Security Baseline Inspection Report 05000483/2021402
ML21295A339
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/26/2021
From: Ray Kellar
Plant Support Branch-1
To: Diya F
Ameren Missouri
References
IR 2021402
Download: ML21295A339 (8)


Text

October 25, 2021

SUBJECT:

CALLAWAY PLANT - SECURITY BASELINE INSPECTION REPORT 05000483/2021402

Dear Mr. Diya:

On October 8, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant. On October 7, 2021, the NRC inspectors discussed the results of this inspection with Mr. Barry Cox, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 05000483 License No. NPF-30

Enclosure:

As stated

Inspection Report

Docket Number:

05000483

License Number:

NPF-30

Report Number:

05000483/2021402

Enterprise Identifier:

I-2021-402-0003

Licensee:

Ameren Missouri

Facility:

Callaway Plant

Location:

Steedman, Missouri

Inspection Dates:

October 4, 2021 to October 7, 2021

Inspectors:

C. Jewett, Physical Security Inspector

A. Meyen, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with Title 10 of the Code of Federal Regulations 50.54(p)(2) since the implementation of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) January 1, 2020 through August 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 7, 2021, the inspectors presented the security baseline inspection results to Mr. Barry Cox, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

201703357

201703393

201703394

201703397

201704968

201800411

201801086

201801314

201801508

201802778

201901102

201904203

2003035

2003150

2003207

2004642

2106838

2104105

Miscellaneous

SELRs

Security Event Logs

2/21 - 09/21

APA-ZZ-00902

Personnel Additions, Changes, Terminations, and Access

Withdrawal

APA-ZZ-00906

Behavior Observation Techniques

APA-ZZ-00907

Approval Authority for Unescorted Access Authorization

SDP-SF-00050

Evaluation of Background Investigation Data for Unescorted

Access Authorization

Procedures

XDP-AC-00002

Administration of Psychological Evaluations

71130.01

Self-Assessments

SP21004

AA/FFD Biennial Review Surveillance Report

08/12/2021

71130.02

Corrective Action

Documents

2002809,

2003313,

2006318,

2103387

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

2105610,

2105611

APA-ZZ-00204

Safeguards Information

047

APA-ZZ-1105

Site Access

048

SDP-PI-AR/PO

Armed Responder/Patrol Officer

031

SDP-PI-BADGE

MAF Badging

23

SDP-PI-DOORS

Posting Portals/Barriers

017

SDP-PI-ESCORT

Vehicle Escort

001

SDP-PI-KIS01

Key Issue Station

018

SDP-PI-MAFST

MAF Search Train

28

SDP-PI-SP/VB

Sally Port/Vehicle Barrier Checkpoint

004

SDP-PI-STORE

Storeroom Officer

26

Procedures

SDP-PI-VEHAC

Vehicle Access/Control

048

Self-Assessments

NRC Security Baseline Inspection Readiness Assessment

Checklist, IP 71130.02

08/23/2021