fire Protection Operability Criteria and Surveillance

Requirements

71111.21N.05

Procedures

APA-ZZ-00703,

NFPA 805 Required Sprinkler/Spray Systems

71111.21N.05

Procedures

APA-ZZ-00703,

NFPA 805 Required Halon Systems

71111.21N.05

Procedures

APA-ZZ-00741

Control of Combustible Materials

71111.21N.05

Procedures

APA-ZZ-00742

Control of Ignition Sources

71111.21N.05

Procedures

APA-ZZ-00743

Fire Team Organization and Duties

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05

Procedures

APA-ZZ-00750

Hazard Barrier Program

71111.21N.05

Procedures

EDP-ZZ-01011

Buried Pipe Inspection Program

71111.21N.05

Procedures

EDP-ZZ-01101

Fire Protection Monitoring Program

71111.21N.05

Procedures

EDP-ZZ-01131

Appendix J

System Trending and Monitoring Plans (STAMPS)

71111.21N.05

Procedures

EDP-ZZ-01137

License Renewal Implementation

71111.21N.05

Procedures

EDP-ZZ-04044

Fire Protection Reviews

71111.21N.05

Procedures

EDP-ZZ-04600

Engineering Change Control

71111.21N.05

Procedures

FPP-ZZ-00009,

Appendix 1

Initial Training Course Agenda

71111.21N.05

Procedures

HTP-ZZ-01203

Radiological Area Access Control

71111.21N.05

Procedures

MSM-KC-FW004

Fire Hose Hydrostatic Testing

71111.21N.05

Procedures

ODP-ZZ-00001

Operations Department - Code of Conduct

108

71111.21N.05

Procedures

OSP-RP-00002

Auxiliary Shutdown Panel Controls Test

71111.21N.05

Procedures

OTN-KC-00001

Fire Protection System

71111.21N.05

Procedures

OTO-KC-00001

Fire Response

71111.21N.05

Procedures

OTO-ZZ-00001

Control Room Inaccessibility

71111.21N.05

Procedures

OTO-ZZ-00002

Control Room Operations with Fire

71111.21N.05

Self-

Assessments

FP Program Health Report 4th Qtr 2021

6/16/2022

71111.21N.05

Self-

Assessments

FP System Health Report 2nd Qtr 2021

10/26/2021

71111.21N.05

Self-

Assessments

2200120-018

22 Fire Protection Program

3/21/2022

71111.21N.05

Self-

Assessments

AP21004

Nuclear Oversight Audit of Fire Protection Program

6/22/2021

71111.21N.05

Work Orders

00512381, 06113184, 16508710, 18002360, 18506235,

19005269, 19507001, 19508225, 20001167, 20001791,

20003675, 20506737, 21000953, 21004244, 21004245,

2002102, 22502161